SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
01 30 00 SD-01 Preconstruction Submittals1.4 GView location map1.5Progress and completion pictures
01 32 01.00 10 SD-01 Preconstruction Submittals3.4.1 GPreliminary Project Schedule3.4.2 GInitial Project Schedule3.4.2 GInitial Project Schedule3.4.3 GPeriodic Schedule Updates
01 33 00 SD-01 Preconstruction Submittals1.8 GSubmittal register
01 35 26 SD-01 Preconstruction Submittals1.6SAFETY PLAN /ACCIDENT
PREVENTION PLAN (APP)1.7Activity Hazard Analysis (AHA)1.6.1Crane Critical Lift Plan1.5.1.2Crane Operators
SD-06 Test Reports1.11Notifications and Reports1.11.2Accident Reports1.11.3Crane Reports1.11.4Certificate of Compliance
SD-07 Certificates1.8Confined Space Entry Permit1.8Hot work permit1.13License Certificates
01 35 29.13 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
01 35 29.13 1.20.1 GWork Zones1.21.1 GDecontamination Facilities
SD-03 Product Data1.13Exposure Monitoring/Air
Sampling Program1.20.2Site Control Log1.12.4Employee Certificates
01 45 00.00 10 SD-01 Preconstruction Submittals3.2 GQuality Control Plan
01 50 00 SD-01 Preconstruction Submittals1.4 GConstruction site plan3.4.1 GTraffic control plan3.3.4Temporary Power Services
DiagramSD-06 Test Reports
1.5 GBackflow Preventer TestsSD-07 Certificates
1.5.2 GBackflow Prevention TrainingCertificate
1.5.1Backflow Preventers01 57 20.00 10 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan01 58 00 SD-02 Shop Drawings
1.2.1 GConstruction Project Sign01 78 00 SD-03 Product Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
01 78 00 1.3.2As-Built Record of Equipmentand Materials
1.3.4Equipment-in-Place List1.6.1Warranty Management Plan1.6.5Warranty Tags1.4Spare Parts Data
SD-08 Manufacturer’s Instructions1.5Preventative Maintenance1.5Condition Monitoring (Predictive
Testing)1.5Inspection1.6.1Instructions
SD-10 Operation and MaintenanceData
1.7Operation and MaintenanceManuals
SD-11 Closeout Submittals1.3.1Record Drawings1.9 GInterim Form DD13541.9 GChecklist for Form DD1354
02 41 00 SD-01 Preconstruction Submittals1.11 GExisting Conditions
SD-07 Certificates1.2.1 GDemolition Plan1.2.1 GDeconstruction Plan1.7 GNotification
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
02 41 00 SD-11 Closeout Submittals3.3.4Receipts
02 61 13 SD-02 Shop Drawings3.1 GSurveys
SD-03 Product Data1.2 GWork Plan3.11 GClosure Report
SD-06 Test Reports2.2 GBackfill3.1 GSurveys3.5 GConfirmation Sampling and
Analysis3.7.1 GSampling of Stored Material3.7.2 GSampling Liquid3.9.2 GCompaction
02 65 00 SD-01 Preconstruction Submittals1.4.4 GWork Plan1.4.4.1 GSite safety and health plan1.4.4.2 GExcavation and material handling
plan1.4.4.3 GField sampling and laboratory
testing plan1.4.4.4 GTank and piping removal and
disposal plan1.4.4.5 GSpill and discharge control plan1.4.1 GQualifications
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
02 65 00 1.4.2 GLaboratory ServicesSD-06 Test Reports
2.1 GBackfill Material3.2 GTank Contents Verification3.5.2 GContaminated Water Disposal3.10 GSoil Examination, Testing, and
Analysis3.11 GBackfilling3.15 GTank Closure Report
SD-11 Closeout Submittals3.12.4 GSalvage Rights3.15 GTank Closure Report
02 81 00 SD-03 Product Data3.1 GOnsite Hazardous Waste
Management3.2Notices of Non-Compliance and
Notices of Violation2.1.1Packaging Notifications
SD-06 Test Reports3.6 GRecordkeeping3.7Spill Response3.6 GException Report
SD-07 Certificates1.4.3Certification3.2.4Security Plan
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
02 81 00 1.4.1 GTransportation and DisposalCoordinator
1.4.2 GTraining3.2.2EPA Offsite Policy3.2.5Certificates of Disposal3.2.3 GShipping Documents and
Packagings Certification3.5 GWaste Minimization
02 82 14.00 10 SD-02 Shop Drawings1.3 GDetailed Drawings
SD-03 Product Data3.11.3.1Asbestos Waste Shipment
Records2.1Encapsulants1.8.1 GRespiratory Protection Program3.11Cleanup and Disposal1.5.1 GQualifications1.10Training Program1.7.1Licenses, Permits and
Notifications3.11.3.2Asbestos Management Plan
SD-06 Test Reports3.9Exposure Assessment and Air
Monitoring1.6.3Local Exhaust System
SD-07 Certificates
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
02 82 14.00 10 1.6.3Local Exhaust System2.1 GEncapsulants1.8Medical Surveillance
Requirements02 83 19.00 10 SD-03 Product Data
2.1Materials and Equipment2.1.1Expendable Supplies1.5.1 GQualifications1.5.4 GOccupant Protection Plan
SD-06 Test Reports3.1.3Pressure Differential Log1.5.5 GLicenses, Permits and
Notifications1.3.3Sampling and Analysis3.5 GAbatement Report
03 11 13.00 10 SD-02 Shop Drawings3.1.1Formwork
SD-03 Product Data1.2Design2.1Form Materials
03 15 00.00 10 SD-03 Product Data2.2Preformed Expansion Joint Filler2.3Sealant2.4Waterstops
03 20 00.00 10 SD-02 Shop Drawings3.1Reinforcement
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
03 20 00.00 10 SD-03 Product Data2.3.2Epoxy-Coated Bars
SD-07 Certificates1.3.1Welding Qualifications2.3Reinforcing Steel
03 30 00 SD-02 Shop Drawings1.6.2.1Fabrication Drawings1.6.2.3 GReinforcing steel2.5.5Synthetic reinforcing fibers
SD-03 Product Data2.4.1.3Portland Cement2.3.2Ready-Mix Concrete2.6Bonding Materials1.6.3.2Pumping Concrete2.4.11Epoxy bonding compound3.14.2Waterstops
SD-05 Design Data1.6.4.1 GConcrete mix design1.6.1.1Calculations
SD-06 Test Reports1.6.4.1 GConcrete mix design1.6.4.3Ground granulated blast-furnace
slag3.10.2.1Tolerance report3.12.2.3Compressive strength tests
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
03 30 00 3.12.2.5Unit weight of structurallightweight concrete
2.8.5Air Content3.12.2.4Air Content3.12.2.1Slump Tests3.12.2.2Temperature Tests3.12.2.6Ion Concentration
SD-07 Certificates1.6.3.1Curing concrete elements1.6.3.4VOC Content for form release
agents, curing compounds, andconcrete penetrating sealers
1.6.3.5Material Safety Data Sheets1.9Welder Qualifications1.9Welding Procedures2.8Classification and Quality of
Concrete3.6.11Steel Bar
SD-08 Manufacturer’s Instructions1.6.4.2Fly ash
03 30 53 SD-02 Shop Drawings1.5Installation Drawings
SD-03 Product Data2.2Ready-Mix Concrete
03 40 00.00 10 SD-01 Preconstruction Submittals1.4.1.2Quality Control Procedures
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
03 40 00.00 10 SD-02 Shop Drawings1.2.1Standard Precast Units1.2.2Custom-Made Precast Units
SD-03 Product Data1.2.1Standard Precast Units1.2.3Proprietary Precast Units3.1.3Embedded Items2.1.11Accessories
SD-05 Design Data1.2.2Design Calculations1.2.5.1Concrete Mix Proportions
SD-06 Test Reports1.4.1.4Test Reports
03 41 16.08 SD-02 Shop Drawings2.1 GFabrication Drawings2.1 GInstallation Drawings
SD-03 Product Data2.3.2Precast Curb Units2.3.7Absorption Cover2.3.7Moisture-Retaining Cover2.3.3Cement Grout Joint Sealing
MaterialsSD-05 Design Data
2.3.1Design analysis2.3.1Calculations
SD-06 Test Reports
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
03 41 16.08 2.3.1Nail Driving and Nail PullingTests
2.3.1 GStrength TestsSD-07 Certificates
2.3.1 GPrecast Concrete Roof Slabs2.3.2 GPrecast Curb Units2.3.3Cement Grout Joint Sealing
MaterialsSD-08 Manufacturer’s Instructions
2.3.1Installation Instructions04 20 00 SD-02 Shop Drawings
1.4.4Detail DrawingsSD-03 Product Data
2.4Concrete Masonry Units (CMU)2.3 GConcrete Brick2.2 GClay or Shale Brick2.8.4 GCement1.6.2 GCold Weather Installation2.5 GPrecast Concrete Items2.4.3 GFire-rated CMU
SD-05 Design Data2.8.5Pre-mixed Mortar1.2.1.1Unit Strength Method
SD-06 Test Reports3.24.3Efflorescence Test3.24.1Field Testing of Mortar
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
04 20 00 3.24.2Field Testing of Grout3.24.4 GPrism tests
SD-07 Certificates1.4.3 GMasonry Inspector Qualifications
05 05 23 SD-03 Product Data1.5 GWelding Procedures
SD-06 Test Reports3.3.1Nondestructive Examination
SD-07 Certificates1.5.5Welder, Welding Operator, and
Tacker Qualification1.5.6Inspector Qualification1.5.2Previous Qualifications
05 12 00 SD-02 Shop Drawings1.5.1 GFabrication drawings
SD-03 Product Data2.1Steel2.2Bolts, nuts, and washers2.2Bolts, nuts, and washers
SD-07 Certificates1.5.2.3Welding procedures and
qualifications05 21 23 SD-01 Preconstruction Submittals
1.5.2Material Safety Data SheetSD-02 Shop Drawings
1.5.1 GSteel joist girder framing
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
05 21 23 SD-07 Certificates1.5.2Welder qualification1.5.2Certification of Compliance
05 30 00 SD-02 Shop Drawings1.3.5Fabrication Drawings
SD-03 Product Data2.3.1Deck Units2.1.3.1Galvanizing Repair Paint2.2.12Mechanical Fasteners2.3.2Metal Floor Deck Units1.3.3Welding Equipment1.3.3Welding Rods and Accessories
SD-05 Design Data2.3.1Deck Units
SD-07 Certificates1.3.3Welder Qualifications1.3.2Powder-Actuated Tool Operator
05 50 13 SD-02 Shop Drawings1.4.2 GFabrication drawings
SD-03 Product Data2.6Cover plates and frames2.9Floor gratings and roof walkways2.17Wheel guards2.18Window and door guards3.11Roof hatch
05 50 14 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
05 50 14 1.3.2 GDetail DrawingsSD-03 Product Data
2.2.2.1Welding of Structural Steel2.3.4 GStructural Steel Welding Repairs2.1.1Materials List
SD-06 Test Reports2.3Tests, Inspections, and
VerificationsSD-07 Certificates
1.3.1Qualification of Welders andWelding Operators
2.2.2.3Application Qualification for SteelStuds
1.3.1 GWelding of Aluminum05 51 00 SD-02 Shop Drawings
2.16 GMetal Stair SystemSD-03 Product Data
2.3 GStructural Steel Tubing2.4Hot-Rolled Carbon Steel Bars2.7Cold-Rolled Carbon Steel Sheets2.8Galvanized Carbon Steel Sheets2.9Cold-Drawn Steel Tubing2.13 GConcrete Inserts2.14 GMasonry Anchorage Devices2.18.8 GSteel Stairs2.18.9 GSteel Stairs, Circular
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
05 51 33 SD-02 Shop Drawings1.4Ladder fabrication and
installation drawingsSD-03 Product Data
2.3Ladders05 52 00 SD-02 Shop Drawings
2.1Fabrication and InstallationDrawings
SD-03 Product Data2.13Steel Railings and Handrails2.14Aluminum Railings and Handrails
SD-07 Certificates1.3.1 GWelding Procedures1.3.2 GWelder Qualification
SD-08 Manufacturer’s Instructions3.1 GInstallation Instructions
06 10 00 SD-02 Shop Drawings1.9.1 GFabricated structural members1.9.1 GModifications of structural
members1.9.2 GModifications of structural
membersSD-03 Product Data
2.4Underlayment2.1.2Plastic Lumber2.5.2Fiberboard Wall Sheathing
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
06 10 00 2.5.5Cellulose Honeycomb Panels1.8Fire-retardant treatment2.1.1Engineered wood products1.4.4Structural-use and OSB panels2.3Oriented Strand Board2.5.11Adhesives
SD-05 Design Data1.9.1 GModifications of structural
members1.9.2 GModifications of structural
membersSD-06 Test Reports
1.4.5Preservative-treatedSD-07 Certificates
1.9.3Certificates of grade1.7Preservative treatment
06 20 00 SD-02 Shop Drawings1.3Detail Drawings
SD-03 Product Data2.1.12 GSiding2.1.12 GSiding2.1.12.9Epoxy-Aggregate Panels
SD-07 Certificates1.4Certificates of grade1.4Certificates of compliance
07 11 13 SD-07 Certificates
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
07 11 13 1.3Materials07 12 00 SD-03 Product Data
2.6Protection board2.8Prefabricated copper fabric2.3Membrane fabric
SD-06 Test Reports1.4.2Liquid asphalt
07 13 53 SD-03 Product Data2.1 GElastomeric waterproofing sheet
material2.5Protection board2.1Primers, adhesives, and mastics
SD-06 Test Reports3.6Field Quality Control3.1Verification Of Conditions
SD-08 Manufacturer’s Instructions2.1Primers, Adhesives and Mastics
(MSDS)07 14 00 SD-03 Product Data
2.1Fluid-applied membrane2.8Elastomeric sheet2.10Flexible foam-backed elastomeric
sheet2.7Bond breaker
SD-11 Closeout Submittals1.6Warranty
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
07 14 00 3.6Information Card3.5Instructions To Government
Personnel07 21 13 SD-03 Product Data
2.1Block or board insulation2.2Vapor retarder2.3Pressure sensitive tape
07 21 16 SD-03 Product Data2.1Blanket insulation2.2Sill sealer insulation2.4Vapor retarder2.5Pressure sensitive tape
07 22 00 SD-02 Shop Drawings1.3 GTapered roof insulation system
SD-03 Product Data2.1Insulation
SD-07 Certificates1.4Manufacturer's Certificate
07 24 00 SD-02 Shop Drawings3.3 GShop drawings
SD-03 Product Data2.2Sheathing board2.6Thermal insulation2.3Adhesive2.12Accessories2.7Base coat
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
07 24 00 2.9Reinforcing fabric2.10Finish coat2.13Joint Sealant1.4.5Insulation Board1.7Warranty
SD-05 Design Data1.2.4Moisture analysis
SD-06 Test Reports1.2.3.1Abrasion resistance1.2.3.2Accelerated weathering1.2.2.3Impact resistance1.2.3.3Mildew resistance1.2.3.4Salt spray resistance1.2.3.6Absorption-freeze-thaw1.2.1.3Wall fire test1.2.1.2Wind load1.2.1.1Water penetration1.2.3.5Water resistance1.2.2.1Surface Burning Characteristics
SD-07 Certificates1.4.1Qualifications of EIFS
Manufacturer1.4.2Qualification of EIFS Installer1.4.3Qualification of Sealant
ApplicatorSD-08 Manufacturer’s Instructions
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
07 24 00 3.3Installation of EIFSSD-10 Operation and MaintenanceData
3.7Maintenance of EIFS07 31 13 SD-03 Product Data
2.1.1Shingles07 32 13 SD-02 Shop Drawings
1.7.2Clay Tile Roofing SystemSD-03 Product Data
2.1.1Clay Roof Tile2.1.2Concrete Roof Tile2.2Underlayment membrane2.3.1Glass mesh mortar units2.3.2Fiberglass-faced gypsum roof
board1.4.1Warranty
SD-07 Certificates1.7.1Qualifications of roofing
personnel07 41 13 SD-02 Shop Drawings
1.4.5 GDrawingsSD-03 Product Data
2.1Roof panels2.4Accessories2.7 GUnderlayments1.4.5 GCoil Stock
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
07 41 13 3.11WarrantySD-06 Test Reports
1.2.1.1 GLeakage Test Report1.2.1.2 GWind Uplift Test Report
SD-07 Certificates1.4.1.1 GRoofing Panels1.4.5Coil stock compatibility1.4.1 GQualification of Manufacturer1.4.2Qualification of Applicator
SD-08 Manufacturer’s Instructions1.4.5INSTALLATION MANUAL
SD-11 Closeout Submittals1.8Warranties3.10Information Card
07 42 13 SD-02 Shop Drawings1.5.1.1Installation Drawings
SD-03 Product Data2.2.1Wall Panels2.5.4.1Sealants and Caulking
SD-05 Design Data1.5.1.2 GWind load design analysis
SD-06 Test Reports1.3.2 GWind Load Tests
SD-07 Certificates1.5.3Qualification of Manufacturer
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
07 42 13 1.5.4Qualification of InstallationContractor
1.5.4.1Qualification of Welders1.5.3.1Coil Stock1.5.3.1Fasteners1.5.3.1Galvanizing Repair Paint1.5.3.1Enamel Repair Paint
SD-08 Manufacturer’s Instructions1.5.1 GInstallation of Wall panels
SD-11 Closeout Submittals1.8 GWarranty1.5.6Maintenance Instructions
07 51 13 SD-03 Product Data2.4Asphalt2.2 GFiberglass Felt Materials2.5.2 GGranule Surface Modified
Bitumen Cap Sheet2.3Base Flashing Membrane2.6Primer2.7Asphalt Roof Cement2.11 GPre-Manufactured Accessories2.11 GPre-Manufactured Accessories2.12.1Roof Walkways1.8Warranty
SD-06 Test Reports3.5.3Samples of Built-Up Roofing
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
07 51 13 SD-07 Certificates1.4.1Qualifications of Applicator
SD-11 Closeout Submittals3.6Information Card
07 53 23 SD-02 Shop Drawings1.3.1Roof Plan Drawing1.3.1Wind Load Calculations
SD-03 Product Data2.1.9.2Ballast Pavers2.1.1EPDM Sheet2.1.7Flashings2.1.7Flashing Accessories2.1.8Fasteners and Plates2.1.9Ballast2.1.13Roof Insulation2.1.10Protection Mat2.1.11Pre-Manufactured Accessories1.8Warranty
SD-05 Design Data1.4.4 GWind Uplift Calculations
SD-06 Test Reports3.8.2Roof Drain Test
SD-07 Certificates1.4.1Qualification of Manufacturer1.4.2Qualification of Applicator1.4.4 GWind Uplift Resistance
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
07 53 23 1.4.3 GFire ResistanceSD-08 Manufacturer’s Instructions
3.2Application3.2.3Application Method3.3.2Instructions For Membrane
FlashingSD-11 Closeout Submittals
3.10Information Card3.9Instructions To Government
Personnel07 60 00 SD-02 Shop Drawings
1.5DrawingsSD-03 Product Data
3.1.2Flashing3.1.11Flashing
SD-11 Closeout Submittals3.5Quality Control Plan
07 81 00 SD-03 Product Data3.3 GFireproofing Material
SD-04 Samples2.1Spray-Applied Fireproofing
SD-06 Test Reports1.2.2Fire Resistance Rating3.6 GField Tests
SD-07 Certificates1.4.1Installer Qualifications
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
07 81 00 3.1 GSurface Preparation Report07 84 00 SD-02 Shop Drawings
1.2.3 GDetail DrawingsSD-03 Product Data
2.1 GFirestopping MaterialsSD-07 Certificates
1.2.3Firestopping Material Certificate1.4.1Installer Qualifications
07 92 00 SD-03 Product Data2.1Sealants
08 11 13 SD-02 Shop Drawings1.4 GDoor Drawings1.4 GDoor Schedule
SD-03 Product Data2.1Doors2.7Frames2.5Accessories
08 11 16 SD-02 Shop Drawings1.5.1 GDoor and Frame Drawings
SD-03 Product Data2.1Doors and Frames
SD-10 Operation and MaintenanceData
3.3Maintenance of Doors andFrames
08 14 00 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
08 14 00 1.4 GDoor DrawingsSD-03 Product Data
2.1Doors1.5Warranty2.1.7 GFire Resistance Rating
08 33 13 SD-02 Shop Drawings1.4Detail Drawings
SD-03 Product Data1.2Rolling Counter Doors2.2Rolling Counter Door
(Non-Rated)2.3Fire-Rated Rolling Counter Door
SD-10 Operation and MaintenanceData
3.5Rolling Counter Doors(Non-Rated)
3.5Fire-Rated Rolling Counter Doors3.5Cleaning
08 33 23 SD-02 Shop Drawings1.5Overhead Coiling Door Detail
DrawingsSD-03 Product Data
2.1Overhead Coiling Doors1.6Warranty2.2Hardware2.3Counterbalancing Mechanism
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
08 33 23 2.4Manual Door Operators2.5Electric Door Operators2.6Fire-Rated Door Assembly
SD-10 Operation and MaintenanceData
1.6Operation and MaintenanceManuals
08 36 13 SD-02 Shop Drawings1.3 GDrawings
SD-03 Product Data2.2Doors2.6Electric operators
SD-08 Manufacturer’s Instructions3.1Installation Instructions
SD-10 Operation and MaintenanceData
3.4Operation and Maintenance08 51 13 SD-02 Shop Drawings
1.4.1 GInstallation Drawings1.4.1Fabrication Drawings
SD-03 Product Data2.1Windows2.2.8.1Hardware2.4Thermal-Barrier Windows2.5Mullions2.2.10Screens
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
08 51 13 2.2.2Weatherstripping2.2.8Accessories1.9.5Thermal Performance1.11Warranty
SD-05 Design Data2.1 GStructural Calculations For
Deflection1.4.2 GDesign Analysis
SD-06 Test Reports1.4.3Minimum condensation
resistance factor1.4.3Resistance to forced entry1.4.3Standard Airblast Test
SD-10 Operation and MaintenanceData
3.5Operation and MaintenanceManuals
08 52 00 SD-02 Shop Drawings1.3 GInstallation Drawings
SD-03 Product Data2.1.1Engineered Wood Products2.2Wood windows
SD-10 Operation and MaintenanceData
3.5Operation and MaintenanceManuals
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
08 71 00 SD-02 Shop Drawings1.3Hardware schedule2.3.8Keying system
SD-03 Product Data2.3 GHardware items
08 81 00 SD-02 Shop Drawings1.6Installation
SD-03 Product Data2.2Insulating Glass2.3Plastic Glazing1.7Warranty
08 87 16 SD-03 Product Data2.2Fragment Retention Film1.6Warranty
SD-06 Test Reports1.2.2Certified Test Reports2.2.1Impact Performance
SD-07 Certificates1.2.2Statement
SD-08 Manufacturer’s Instructions1.2.2Application and Cleaning
Instructions08 91 00 SD-02 Shop Drawings
1.4Wall louversSD-03 Product Data
2.2Metal Wall Louvers
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
09 22 00 SD-02 Shop Drawings1.4Metal support system
SD-03 Product Data2.1Metal Support Systems
09 22 36 SD-03 Product Data2.1Lath
09 24 23 SD-02 Shop Drawings3.3Lath
SD-03 Product Data3.6Proportions and Mixing
09 29 00 SD-03 Product Data2.1.1Gypsum Board2.1.8Cementitious backer units2.1.4Glass Mat Water-Resistant
Gypsum Tile Backing Board2.1.3Water-Resistant Gypsum
Backing Board2.1.5Glass Mat Covered or Reinforced
Gypsum Sheathing2.1.5.1Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant2.1.6Impact Resistant Gypsum Board2.1.14Accessories
SD-07 Certificates2.1 GAsbestos Free Materials
09 30 00 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
09 30 00 1.3 GDetail DrawingsSD-03 Product Data
2.1 GTile2.2Setting-Bed2.4Mortar, Grout, and Adhesive
SD-06 Test Reports3.7 GTesting
09 51 00 SD-02 Shop Drawings1.2Approved Detail Drawings
SD-03 Product Data2.1Acoustical Units
SD-06 Test Reports1.2.1Fire Resistive Ceilings1.2.2Ceiling Attenuation Class and
Test09 64 29 SD-02 Shop Drawings
3.2.2 GSquash and Handball CourtWalls
SD-03 Product Data2.1.2Bamboo3.2Installation
09 65 00 SD-02 Shop Drawings2.17Scaled Drawings
SD-03 Product Data2.17Resilient Flooring and
Accessories
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
09 65 00 2.13Adhesives2.6Sheet Linoleum2.7Linoleum Tile2.8Cork
SD-06 Test Reports3.3Moisture, Alkalinity and Bond
TestsSD-08 Manufacturer’s Instructions
3.1InstallationSD-10 Operation and MaintenanceData
2.17Resilient Flooring andAccessories
09 65 66 SD-02 Shop Drawings3.3.6.1 GApproved Detail Drawings
SD-03 Product Data3.3Installation
09 68 00 SD-02 Shop Drawings3.4 GInstallation
SD-03 Product Data2.1 GCarpet2.1 GCarpet Cushion2.1 GCarpet Moldings
SD-06 Test Reports3.2Moisture and Alkalinity Tests
SD-07 Certificates
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
09 68 00 1.3Carpet Cushion and MoldingSD-08 Manufacturer’s Instructions
3.1Printed Installation InstructionsSD-10 Operation and MaintenanceData
3.5Cleaning and Protection09 69 13 SD-02 Shop Drawings
1.4 GDetailed Installation DrawingsSD-03 Product Data
2.1Floor PanelsSD-05 Design Data
1.2Compliance with ICC-ES AC3001.2.7Seismic Calculations
SD-06 Test Reports3.2.2Electrical Resistance3.2.1Acceptance Tests
SD-07 Certificates1.2Access Flooring System2.4Access Flooring System3.5Operation and Maintenance
Manuals09 69 19 SD-02 Shop Drawings
1.4 GDetailed Installation DrawingsSD-03 Product Data
2.4Access Flooring SystemSD-05 Design Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
09 69 19 1.2Compliance with ICC-ES AC3001.2.6Seismic Calculations
SD-06 Test Reports3.2.2Electrical Resistance3.2.1Acceptance Tests
SD-07 Certificates1.2Certificate Of Compliance3.5Operation and Maintenance
Manuals09 72 00 SD-03 Product Data
2.1 GWallcoverings and Accessories2.10Primer and Adhesive
SD-07 Certificates2.1.2Manufacturer's Statement
SD-10 Operation and MaintenanceData
2.1.4Manufacturer's MaintenanceInstructions
09 90 00 SD-03 Product Data3.6.4Coating2.1Manufacturer's Technical Data
SheetsSD-07 Certificates
1.3Applicator's qualifications1.4.1.2Qualification Testing
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
09 90 00 3.6.1Application instructions3.6.2Mixing1.7.2Manufacturer's Material Safety
Data SheetsSD-10 Operation and MaintenanceData
3.13Cleaning and MaintenanceInstructions
10 14 01 SD-02 Shop Drawings3.1Approved Detail Drawings
SD-03 Product Data1.2Exterior Signage1.2.1Wind Load Requirements
10 14 02 SD-02 Shop Drawings1.2Detail Drawings
SD-03 Product Data3.1 GInstallation
SD-10 Operation and MaintenanceData
3.1 GOperating Instructions10 21 13 SD-02 Shop Drawings
3.3Installation DrawingsSD-03 Product Data
2.1.5Hardware and Fittings1.6Warranty
10 28 13 SD-03 Product Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
10 28 13 2.2 GAccessory ItemsSD-10 Operation and MaintenanceData
2.2.27 GElectric Hand Dryer11 68 13 SD-02 Shop Drawings
2.2.1Configuration1.5.6Shop Drawings3.2.10Fall Height3.1.1Finished Grade and Underground
UtilitiesSD-03 Product Data
2.2Equipment1.3.4Equipment Identification1.6Delivery, Storage and Handling1.5.1Manufacturer Qualification2.1.2Wood1.8Spare Parts2.1Materials
SD-04 Samples2.1.7Color
SD-06 Test Reports2.1.4Recycled Plastic3.2.2Wood Finishes
SD-07 Certificates2.1Materials1.5.1Manufacturer Qualification
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
11 68 13 1.5.2Installer Qualification1.5.3Manufacturer's Representative2.1.2.1Wood Treatment2.2.2Substitution3.2.1Play Event Modification3.4Child Safety and Accessibility
EvaluationSD-10 Operation and MaintenanceData
1.8Maintenance Instructions12 21 00 SD-03 Product Data
2.1 GWindow Blinds12 32 00 SD-02 Shop Drawings
3.2Installation DrawingsSD-03 Product Data
2.10Cabinets2.2Accessories and Hardware2.10Countertops2.1Manufacturer's Standard Color
ChartsSD-08 Manufacturer’s Instructions
2.1Manufacturer's Instructions12 36 00 SD-02 Shop Drawings
3.1Installation DrawingsSD-03 Product Data
2.3 GCountertop
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
12 36 00 2.5.3 GJoint SealantsSD-08 Manufacturer’s Instructions
2.1 GManufacturer's Instructions13 48 00.00 10 SD-02 Shop Drawings
3.1Coupling and Bracing3.3Flexible Couplings or Joints1.3Equipment Requirements1.2.4 GContractor Designed Bracing
SD-03 Product Data3.1 GCoupling and Bracing1.3 GEquipment Requirements1.2.4 GContractor Designed Bracing
SD-07 Certificates2.2Flexible Ball Joints
13 48 00 SD-02 Shop Drawings3.1 GBracing3.4 GResilient Vibration Isolation
Devices1.3 GEquipment Requirements
SD-03 Product Data3.1 GBracing1.3 GEquipment Requirements
SD-06 Test Reports3.3Anchor Bolts
21 13 13.00 10 SD-02 Shop Drawings1.4.3 GShop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
21 13 13.00 10 3.10As-Built Drawings3.10As-Built Drawings
SD-03 Product Data1.4.1 GFire Protection Related
Submittals2.3 GMaterials and Equipment1.6Spare Parts3.9 GPreliminary Tests3.10 GFinal Acceptance Test3.11 GOnsite Training1.4.1 GFire Protection Specialist1.4.2 GSprinkler System Installer
SD-05 Design Data1.4.3 GSway Bracing1.2.1.3 GHydraulic Calculations
SD-06 Test Reports3.9 GPreliminary Test Report3.10 GFinal Acceptance Test Report
SD-07 Certificates3.3 GInspection by Fire Protection
SpecialistSD-10 Operation and MaintenanceData
3.11Operating and MaintenanceManuals
21 13 17.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
21 13 17.00 10 1.4.3 GShop Drawings3.10As-Built Drawings
SD-03 Product Data1.4.1 GList of Submittals2.1 GMaterials and Equipment1.6Spare Parts1.4.1 GFire Protection Specialist1.4.2 GInstaller Qualifications3.11 GOnsite Training
SD-05 Design Data3.5.1 GSway Bracing1.2.1.2 GHydraulic Calculations
SD-06 Test Reports3.9 GPreliminary Tests3.10 GFinal Acceptance Test
SD-07 Certificates3.4 GInspection by Fire Protection
SpecialistSD-10 Operation and MaintenanceData
3.11Operating and MaintenanceInstructions
21 13 18.00 10 SD-02 Shop Drawings1.4.3 GShop Drawings3.10As-Built Drawings
SD-03 Product Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
21 13 18.00 10 1.4.1 GFire Protection Specialist1.4.2 GInstaller Qualifications1.4.1 GList of Submittals2.1 GMaterials and Equipment1.6Spare Parts3.11 GOnsite Training
SD-05 Design Data3.5.1 GSway Bracing1.2.1.2 GHydraulic Calculations2.14.4.1 GStorage Batteries
SD-06 Test Reports3.9 GPreliminary Tests3.10 GFinal Acceptance Tests
SD-07 Certificates3.4 GInspection by Fire Protection
SpecialistSD-10 Operation and MaintenanceData
3.11Operating and MaintenanceInstructions
21 13 24.00 10 SD-02 Shop Drawings1.4.3 GDetail Drawings1.4.1As-built Drawings
SD-03 Product Data2.1 GMaterials and Equipment1.5Spare Parts
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
21 13 24.00 10 1.2 GAFFF System1.4.2 GInstaller's Qualifications3.7.4 GPost-discharge Test
RequirementsSD-06 Test Reports
3.7.4 GTest ReportsSD-07 Certificates
2.1 GMaterials and EquipmentSD-10 Operation and MaintenanceData
3.9 GOperation and MaintenanceManuals
21 21 03.00 10 SD-02 Shop Drawings1.4.3 GInstallation Drawings
SD-03 Product Data1.4Similar Services2.1 GStandard Products3.2Preliminary Tests3.3Final Acceptance Tests3.4Field Training
SD-06 Test Reports3.2Preliminary Tests3.3Final Acceptance Tests
SD-07 Certificates1.4.2 GInstallation Technician1.4.3 GInstallation Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
21 21 03.00 10 SD-10 Operation and MaintenanceData
3.4Operation and MaintenanceInstructions
21 30 00 SD-02 Shop Drawings1.2 GInstallation Drawings3.9.5 GAs-Built Drawings1.2 GPiping Layout and Sensing Piping
Arrangement1.2 GPump Room
SD-03 Product Data3.2 GFire Pump Installation Related
Submittals2.1 GCatalog Data1.7 GSpare Parts3.9.2 GPreliminary Tests3.9 GField Tests1.4.1 GFire Protection Specialist1.4.5 GManufacturer's Representative3.11 GField Training3.9.3 GArmy Final Acceptance Test
SD-06 Test Reports3.9.2 GPreliminary Tests3.9.3 GArmy Final Acceptance Test
SD-07 Certificates1.4.1 GFire Protection Specialist
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
21 30 00 3.9.3.9 GCertification of Installation1.4.2 GQualifications of Welders1.4.3 GQualifications of Installer1.4.4 GPreliminary Test Certification
SD-10 Operation and MaintenanceData
3.11 GOperating and MaintenanceInstructions
2.17 GFlow Meter22 00 00 SD-02 Shop Drawings
3.9.1 GPlumbing SystemSD-03 Product Data
2.4Fixtures2.4.3Flush valve water closets2.4.4Flush valve urinals2.4.7Flush tank water closets2.4.9Wall hung lavatories2.4.10Countertop lavatories2.4.11Kitchen sinks2.4.12Service sinks2.4.13 GDrinking-water coolers2.4.18Bathtubs, Porcelain2.4.17Bathtubs, Cast Iron2.10 GWater heaters2.12 GPumps3.9.1.1 GBackflow prevention assemblies
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
22 00 00 2.6.2 GShower Faucets2.6.9 GSwimming Pool and Spa Suction
Fittings2.16 GPool Water Pump safety vacuum
release system1.5.1Welding3.4 GVibration-Absorbing Features3.9.1Plumbing System
SD-06 Test Reports3.9Tests, Flushing and Disinfection3.9.1.1Test of Backflow Prevention
AssembliesSD-07 Certificates
1.3Materials and Equipment2.1.1Bolts
SD-10 Operation and MaintenanceData
3.9.1 GPlumbing System22 31 00 SD-02 Shop Drawings
3.2InstallationSD-03 Product Data
2.2Softening Equipment1.4Spare Parts3.3.2Field Instructions
SD-06 Test Reports2.2Softening Equipment
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 46 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
22 31 00 3.4.2PipingSD-10 Operation and MaintenanceData
3.3.2Operating and MaintenanceInstructions
23 00 00 SD-02 Shop Drawings1.4.5 GDetail Drawings
SD-03 Product Data2.9.1.1Metallic Flexible Duct2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts2.9.1.2Duct Connectors2.9.2 GDuct Access Doors2.9.3Fire Dampers2.9.4 GManual Balancing Dampers2.9.8Sound Attenuation Equipment2.9.8Acoustical Duct Liner2.9.9.1Diffusers2.9.9.2Perforated Plate Diffusers2.9.9.3Linear Diffusers2.9.9.4Security Ceiling Diffusers2.9.9.5Registers and Grilles2.9.10Louvers2.9.11Air Vents, Penthouses, and
Goosenecks2.10.1.1 GCentrifugal Fans
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 47 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 00 00 2.10.1.2 GIn-Line Centrifugal Fans2.10.1.3 GAxial Flow Fans2.10.1.4 GPanel Type Power Wall
Ventilators2.10.1.5 GCentrifugal Type Power Wall
Ventilators2.10.1.6 GCentrifugal Type Power Roof
Ventilators2.10.1.7 GPropeller Type Power Roof
Ventilators2.10.1.8 GAir-Curtain Fans2.10.1.9 GCeiling Exhaust Fans2.11 GAir Handling Units2.12.1 GRoom Fan-Coil Units2.12.2 GCoil Induction Units2.12.3.1 GConstant Volume, Single Duct
Terminal Units2.12.3.2 GVariable Volume, Single Duct
Terminal Units2.12.3.3 GVariable Volume, Single Duct,
Fan-Powered Terminal Units2.12.3.4 GDual Duct Terminal Units2.12.3.5 GCeiling Induction Terminal Units2.12.3.7 GReheat Units2.12.4 GUnit Ventilators2.13 GEnergy Recovery Devices
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 48 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 00 00 1.4.6Test Procedures1.2.1.2Diagrams
SD-06 Test Reports3.12Performance Tests3.10Damper Acceptance Test
SD-07 Certificates1.4.1Bolts1.4.7Certification
SD-08 Manufacturer’s Instructions3.2Manufacturer's Installation
Instructions3.14.2Operation and Maintenance
TrainingSD-10 Operation and MaintenanceData
3.14.1 GOperation and MaintenanceManuals
23 03 00.00 20 SD-03 Product Data1.4.5.3Certification
23 05 93 SD-01 Preconstruction Submittals1.3 GRecords of Existing Conditions1.3.3 GRecords of Existing Conditions1.5.3.1 GTAB Firm1.2 GTAB team assistants1.2 GTAB team engineer1.5.3.2 GTAB Specialist
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 49 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 05 93 1.2 GTAB team field leaderSD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings andReport Forms
SD-03 Product Data1.3 GEquipment and Performance
Data1.5.3.4 GTAB Related HVAC Submittals1.5.2 GTAB Procedures1.5.2 GCalibration1.3.3 GSystems Readiness Check1.5.4 GTAB Execution1.5.4.3 GTAB Verification
SD-06 Test Reports1.3.3 GDesign review report1.7.2.1 GDesign review report1.7.2 GPre-Final DALT report3.3.5 GPre-Final DALT report1.7.2 GFinal DALT report3.3.8 GFinal DALT report1.5.5.2 GTAB report for Season 11.5.5.2 GTAB report for Season 2
SD-07 Certificates1.5.3.1 GTAB Firm1.5.1 GIndependent TAB Agency and
Personnel Qualifications
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 50 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 05 93 1.7.2 GDALT and TAB Submittal andWork Schedule
1.3.3 GDesign review report1.7.2.1 GDesign review report1.7.2.2 GPre-field DALT preliminary
notification1.7.2.3 GPre-field TAB engineering report1.7.2 GAdvanced notice for Season 1
TAB field work1.7.2 GPrerequisite HVAC Work Check
Out List For Season 123 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates2.3 GPipe Insulation Systems3.2 GPipe Insulation Systems3.3 GDuct Insulation Systems3.4 GEquipment Insulation Systems
SD-03 Product Data2.3 GPipe Insulation Systems3.2 GPipe Insulation Systems3.3 GDuct Insulation Systems3.4 GEquipment Insulation Systems
SD-08 Manufacturer’s Instructions2.3 GPipe Insulation Systems3.2 GPipe Insulation Systems3.3 GDuct Insulation Systems
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 51 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 07 00 3.4 GEquipment Insulation Systems23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 GCommissioning PlanSD-03 Product Data
3.2.1 GPre-Functional Performance TestChecklists
3.2.2 GFunctional Performance TestsSD-06 Test Reports
3.3 GCommissioning ReportSD-07 Certificates
1.5.1 GCommissioning Firm1.5.2 GCommissioning Specialist
23 09 23.13 20 SD-02 Shop Drawings1.4.1.1 GControl system drawings title
sheet1.4.1.2 GList of I/O Points1.4.1.3 GControl System Components List1.4.1.4 GControl system schematics1.4.1.5 GHVAC Equipment Electrical
Ladder diagrams1.4.1.6 GComponent wiring diagrams1.4.1.7 GTerminal strip diagrams1.4.1.8 GBACnet communication
architecture schematicSD-03 Product Data
2.1.1 GDirect Digital Controllers
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 52 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 09 23.13 20 2.1.1.13 GBACnet Gateways2.1.5 GBACnet Protocol Analyzer2.1.2 GDDC Software2.1.3 GBACnet Operator Workstation2.1.3.3 GBACnet Operator Workstation
DDC Software2.1.4 GNotebook Computer2.2 GSensors and Input Hardware2.3 GOutput Hardware2.4.2 GSurge and transient protection2.6 GIndicators2.7.1 GAir compressors2.7.2 GRefrigerated air dryers2.7.6 GPneumatic tubing2.5.1 GDuct smoke detectors2.8 GVariable frequency (motor) drives
SD-05 Design Data3.4.2 GPerformance Verification Testing
Plan3.4.4 GPre-Performance Verification
Testing ChecklistSD-06 Test Reports
3.4.11 GPerformance Verification TestingReport
SD-07 Certificates1.6.6 GContractor's Qualifications
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 53 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 09 23.13 20 SD-09 Manufacturer’s FieldReports
3.4.1 GPre-PVT ChecklistSD-10 Operation and MaintenanceData
1.4 GBACnet Direct Digital ControlSystems
3.3 GControls System OperatorsManuals
2.8.2 GVFD Service ManualsSD-11 Closeout Submittals
3.5.1 GTraining documentation23 09 23 SD-02 Shop Drawings
3.3.1 GDDC Contractor Design Drawings3.3.2 GDraft As-Built Drawings3.3.3 GFinal As-Built Drawings
SD-03 Product Data2.1.1 GManufacturer's Catalog Data2.14.1 GManufacturer's Catalog Data2.14.5 GProgramming Software2.14.5 GGPPC Application Programs2.14.6 GAGC Application Programs2.14.1 GXIF files3.6.2 GDraft LNS Database1.3.1 GFinal LNS Database3.7.4 GFinal LNS Database
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 54 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 09 23 2.14.4 GLNS Plug-in2.14.6 GLNS Plug-in
SD-06 Test Reports3.1 GExisting Conditions Report3.6.1 GStart-Up and Start-Up Testing
Report3.7.1 GPVT Procedures3.7.3 GPVT Report1.6 GPre-Construction QC Checklist1.6 GPost-Construction QC Checklist
SD-10 Operation and MaintenanceData
1.8 GOperation and Maintenance(O&M) Instructions
3.9.1 GTraining DocumentationSD-11 Closeout Submittals
1.6 GCloseout QC Checklist23 09 53.00 20 SD-02 Shop Drawings
1.6.1 GControl system diagrams1.6.2 GLadder diagram1.6.3 GOperating parameters1.6.4 GAutomatic control valve
schedules1.6.5 GDamper schedules1.6.8 GSequence of operation1.6.9 GArrangement drawing
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 55 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 09 53.00 20 1.6.6 GWiring diagram1.6.7 GCompressed air station
schematic1.6.7 GControl panel schematics
SD-03 Product Data2.2 GActuators2.3 GValves2.4 GDampers2.5 GFire protection devices2.6 GSensors2.8 GThermostats2.9 GSunshields2.10.1 GPressure switches2.11 GIndicating devices2.13 GControllers2.12 GPressure gages2.15 GControl panels2.16.1 GAir Compressor2.16.2 GRefrigerated air dryer2.16.2 GAir filtration system2.16.2 GCompressed air station
specialties2.17 GVAV Terminal unit controls
SD-06 Test Reports1.8.6 GCommissioning procedures
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 56 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 09 53.00 20 1.8.7 GCalibration adjustment andcommissioning reports
1.8.5 GSite testing procedures3.3.5 GPerformance verification test
SD-07 Certificates3.3.4Certification of completion
SD-08 Manufacturer’s Instructions3.4.1Training course documentation
SD-10 Operation and MaintenanceData
1.8.8 GSpace temperature controlsystem
SD-11 Closeout Submittals3.5Qualified service organization list
23 11 25 SD-02 Shop Drawings1.4.3 GGas Piping System2.2 GGas Piping System3.3 GGas Piping System
SD-03 Product Data1.5 GPipe and Fittings1.4.3 GGas equipment connectors1.4.3 GGas Piping System2.2 GGas Piping System3.3 GGas Piping System2.1 GPipe Coating Materials2.6 GPressure regulators
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 57 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 11 25 2.4 GRisers2.2.12 GTransition fittings2.3 GValves2.6 GValve box2.2.8 GWarning and identification tape
SD-06 Test Reports3.16Testing3.16.1Pressure Tests3.16.1Pressure Tests for Liquefied
Petroleum Gas3.16.2Test With Gas
SD-07 Certificates1.4.1Welders procedures and
qualifications1.4.1assigned number, letter, or
symbolSD-08 Manufacturer’s Instructions
1.4.2 GPE pipe and fittings2.1 Gpipe coating materials
SD-10 Operation and MaintenanceData
1.2.1 GGas facility system andequipment operation
1.2.2 GGas facility system maintenance1.2.3 GGas facility equipment
maintenance
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 58 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 23 00 SD-02 Shop Drawings2.3 GRefrigerant Piping System
SD-03 Product Data2.3Refrigerant Piping System1.5.2Spare Parts1.3.1 GQualifications3.5 GRefrigerant Piping Tests3.4 GDemonstrations3.6 GDemonstrations3.1Verification of Dimensions
SD-06 Test Reports3.5Refrigerant Piping Tests
SD-07 Certificates2.1 GService Organization
SD-10 Operation and MaintenanceData
1.5Maintenance3.4Operation and Maintenance
Manuals23 52 00 SD-02 Shop Drawings
1.5Detail DrawingsSD-03 Product Data
2.1.1Materials and Equipment1.5Spare Parts2.17Water Treatment System2.17Boiler Water Treatment
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 59 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 52 00 3.10Heating System Tests3.13Fuel System Tests2.9Unit Heaters1.3Welding3.10Qualifications3.12Field Instructions3.4Tests
SD-06 Test Reports3.10Heating System Tests3.13Fuel System Tests3.10.1Water Treatment Testing
SD-07 Certificates2.12.12.3Bolts2.12.2Continuous Emissions Monitoring2.1.3Energy Star
SD-10 Operation and MaintenanceData
3.12Operation and MaintenanceInstructions
2.17Water Treatment System23 57 10.00 10 SD-02 Shop Drawings
2.17Heating SystemSD-03 Product Data
1.5Spare Parts3.4Welding3.19Framed Instructions
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 60 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 57 10.00 10 SD-06 Test Reports3.18Testing and Cleaning3.18.4Water Treatment Testing
SD-07 Certificates2.2.9.3Bolts
SD-10 Operation and MaintenanceData
3.20Operation and MaintenanceManuals
23 63 00.00 10 SD-02 Shop Drawings1.3.2 GDrawings
SD-03 Product Data2.10 GRefrigeration System1.5.3Spare Parts3.2.23Framed Instructions1.3.1 GQualifications3.1Verification of Dimensions2.22.1Coil Corrosion Protection3.3Tests3.4 GDemonstrations
SD-06 Test Reports3.3 GTests
SD-07 Certificates2.10Refrigeration System1.3.3Service Organizations
23 64 00 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 61 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 64 00 1.5.2 GDrawingsSD-03 Product Data
3.4.1 GAbsorption Water Chiller3.4.1 GAbsorption Water Chiller3.4.2 GAbsorption Water Chiller3.4.2 GAbsorption Water Chiller3.6 GPosted Instructions1.5.1 GVerification of Dimensions3.5 GSystem Performance Tests3.6Demonstrations
SD-06 Test Reports3.4Field Acceptance Testing3.4.1Absorption water chiller3.4.2Absorption water chiller3.5System Performance Tests
SD-07 Certificates3.4.1 GAbsorption Water Chiller3.4.2 GAbsorption Water Chiller
SD-08 Manufacturer’s Instructions3.1Water chiller
SD-10 Operation and MaintenanceData
3.6Operation and MaintenanceManuals
23 64 10 SD-03 Product Data2.5 GWater Chiller
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 62 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 64 10 2.5 GWater Chiller3.1 GWater Chiller3.1 GWater Chiller3.4.1 GWater Chiller3.4.1 GWater Chiller3.4.2 GWater Chiller3.4.2 GWater Chiller3.6Posted Instructions1.5.1Verification of Dimensions1.7Manufacturer's Multi-Year
Compressor Warranty2.9Factory Tests3.5System Performance Tests3.6Demonstrations
SD-06 Test Reports3.4Field Acceptance Testing2.5Water Chiller3.1Water Chiller3.4.1Water Chiller3.4.2Water Chiller2.9Factory Tests3.5System Performance Tests
SD-07 Certificates3.1.2 GRefrigeration System
SD-08 Manufacturer’s Instructions2.5 GWater Chiller
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 63 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 64 10 3.1 GWater Chiller3.4.1 GWater Chiller3.4.2 GWater Chiller
SD-10 Operation and MaintenanceData
3.6 GOperation and MaintenanceManuals
23 64 26 SD-03 Product Data2.2.2.4 GGrooved Mechanical
Connections For Steel2.5.3 GGrooved Mechanical
Connections For Copper2.6.8 GCalibrated Balancing Valves2.6.9 GAutomatic Flow Control Valves2.6.10Pump Discharge Valve2.6.11 GWater Temperature Mixing Valve2.6.12 GWater Temperature Regulating
Valves2.6.13Water Pressure Reducing Valve2.6.14Pressure Relief Valve2.6.15Combination Pressure and
Temperature Relief Valves2.7.9 GExpansion Joints2.8 GPumps2.7.3Combination Strainer and Pump
Suction Diffuser
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 64 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 64 26 2.9Expansion Tanks2.10Air Separator Tanks2.11 GWater Treatment Systems
SD-06 Test Reports3.1.1.3Piping welds NDE report3.4.2 GPressure tests reports3.4.3 GCondenser Water Quality Test
Reports3.4.3 GCondenser Water Quality Test
Reports3.6 GOne-Year Inspection Report For
Cooling WaterSD-07 Certificates
3.1.1.1Employer's Record Documents(For Welding)
3.1.1.2Welding Procedures andQualifications
2.3Piping for Steam andCondensate
2.4Piping for High-PressureCompressed-Air Systems
2.3Fittings2.4Fittings2.3Unions2.4Unions2.3Flanges
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 65 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 64 26 2.4Flanges2.3Gaskets2.4Gaskets2.3Bolting2.4Bolting
SD-08 Manufacturer’s Instructions3.5 GLesson plan for the Instruction
CourseSD-10 Operation and MaintenanceData
2.11 GWater Treatment Systems2.6.8 GCalibrated Balancing Valves2.6.9 GAutomatic Flow Control Valves2.6.10 GPump Discharge Valve2.6.11 GWater Temperature Mixing Valve2.6.12 GWater Temperature Regulating
Valves2.6.13 GWater Pressure Reducing Valve2.6.14 GPressure Relief Valve2.6.15 GCombination Pressure and
Temperature Relief Valves2.7.9 GExpansion Joints2.8 GPumps2.7.3 GCombination Strainer and Pump
Suction Diffuser2.9 GExpansion Tanks
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 66 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 64 26 2.10 GAir Separator Tanks23 65 00 SD-03 Product Data
2.5 GCooling Towers3.1 GPosted Instructions3.1 GDemonstrations1.5.1 GVerification of Dimensions
SD-06 Test Reports3.2 GPackaged cooling tower -
installation instructions3.2 GField-erected cooling tower -
installation instructions3.3.1 GPackaged cooling tower - field
acceptance test plan3.3.1 GField-erected cooling tower - field
acceptance test plan3.4 GPackaged cooling tower - field
acceptance test report3.4 GField-erected cooling tower - field
acceptance test reportSD-07 Certificates
2.1Service Organization2.5.1.12Cooling Tower
SD-08 Manufacturer’s Instructions3.2Packaged cooling tower -
installation instructions
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 67 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 65 00 3.2Field-erected cooling tower -installation instructions
SD-10 Operation and MaintenanceData
3.1Operation and MaintenanceManuals
23 82 01.00 10 SD-02 Shop Drawings3.2 GInstallation
SD-03 Product Data1.6Spare Parts2.2Furnace3.6Tests3.6 GSystem Diagrams1.4Qualifications3.5Field Training
SD-06 Test Reports3.6Tests
SD-10 Operation and MaintenanceData
3.5Operating and MaintenanceManuals
23 82 02.00 10 SD-02 Shop Drawings1.4Drawings
SD-03 Product Data2.1Materials and Equipment1.6Spare Parts
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 68 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
23 82 02.00 10 3.4Posted Instructions3.1Verification of Dimensions2.10.1.1Coil Corrosion Protection3.6System Performance Tests3.4Demonstrations
SD-06 Test Reports3.5Refrigerant Tests, Charging, and
Start-Up3.6System Performance Tests
SD-07 Certificates2.1Materials and Equipment2.1.1Service Organization
SD-10 Operation and MaintenanceData
3.4Operation and MaintenanceManuals
25 08 10 SD-01 Preconstruction Submittals3.4 GFactory Test
SD-06 Test Reports3.1UMCS and Building Level DDC
Testing Sequence3.6 GPerformance Verification Test3.7Endurance Testing
25 10 10 SD-02 Shop Drawings3.3.2 GUMCS Contractor Design
Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 69 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
25 10 10 3.3.3 GDraft As-Built Drawings3.3.3 GFinal As-Built Drawings
SD-03 Product Data2.1.4 GProduct Data Sheets2.4 GComputer Software
SD-05 Design Data3.3.1 GNetwork Bandwidth Usage
CalculationsSD-06 Test Reports
3.2Existing Conditions Report3.1Factory Test Procedures3.1Factory Test Report3.7Start-Up and Start-Up Testing
Report3.8.1PVT Phase I Procedures3.8.2PVT Phase I Report3.8.3PVT Phase II Report1.6Pre-Construction QC Checklist1.6Post-Construction QC Checklist
SD-10 Operation and MaintenanceData
3.9.8.1 GPreventive Maintenance WorkPlan
3.10.1 GBasic Operator TrainingDocumentation
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 70 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
25 10 10 3.10.1 GAdvanced Operator TrainingDocumentation
3.10.1 GOperator Refresher TrainingDocumentation
1.7 GOperation and Maintenance(O&M) Instructions
SD-11 Closeout Submittals1.6 GCloseout QC Checklist
26 05 48.00 10 SD-02 Shop Drawings3.2Lighting Fixtures in Buildings1.3Equipment Requirements
SD-03 Product Data3.2 GLighting Fixtures in Buildings1.3 GEquipment Requirements1.2.4 GContractor Designed Bracing
26 08 00 SD-06 Test Reports3.1Acceptance tests and inspections
SD-07 Certificates1.4.1 GQualifications1.4.3 GAcceptance test and inspections
procedure26 20 00 SD-02 Shop Drawings
2.23Motor control centersSD-03 Product Data
2.19 GTransformers2.21 GMotor controllers
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 71 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
26 20 00 2.34Metering2.26.1CATV outlets2.36Surge protective devices
SD-06 Test Reports3.5.2600-volt wiring test3.5.5Grounding system test3.5.3Transformer tests
SD-09 Manufacturer’s FieldReports
2.38.1Transformer factory testsSD-10 Operation and MaintenanceData
1.5.1Electrical Systems2.34Metering
26 23 00 SD-02 Shop Drawings1.5.2 GSwitchboard / Switchgear
DrawingsSD-03 Product Data
2.2 GSwitchboard / SwitchgearSD-06 Test Reports
2.5.2Switchboard / Switchgear designtests
2.5.3Switchboard / Switchgearproduction tests
3.5.1 GAcceptance checks and tests
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 72 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
26 23 00 SD-10 Operation and MaintenanceData
1.6.1 GSwitchboard / SwitchgearOperation and Maintenance
SD-11 Closeout Submittals1.6.2Assembled Operation and
Maintenance Manuals2.5.1 GEquipment Test Schedule3.5 GRequest for Settings
26 28 01.00 10 SD-03 Product Data2.14Fault Current Analysis2.14Protective Device Coordination
Study2.1Equipment1.4.1System Coordinator3.3.5Protective Relays3.2Installation
SD-06 Test Reports3.3Field Testing
SD-07 Certificates1.6Devices and Equipment
26 32 14.00 10 SD-02 Shop Drawings1.4.6 GDetailed Drawings3.11 GAcceptance
SD-03 Product Data2.4Manufacturer's Catalog
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 73 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
26 32 14.00 10 3.10Instructions1.4.3Experience1.4.4Field Engineer1.4.2Site Welding3.2General Installation3.1Site Visit
SD-05 Design Data2.8Sound Limitations2.14Generator2.5.4Integral Main Fuel Storage Tank3.6.2.2Power Factor2.7.2Heat Exchanger2.18.5Time-Delay on Alarms2.7Cooling System1.2.5Vibration Isolation
SD-06 Test Reports3.6.6Performance Tests3.6 GOnsite Inspection and Tests
SD-07 Certificates1.2.5Vibration Isolation3.4Prototype Tests1.2.6Reliability and Durability2.11Emissions2.8Sound limitations2.14.1Current Balance2.3Materials and Equipment
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 74 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
26 32 14.00 10 2.27Factory Inspection and Tests3.6.4Inspections2.7Cooling System
SD-10 Operation and MaintenanceData
1.6.1Operation Manual1.6.2Maintenance Manual1.6.3Extra Materials
26 36 00.00 10 SD-02 Shop Drawings1.3.1Detail Drawings3.1Installation
SD-03 Product Data2.1Equipment
SD-06 Test Reports2.6Testing
SD-10 Operation and MaintenanceData
1.3.2Switching Equipment3.2Instructions
26 42 14.00 10 SD-02 Shop Drawings1.4.6 GDrawings1.2.1 GContractor's Modifications
SD-03 Product Data1.2 GEquipment1.6Spare Parts
SD-06 Test Reports
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 75 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
26 42 14.00 10 3.5Tests and Measurements1.2.1Contractor's Modifications
SD-07 Certificates1.2Cathodic Protection System1.4.1 GServices of 'Corrosion Expert'
SD-10 Operation and MaintenanceData
1.2Cathodic Protection System3.6Training Course
26 42 17.00 10 SD-02 Shop Drawings1.2.1 GDetail Drawings1.2.2 GContractor's Modifications
SD-03 Product Data2.4Miscellaneous Materials1.6Spare Parts
SD-06 Test Reports3.6Tests and Measurements1.2.2Contractor's Modifications
SD-07 Certificates3.6Tests and Measurements1.2.1Cathodic Protection System1.4.1 GServices of 'Corrosion Expert'
SD-10 Operation and MaintenanceData
1.2.1Cathodic Protection System3.5Training Course
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 76 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
26 51 00 SD-03 Product Data2.1Fluorescent lighting fixtures1.6.1Fluorescent electronic ballasts2.1.5Fluorescent lamps2.10Exit signs2.11 GEmergency lighting equipment2.13 GCentral emergency system2.14Occupancy sensors2.1.2Electronic dimming ballast2.1.3Dimming ballast controls1.6.3.3Energy Efficiency
SD-06 Test Reports3.3Operating test
26 56 00 SD-02 Shop Drawings1.4.1.1Luminaire drawings
SD-03 Product Data2.2Luminaires2.2.1Lamps2.2.2Ballasts2.3Lighting contactor2.4Time switch2.5Photocell switch2.6.2Aluminum poles2.6.3Steel poles2.7Brackets2.9Auxiliary instant-on quartz system
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 77 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
26 56 00 SD-05 Design Data1.4.3Design Data for luminaires1.4.2Pressure treated wood pole
quality3.2Operating test
27 10 00 SD-02 Shop Drawings1.6.1.1 GTelecommunications drawings1.6.1.2 GTelecommunications Space
DrawingsSD-03 Product Data
2.3 GTelecommunications cabling2.4.5 GPatch panels2.5 GTelecommunications
outlet/connector assemblies2.4.2 GEquipment support frame2.4.3 GConnector blocks1.10.3Spare Parts
SD-06 Test Reports3.5.1 GTelecommunications cabling
testingSD-07 Certificates
1.6.2.1 GTelecommunications Contractor1.6.2.2 GKey Personnel1.6.2.3 GManufacturer Qualifications1.6.3 GTest plan
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 78 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
27 10 00 SD-09 Manufacturer’s FieldReports
2.12.1 GFactory reel testsSD-10 Operation and MaintenanceData
1.10.1 GTelecommunications cabling andpathway system
SD-11 Closeout Submittals1.10.2 GRecord Documentation
27 54 00.00 20 SD-02 Shop Drawings1.6.1wiring diagrams and installation
detailsSD-03 Product Data
2.2.1Amplifiers2.2.2Cables2.2.3Terminators2.2.4Splitters2.2.5Outlets2.2.6Connectors2.3.1Grounding block
SD-05 Design Data1.6.2CATV System Loss Calculations
SD-06 Test Reports3.2.2Acceptance tests
28 31 33.00 10 SD-02 Shop Drawings1.2 GFire Alarm Reporting System
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 79 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
28 31 33.00 10 3.2.2Wiring for SystemsSD-03 Product Data
2.3.2.1Battery1.6Spare Parts1.4Qualifications3.5Training3.6Test Procedures
SD-06 Test Reports3.6Testing
SD-07 Certificates1.6Equipment
SD-10 Operation and MaintenanceData
1.2Fire Alarm Reporting System28 31 64.00 10 SD-02 Shop Drawings
1.4.2Detail DrawingsSD-03 Product Data
1.7Special Tools and Spare Parts2.4Battery Calculations
SD-06 Test Reports3.7Testing
SD-07 Certificates1.4.1Qualifications
SD-10 Operation and MaintenanceData
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 80 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
28 31 64.00 10 1.5Technical Data and ComputerSoftware
3.6Operating and MaintenanceInstructions
28 31 76 SD-02 Shop Drawings3.2.1Wiring Diagrams1.4.1System Layout2.3System Operation
SD-03 Product Data2.14 GFire Alarm Control Unit and Mass
Notification Control Unit (FMCP)2.18Manual stations2.22 GTransmitters2.13.1 GBatteries2.13.2 GBattery chargers2.10Smoke sensors2.11Heat detectors2.19Notification appliances2.7Addressable interface devices2.16Amplifiers2.15 GRemote Fire Alarm/Mass
Notification Control Units2.22.1Radio transmitter and interface
panels2.14.5.2Local Operating Console (LOC)
SD-05 Design Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 81 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
28 31 76 2.13.1.2Battery Power CalculationsSD-06 Test Reports
3.7Field Quality Control3.7.1Testing Procedures3.7.2.3Final Testing
SD-07 Certificates1.6.1Qualifications
SD-10 Operation and MaintenanceData
1.8Operation and Maintenance(O&M) Instructions
3.8Instruction of GovernmentEmployees
SD-11 Closeout Submittals3.7.2.4As-Built Drawings3.7.2.4As-Built Drawings1.4.2Technical Data And Computer
Software31 00 00 SD-01 Preconstruction Submittals
3.5 GShoring1.3.3 GDewatering Work Plan1.3.2 GBlasting
SD-03 Product Data3.9 GUtilization of Excavated Materials1.3.1.2Rock Excavation
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 82 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
31 00 00 3.4Opening of any Excavation orBorrow Pit
3.15Shoulder Construction2.7Structural Backfill
SD-06 Test Reports3.18Testing2.1Borrow Site Testing
SD-07 Certificates3.18Testing
31 11 00 SD-03 Product Data3.6.2Nonsaleable Materials
SD-04 Samples2.1Tree wound paint2.2Herbicide
31 36 00 SD-04 Samples1.5.1Gabions2.1.3Alternative Wire Fasteners
SD-06 Test Reports1.5.1Gabions2.1.3 GAlternative Wire Fasteners
SD-07 Certificates2.1.5Stone Fill2.1.6Filter Material
32 01 19 SD-03 Product Data1.2.2.3 GManufacturer's
Recommendations
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 83 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 01 19 1.2EquipmentSD-06 Test Reports
1.4.2 GCertified copies of the test reports32 05 33 SD-01 Preconstruction Submittals
2.4 GIntegrated Pest ManagementPlan
SD-03 Product Data2.1Fertilizer2.3Mulches Topdressing2.3.2Organic Mulch Materials
SD-07 Certificates3.5.1Maintenance inspection report3.5.2 GPlant quantities
SD-11 Closeout Submittals3.5.3Tree, staking and guying removal
32 11 16.16 SD-05 Design Data2.1Gradation curve
SD-06 Test Reports2.1Bearing ratio2.1Liquid limit2.1Plasticity index2.1Dry weight2.1Percentage of wear3.4.2.1Gradation tests3.4.2.3Density tests2.1Materials
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 84 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 11 16.16 2.2.1GeotextileSD-07 Certificates
2.2Source32 11 16 SD-03 Product Data
1.3EquipmentSD-06 Test Reports
1.5Sampling and Testing1.5.2.4Field Density Tests
32 11 23 SD-03 Product Data1.3Plant, Equipment, and Tools
SD-06 Test Reports1.5Sampling and Testing1.5.2.4Field Density Tests
32 11 24 SD-06 Test Reports3.8.2.1Gradation3.8.2.1Gradation2.1.1Bearing ratio2.1.1Liquid limit2.1.1Plasticity index2.1.1Percentage of wear2.1.1Dry weight3.8.2.3Density3.8.2.3Density3.8.2.2Smoothness3.8.2.5Thickness2.1.1Aggregates
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 85 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 12 10 SD-06 Test Reports3.7Sampling and Testing
32 12 11 SD-03 Product Data2.1.2.1Cutback Asphalt2.1.2.3Asphalt Cement
SD-06 Test Reports1.4.2Aggregate Gradation Tests1.4.3Wear Test1.4.4Soundness Test1.4.5Stripping Test
32 12 16 SD-03 Product Data2.3 GMix Design3.10 GContractor Quality Control3.11 GMaterial Acceptance2.3.1Job Mix Formula
SD-06 Test Reports2.1 GAggregates3.10.3.10QC Monitoring
SD-07 Certificates2.2Asphalt Cement Binder3.6Testing Laboratory
32 12 37 SD-03 Product Data2.5Sealer Mixture
SD-06 Test Reports1.4.2 GSealer Materials
32 13 13.06 SD-03 Product Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 86 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 13 13.06 2.1.5Curing materials2.1.3Admixtures2.1.4.1Dowel2.1.4.4 GReinforcement
SD-05 Design Data2.3 Gmix design
SD-06 Test Reports2.1.2Aggregate3.7.2Concrete slump tests3.7.4Air content tests3.7.3Flexural strength tests2.1.1 GCementitious materials
SD-07 Certificates1.5.1Ready-mixed concrete plant1.5.4Batch tickets2.1.1 GCementitious materials
32 13 73 SD-03 Product Data1.2Equipment3.1.1Manufacturer's Instructions2.1Compression Seals2.2LUBRICANT/ADHESIVE
SD-06 Test Reports1.2.3Test Requirements
32 15 00 SD-03 Product Data1.3.4Equipment
SD-06 Test Reports
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 87 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 15 00 1.3Sampling and Testing3.12Density Tests
32 16 13 SD-03 Product Data2.1Concrete
SD-06 Test Reports3.8Field Quality Control
32 17 24.00 10 SD-03 Product Data1.2 GEquipment2.1PAINT2.2THERMOPLASTIC
COMPOUNDS2.2.3Asphalt Concrete Primer2.5REFLECTIVE MEDIA
SD-06 Test Reports2.6Sampling and Testing
SD-07 Certificates1.4.1Qualifications2.2.3Volatile Organic Compound
(VOC)32 18 16.13 SD-02 Shop Drawings
1.5.4Shop Drawings3.1.1Finished Grade and Underground
UtilitiesSD-03 Product Data
2.2Synthetic Surfacing2.3Loose Fill Surfacing
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 88 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 18 16.13 3.3Loose Fill Surfacing system2.4Geotextile Fabric1.5.1Manufacturer's Qualification2.6.2Wood3.1Site Preparation3.2.1Temperature Limitation2.3.3Wood By-Products2.6.2.2Wood Treatment2.2.9Adhesive2.2.5Color
SD-06 Test Reports3.1.4Percolation Test2.5Recycled Plastic2.2Synthetic Surfacing2.3.1Sand2.3.2Gravel
SD-07 Certificates2.1Materials1.5.1Manufacturer's Qualification1.5.2Manufacturer's Representative1.5.3Installer's Qualification3.1.5Substitution3.5Protective Surfacing Acceptance
SD-10 Operation and MaintenanceData
1.8Maintenance Instructions
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 89 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 31 13.53 SD-02 Shop Drawings1.3.2Fence Installation3.1Fence Installation1.3.2Installation Drawings1.3.2Location of gate, corner, end, and
pull posts1.3.2Gate Assembly2.7.1Gate Assembly2.7.1Gate Assembly1.3.2Turnstiles2.8Turnstiles1.3.2Gate Hardware and Accessories2.7.3Gate Hardware and Accessories
SD-03 Product Data1.3.2Fence Installation3.1Fence Installation1.3.2Gate Assembly2.7.1Gate Assembly2.7.1Gate Assembly1.3.2Gate Hardware and Accessories1.3.2Gate Hardware and Accessories2.7.3Gate Hardware and Accessories2.7.3Gate Hardware and Accessories2.6Concrete2.1FENCE FABRIC2.2Posts
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 90 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 31 13.53 2.2.2Post Caps2.3Braces2.3Line Posts3.1.3Sleeves2.2.2Tension Wire2.4.2Barbed Wire2.2.2Barbed Wire Supporting Arms2.5Barbed Tape2.1.1Stretcher Bars2.1.1Gate Posts1.3.2Turnstiles2.8Turnstiles2.9Padlocks2.4.1Wire Ties2.11ELECTRO-MECHANICAL
LOCKS2.10GATE OPERATOR
SD-07 Certificates1.3.1Reports
SD-08 Manufacturer’s Instructions1.3.2Fence Installation3.1Fence Installation1.3.2Gate Assembly2.7.1Gate Assembly2.7.1Gate Assembly3.7Hardware Assembly
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 91 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 31 13.53 SD-10 Operation and MaintenanceData
3.7Operating and maintenanceinstructions
32 31 13 SD-02 Shop Drawings1.3 GFence Assembly3.17.1 GLocation of Gate, Corner, End,
and Pull Posts1.3 GGate Assembly2.17 GGate Hardware and Accessories1.3 GErection/Installation Drawings
SD-03 Product Data1.3Fence Assembly1.3Gate Assembly2.17Gate Hardware and Accessories2.2Zinc Coating1.5.1PVC Coating1.5.1Aluminum Alloy Coating2.3Fabric2.12Stretcher Bars2.20Concrete2.15GATE POSTS
SD-07 Certificates1.5.2 GCertificates of Compliance
SD-08 Manufacturer’s Instructions1.3Fence Assembly
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 92 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 31 13 1.3Gate Assembly1.3Hardware Assembly1.3Accessories
32 84 23 SD-02 Shop Drawings3.2Sprinkler System
SD-03 Product Data3.3Framed Instructions3.4Field Training3.2Sprinkler System1.5Spare Parts1.2Design Analysis and Calculations
SD-06 Test Reports3.5Field Tests
SD-07 Certificates3.2Sprinkler System
SD-10 Operation and MaintenanceData
3.2Sprinkler System32 84 24 SD-02 Shop Drawings
1.3Irrigation sprinkler systemSD-03 Product Data
2.1Piping materials2.3Valves2.2heads2.3.6Backflow preventers2.5Automatic controller
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 93 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 84 24 2.1.4Solvent cement2.6.1Control wiring2.1.7Drip irrigation2.4.4.2Water hammer arresters2.4.2Water meter2.4.5.1Rain shut-off device2.4.5.2Freeze shut-off device2.4.5.3Soil moisture sensor2.4.1Tapping tee3.1.7.3Valve boxes and lids2.4.3Drip head accessories
SD-05 Design Data1.3System pressure calculations1.3Irrigation requirements
SD-06 Test Reports1.7.1tests2.3.6Backflow preventers3.2.1Pressure test3.2.2Operation test
SD-07 Certificates2.3.6Backflow preventers
SD-08 Manufacturer’s Instructions2.5Automatic controller2.2heads2.1Piping materials2.3.6Backflow preventers
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 94 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 84 24 2.3Valves2.1.4Solvent cement2.6.1Control wiring2.1.7Drip irrigation2.4.4.2Water hammer arresters2.4.2Water meter2.4.5.1Rain shut-off device2.4.5.2Freeze shut-off device2.4.5.3Soil moisture sensor
SD-10 Operation and MaintenanceData
2.1 GPiping materials2.2 Gheads2.3.6 GBackflow preventers2.3 GValves2.5 GAutomatic controller2.1.7 GDrip irrigation2.4.4.2 GWater hammer arresters2.4.2 GWater meter2.4.5.1 GRain shut-off device2.4.5.2 GFreeze shut-off device2.4.5.3 GSoil moisture sensor
SD-11 Closeout Submittals3.2.3Controller Charts
32 92 19 SD-03 Product Data2.5.3Wood cellulose fiber mulch
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 95 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 92 19 2.1Seed2.4Fertilizer
SD-06 Test Reports2.2.3Topsoil composition tests
SD-08 Manufacturer’s Instructions2.7Erosion Control Materials
32 92 23 SD-03 Product Data2.4Fertilizer
SD-06 Test Reports2.2.3Topsoil composition tests
SD-07 Certificates2.1sods
32 93 00 SD-01 Preconstruction Submittals1.4.3Landscape Contractor's License1.6Time Restrictions and Planting
ConditionsSD-03 Product Data
2.6 GWeed control fabric2.8.7Metal anchors2.10Erosion control materials1.4.4 GPhotographs2.7Mulch
SD-06 Test Reports1.4.1Topsoil composition tests2.2.4Topsoil composition tests1.4.5Percolation Test
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 96 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
32 93 00 SD-07 Certificates1.4.2Nursery certifications2.1.1Nursery certifications
32 96 00 SD-01 Preconstruction Submittals1.4.1Photographs
SD-02 Shop Drawings1.4.2Transplanting Plan
SD-03 Product Data1.4.2Equipment
SD-06 Test Reports1.4.3Soil Test1.4.4Percolation Test
33 08 55 SD-01 Preconstruction Submittals1.6 GCommissioning Plan
SD-06 Test Reports3.5.3Piping Flushing Checklist3.7.4Piping Cleaning Checklist3.8.1Control Valve Checklist1.8Commissioning Report
SD-07 Certificates1.7Certification of Completion1.9Disposal of Waste Materials
33 11 00 SD-03 Product Data2.1.1Piping Materials2.1Water distribution main2.2Water service line
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 97 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
33 11 00 2.1.2.7 GHydrants2.1.2.8 GIndicator posts2.2.2.1Corporation stops2.1.2.9Valve boxes2.2.2.12Valve boxes
SD-05 Design Data1.2.1Design calculations of water
pipingSD-06 Test Reports
2.2.2.18 GDisinfectionSD-07 Certificates
2.1Water distribution main2.2Water service line2.1.1.5lining and coating2.1.1.1Lining2.1.1.2Lining2.1.2.7hydrants2.2.2.14Displacement Type Meters2.2.2.15Compound Type Meters
SD-08 Manufacturer’s Instructions1.4Delivery, storage, and handling3.1.1Installation
33 30 00 SD-01 Preconstruction Submittals1.6Existing Conditions
SD-02 Shop Drawings1.4.1Installation Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 98 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
33 30 00 2.3.1Precast concrete manhole2.3.4Metal items2.3.4.1Frames, covers, and gratings
SD-03 Product Data2.1Pipeline materials
SD-06 Test Reports2.4Reports
SD-07 Certificates2.2.2Portland Cement2.1.3.2Gaskets
SD-11 Closeout Submittals1.4.1As-Built Drawings
33 34 00 SD-06 Test Reports3.2Hydrostatic Tests
33 40 00 SD-03 Product Data3.3Placing Pipe
SD-04 Samples2.1Pipe for Culverts and Storm
DrainsSD-07 Certificates
2.1.7Resin Certification2.1.8Resin Certification3.8Pipeline Testing2.7Hydrostatic Test on Watertight
Joints3.7.5Determination of Density
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 99 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
33 40 00 2.3.7Frame and Cover for Gratings33 46 16 SD-03 Product Data
2.5.5Installation Plan2.5.5.1Installation Plan
SD-04 Samples2.2Filter Fabric2.1Pipe for Subdrains
SD-06 Test Reports2.5.5Product Certification
SD-07 Certificates2.2Filter Fabric2.1Pipe for Subdrains
33 51 15 SD-02 Shop Drawings2.1Pipe, Fittings, and Associated
MaterialsSD-03 Product Data
2.1Materials and Equipment1.6Spare Parts2.1Pipe and Accessory Coatings
SD-05 Design Data1.4.2.2Connections to Existing Lines3.13Connections to Existing Lines1.4.2.2 GConnection and Abandonment
Plan3.13.2 GConnection and Abandonment
Plan
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 100 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
33 51 15 1.4.1.2Jointing of Polyethylene andFiberglass Piping
SD-06 Test Reports3.15.2 GPressure and Leak Tests
SD-07 Certificates1.4.1.1Welder's training, qualifications
and procedures3.13.1Utility Work
SD-10 Operation and MaintenanceData
1.2.1Gas distribution system andequipment operation
1.2.2Gas distribution systemmaintenance
1.2.3Gas distribution equipmentmaintenance
33 56 10 SD-02 Shop Drawings2.3.2Grounding and Bonding
SD-03 Product Data2.4Aboveground Storage Tank2.5Underground Storage Tank2.6Tank Protective Coatings2.8Automatic Level Alarm System2.9Tank Gauges2.10Manway Containment Sump
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 101 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
33 56 10 2.11Tank Mounted Fuel DispensingUnit
2.12Fuel HeatersSD-06 Test Reports
3.2.1 GAboveground Storage TankTightness Tests
3.2.2 GUnderground Storage TankTightness Tests
3.2.3Tank Manufacturer's Tests3.4Tank Fill Tests
SD-07 Certificates1.4.1Contractor Qualifications1.4.2.1Permitting1.4.2.2Registration1.4.2.3Licensed Personnel3.3Demonstrations
SD-08 Manufacturer’s Instructions2.4Aboveground Storage Tank2.5Underground Storage Tank2.8Automatic Level Alarm System2.9Tank Gauges2.12Fuel Heaters
SD-10 Operation and MaintenanceData
2.4Aboveground Storage Tank2.5Underground Storage Tank
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 102 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
33 56 10 2.8Automatic Level Alarm System2.9Tank Gauges2.12Fuel Heaters
33 58 00 SD-02 Shop Drawings2.3 GLeak Detection System2.4Electronic Monitoring/Alarm
Panel2.5Computational Pipeline
Monitoring SystemSD-03 Product Data
2.3 GLeak Detection System2.4Electronic Monitoring/Alarm
Panel2.5Computational Pipeline
Monitoring SystemSD-06 Test Reports
3.2.1Leak Detection System TestSD-07 Certificates
3.3DemonstrationsSD-08 Manufacturer’s Instructions
2.3Leak Detection SystemSD-10 Operation and MaintenanceData
2.3Leak Detection System2.4Electronic Monitoring/Alarm
Panel
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 103 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
33 58 00 2.5Computational PipelineMonitoring System
33 70 02.00 10 SD-02 Shop Drawings1.4.1 GDetail Drawings1.4.2As-Built Drawings
SD-03 Product Data2.19.4 GFault Current Analysis2.19 GProtective Device2.19.5 GCoordination Study2.1Material and Equipment3.2Installation Requirements
SD-06 Test Reports2.17Factory Tests3.12Field Testing3.12.13Operating Tests3.3.1.4Cable Installation
SD-07 Certificates2.1Material and Equipment3.4Cable Joints3.13.2Installation Engineer
SD-10 Operation and MaintenanceData
3.13.1Operation and MaintenanceManuals
33 71 01 SD-03 Product Data3.1.9Pole top switch
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 104 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
33 71 01 2.17 GRecloser2.18 GSectionalizer2.13 GCutouts2.15 GTransformer2.19 GMetering equipment2.19.3 GMeters2.12Surge arresters2.2.1Steel Poles2.10Anchors
SD-06 Test Reports3.6Field Quality Control1.5.3Ground resistance test reports
SD-09 Manufacturer’s FieldReports
2.25.2routine and other testsSD-10 Operation and MaintenanceData
1.6.1Operation and MaintenanceManuals
SD-11 Closeout Submittals2.25.1Transformer test schedule
33 82 00 SD-02 Shop Drawings1.6.1.1 GTelecommunications Outside
Plant1.6.1.2 GTelecommunications Entrance
Facility Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 105 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
33 82 00 SD-03 Product Data2.5Cable splices, and connectors2.3Closures2.2.1 GBuilding protector assemblies2.2.2Protector modules2.4 GCross-connect terminal cabinets1.8.2Spare Parts
SD-06 Test Reports3.5.1Pre-installation tests3.5.2Acceptance tests
SD-07 Certificates1.6.2.1 GTelecommunications Contractor1.6.2.2 GKey Personnel
SD-08 Manufacturer’s Instructions2.2.1Building protector assembly
installation3.1.10.2Fiber Optic Splices
SD-09 Manufacturer’s FieldReports
2.16.1Factory Reel Test DataSD-11 Closeout Submittals
1.8.1Record Documentation34 71 13.19 SD-02 Shop Drawings
3.1 GInstallation3.1 GEquipment2.8 GElectrical Work
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 106 OF 106 PAGES
2014 O&MA SPECIFICATIONS - KOREA
34 71 13.19 SD-03 Product Data1.2Barrier Systems1.5Spare Parts
SD-06 Test Reports3.7Field Testing
SD-10 Operation and MaintenanceData
1.2 GBarrier Systems3.6Operating and Maintenance
Instructions40 05 13.96 SD-03 Product Data
3.1Welding OperationsSD-06 Test Reports
3.1Nondestructive Test ReportSD-07 Certificates
1.5Qualifications1.5.1Welding Procedures Qualification1.5.2.1Certification
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)