2
Sleipner CCS operational since 1996
Snøhvit CCS operational since 2008
CO2 capture test centre (TCM) operational since 2012
➢ 22 years of operations
➢ Building confidence in CCS
➢ >22 Mt CO2 stored
➢ New full-scale CCS projectbeing developed
Norwegian CCS value chain project (2016-2022)
3
CCUS – Accumulation of experience and learning
Improve likelihood of the emerge of a scalable CO2 transport and
storage (T&S) infrastructure by
• significantly improve probability of third party CO2 volumes to
Northern Lights
• mature CO2 storage locations in time and scale to
accommodate clean hydrogen projects
• demonstrate radical cost reduction potential in CCUS value
chains
• demonstrate business case for CO2 for EOR and storage pilots,
as first step to commercial scale-up
Source: One North Sea report, 2010, NSBTF (North Sea Basin Task Force).
Pipeline
Well
Subsea structure
Export pump
Umbilical
CO2 transport ship
LCO2LCO2
LCO
2
Heater
LCO
2
LCO
2
LCO
2
Evaporator
improve probability of third party CO2 volumes to Northern Lights
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•