Mobile Infrastructure andLong-term SolutionsThis presentation is designed to be amended before presentation to customers. You may want to remove all references to cost (indicated in red) which are included for the benefit of account managers. Full details are included in the Workplace Price guide.

Page 2: SunGard Mobile Infrastructure and long-term solutions

2© 2010 SunGard. | www.sungard.co.uk

What are Mobile Infrastructure and Long-term Solutions?

Mobile Infrastructure Solutions

Solutions delivered in 48 hours or less and designed to mitigate the effects of a disaster.

Long-term Solutions

Computer Equipment Room (CER) or Workplace constructed on your car park, over 5–20 days and available

for long periods (up to 2 years or more).

Page 3: SunGard Mobile Infrastructure and long-term solutions

3© 2010 SunGard. | www.sungard.co.uk

Long-term Solutions

Modular, high specification construction

1,000–13,700 sq ft of CER (63–344 kW cooling)

30–300 positions of Workplace Recovery

…or a combination ofWorkplace Recovery and CER

Erected within 5–20 days

Occupation for up to 2 years (longer with planning permission)

Minimal site preparation required

Initial survey included

Regularly tested

Cost-effective (£2,000 to £25,000 pa)

No invocation charge (cost +15% administration charge).

Page 4: SunGard Mobile Infrastructure and long-term solutions

4© 2010 SunGard. | www.sungard.co.uk

Long-term Site Requirements

Site requirements Reasonably level site Hard standing Access for articulated vehicles Access for 25T crane Space for external air-conditioning

units, access ramps and generator

Optional preparation Power Communications Foundation pads (for green field sites) Planning permission.

Page 5: SunGard Mobile Infrastructure and long-term solutions

5© 2010 SunGard. | www.sungard.co.uk

Long-term Construction Process

Foundations laid outand levelled

Flat pack units (4 per truck) lifted into position.

Page 6: SunGard Mobile Infrastructure and long-term solutions

6© 2010 SunGard. | www.sungard.co.uk

Wall panels installed

Air-conditioning units positioned and connected.

Long-term Construction Process (continued)

Page 7: SunGard Mobile Infrastructure and long-term solutions

7© 2010 SunGard. | www.sungard.co.uk

Long-term Construction Process (continued)

Raised floor installed

Small power installed(workplace only)

Cat6 structured cabling(workplace only).

Page 8: SunGard Mobile Infrastructure and long-term solutions

8© 2010 SunGard. | www.sungard.co.uk

Long-term Construction Process (continued)

Furniture installed(workplace only)

Ramps and access stairs installed

Total erection time – 5 to 20 days.

Page 9: SunGard Mobile Infrastructure and long-term solutions

9© 2010 SunGard. | www.sungard.co.uk

Mobile Infrastructure Package

Mitigates the effects of a disaster

Survey at an additional charge

Air-conditioning units (2.9kW to 63kW)

Power distribution units

Generators (6KVA–1000KVA)

Portable accommodation units

Cat6 structured cabling

Delivered within 12 hours

Cost-effective (£3,000 pa)

No invocation charge (cost +15% administration charge).

Page 10: SunGard Mobile Infrastructure and long-term solutions

10© 2010 SunGard. | www.sungard.co.uk

Mobile UPS

400KVA containerised UPS

2 x 60KVA UPS (can be run in parallel to create 120KVA)

Delivered within 24 hours

No invocation charge (cost +15% administration charge)

Cost-effective(1,500 to £4,000 pa)

No invocation charge (cost +15% administration charge).

Page 11: SunGard Mobile Infrastructure and long-term solutions

11© 2010 SunGard. | www.sungard.co.uk

Mobile Workplace

2 or 3 volumetric units deliveredwithin 24–36 hours

15 or 20 position desks and chairs

Integral air conditioning

Pre-installed Cat5e structuredcabling and small power

Avaya Prologix PBX with 15 or 20analogue extensions

Wireless intruder alarm system

Containerised 50kVA powergenerator set (for 4 weeks)

Cost-effective (£3,000 or £4,000 pa)

No invocation charge (cost +15% administration charge).

Page 12: SunGard Mobile Infrastructure and long-term solutions

12© 2010 SunGard. | www.sungard.co.uk

Mobile Midrange Recovery Unit

Included within the Mobile Infrastructure Package but available separately

200 sq ft stand alone unit, complete with air-conditioning

Delivered within 24 hours

Cost-effective (£900 pa)

No invocation charge (cost +15% administration charge).

Page 13: SunGard Mobile Infrastructure and long-term solutions

13© 2010 SunGard. | www.sungard.co.uk

Mobile Bank Branch provided for major Scottish bank

Incident control solution for Health & Safety Executive.

Bespoke Solutions

Page 14: SunGard Mobile Infrastructure and long-term solutions

14© 2010 SunGard. | www.sungard.co.uk

Thank You


Top Related