Study Area B - Goals
http://www.southsidegreen.com
• Reduce impervious Surface by 50%• Within that 30% landscape surface• Collect, store, treat water from street, ROW,
and adjacent structures• Allow for conveyance from Southside slopes• Make it visible and aesthetic• Priority to pedestrians
April 10 through 12, 2014
Study Area B – Design Achievements
http://www.southsidegreen.com
• Reduces Impervious Area by 47%• Implements 30% Landscaped Area• Provides storage for 1 inch per hour rain event• Model Analysis indicates near 100% capture of CSO overflows for
the typical year– 1.67 million gallons per year
• Additional runoff is conveyed downstream. Does not enter combined sewer.
April 10 through 12, 2014
Study Area BFull Plan
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BPlan
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BPlan
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BPlan
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BPlan
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BPlan
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BPlan
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BSection
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BSection
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BExisitng Perspective
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area BProposed Perspective
http://www.southsidegreen.com