Page 1: STEP DOWN ENCLOSED SHOWER MEMBRANE BELOW TILE BED · Title: Int - 001A – Shower Over Bath - Concrete - Plan - with title block Author: CHRISWANG\Chris (CHRISWANG) Created Date:

Tile bed

Membrane

Floor tile

Floor substrate

Water stop

WPShower side

25 mm min.

Tile bed

Height to be 25 mm above the maximumretained water level or 150 mm above thefinished tile level of the floor in the showerarea, whichever is the highest

Shower screen and track

STEP DOWN ENCLOSED SHOWERMEMBRANE BELOW TILE BED

C Copyright - all rights reserved 2010 Revision ANumber 018Ph: 1300 249 466

Email: [email protected]: www.waterproof.org.au