Sectoral Budget Support (SBS)

To National Program for Water Supply and Sanitation 2015(NP-WSS 2015)

April 2010

Ministry of Agriculture, Water andfisheries Resources

General Directorate of Water Resources

Burkina FasoUnity - Progress - Justice

Page 2: Session 3B Finance - Toro boro burkina faso

2

Summary of NP-WSS 2015

Sectoral budget support 2010-2015 to WSS

CONTENTS

Page 3: Session 3B Finance - Toro boro burkina faso

3

SUMMARY OF NP-WSS 2015

Page 4: Session 3B Finance - Toro boro burkina faso

4

To halve by 2015 the number of people without adequate access to drinking water and sanitation in 2005, in accordance with Strategic Framework for the Fight against Poverty and with Millenium Development Goals

Expected results

Section 1 : Rural area Section 2 : Urban area 4 million additional people have

adequate access to drinking water (by increasing the access rate of 60% in 2005 to 80% in 2015

5,7 million additional people have adequate access to sanitation (by increasing the rate of access of 10% in 2005 to 54% in 2015.

1,8 million additional people have adequate access to drinking water (by increasing the access rate of 74% in 2005 to 87% in 2015

2,1 million additional people have adequate access to sanitation of 14% in 2005 to 57% in 2015.

Goal

Page 5: Session 3B Finance - Toro boro burkina faso

5

The NP-WSS :

Implements program approach adopted by the Government for achieving the MDGs in the sector of WSS

Is the national programming framework for the development of WSS sector by 2015

Is part of the national strategy for integrated water resources management (IWRM)

Strategys

Page 6: Session 3B Finance - Toro boro burkina faso

6

In rural area, the Unified Framework for Intervention is the common reference for all actors. It defines the rules and procedures for all stakeholders, is used to support capacity building of all stakeholders, and for the transfer of powers to local authorities under legislation on decentralization.

Institutional frameworkThe preferred option is to build on existing structures and strengthen them in order first, to ensure ownership of the program by the State Services as part of their sovereign functions, and secondly, to state the respective roles of local authorities, private sector and civil society.

Strategys (continuation)

Page 7: Session 3B Finance - Toro boro burkina faso

7

Pilotage is organized on 2 levels :

national level (NP-WSS National Steering Committee & General Directorate of Water Resources [GDWR] as a national coordination and management structure for the programme)

regional level (NP-WSS Regional Steering Committee & Regional Directorate in charge of Water [RDAWFR] as a regional coordination and management structure for the programme)

Implementation is ensured :

in rural area, by GDWR, GDSWE and RDAWFR in conjunction with other regional directorates (Health, basic education, etc.) and local authorities. in urban area, by National Office of Water and Sanitation (NOWS) in conjunction with local authorities and referring contract plan signed with the Government

Institutional framework (continuation)

Page 8: Session 3B Finance - Toro boro burkina faso

8

17 290 drilling and wells 10 745 in districts 5 396 in schools 1 150 in health centres

520 low cost water supply systems (LCWSS) 257 in the capitals of rural commune 263 in the villages of at least 3500 residents

General rehabilitation of wells & drilling (manual pump, superstructures, etc.), LCWSS

Drinking water achievement in rural area

Page 9: Session 3B Finance - Toro boro burkina faso

9

395 000 family new latrines & 100 000 rehabilitation of existing latrines

60 000 sumps for single use

12 300 blocks of public latrines 5 400 in schools, 1 150 in health centers, 5 750 in other public places.

Sanitation, wastewater and Excreta achievement in rural area

Page 10: Session 3B Finance - Toro boro burkina faso

Total cost : 543,8 MM FCFA

Rural and semi-urban area Urban areaTotal : 406 MM FCFA HTT

Drinking water infrastructures :

308,4 MM FCFA

Sanitation infrastructures :

70,8 MM FCFA

Unified framework for intervention

26,8 MM FCFA

Total : 137,8 MM FCFA HTT

Drinking water infrastructures :

86,9 MM FCFA

Sanitation infrastructures :

50,9 MM FCFA

Detailed forecast 2007-2015

Page 11: Session 3B Finance - Toro boro burkina faso

11

BUDGET SUPPORT 2010-2015FOR WSS SECTOR

Page 12: Session 3B Finance - Toro boro burkina faso

12

Definition of budget support

• Budget support is defined as the transfer of

financial resources from development partners (donor agencies or governments) to the Treasury of a partner country. These financial resources are therefore part of the overall resources of the partner countries and are used according to its system of public finance management.

Page 13: Session 3B Finance - Toro boro burkina faso

13

Definition (continuation)

GBS AND SBS

• GBS (general budget support) Budget support is used at the discretion of

government

• SBS (sectoral budget support) Budget support is intended to support a specified area development.

Page 14: Session 3B Finance - Toro boro burkina faso

14

Conditions of SBS• The existence of a sectoral policy document and

approved a policy framework agreed policy with specific measurable results, a calendar and an institutional framework to ensure its effective implementation.

• A framework for medium term financing

established within budgetary limits also realistic medium term from all sources.

Page 15: Session 3B Finance - Toro boro burkina faso

15

Conditions of SBS (continuation)

• A process of coordination between different sector donors led by the government, and the harmonization and alignment processes of coordination, also under the auspices of the Government.

• A system for monitoring performance agreed between different actors.

Page 16: Session 3B Finance - Toro boro burkina faso

16

Eligibility of NP-WSS to SBS

Available : a macro-economic and fiscal stability policies and sectoral strategies translated into annual business

plans : NP-WSS a system for planning and budgeting financial medium term:

the Budget Program Objectives for the sector (BPO) Political dialogue and a coordination system controlled and

managed by the Ministry: the joint Revue : the NSC and RSC of NP-WSS

a monitoring and control of sector performance: the matrix of performance indicators of water and sanitation sector, developed jointly by the Government and TFP

Page 17: Session 3B Finance - Toro boro burkina faso

17

Objective & strategys

• The sector budget support (SBS) are provided by Sida, Danida and the EU for the implementation of the NP-WSS in ways that strengthen the program approach, budget support, decentralization and gender issues.

• They fit into the objectives and strategies of the NP-WSS, tools and control instruments (NSC, RSC, BPO, joint review)

Page 18: Session 3B Finance - Toro boro burkina faso

18

Amounts of SBS 2010-2015

TFP Asdi Danida

EU

Total (MM

FCFA)

Amount(fixed and variable

tranches in %)

12,6

(70% + 30%)

31

(70% + 30%)

24,9

(50% + 50%)

68,5

The support of all three TFP as SBS represents about 20% of the budget of the NP-WSS

Page 19: Session 3B Finance - Toro boro burkina faso

SBS Installment for 2010

The SBS installment for 2010 is an amount of 5 673 824 000 FCFA, shared between 6 regional directorates and 5 central (GDWR, GDSWWE, DPHHE, GDBE and NOWS)

Page 20: Session 3B Finance - Toro boro burkina faso

20

Challenges to the SBS

• Operational challenges

• Structural challenges

Page 21: Session 3B Finance - Toro boro burkina faso

21

Operational challenges

• a budget program objectives (BPO) year rolling ,validated by all stakeholders, approved by the NSC and accepted by the MEF.

• The implementation of a financial management software and appropriate budgetary likely to learn about accounting, financial et analytical management at central and regional level and over time.

Page 22: Session 3B Finance - Toro boro burkina faso

22

Structural challenges

• A system of monitoring and evaluation of the PN-AEPA to be efficient for periodic measurement of the achievement of results and the relevance, effectiveness, efficiency and sustainability of actions.

• the monitoring and evaluation system must allow a better understanding of the conditions of access of populations to water and sanitation.

Page 23: Session 3B Finance - Toro boro burkina faso

23

Structural challenges(continuation)

A good dose of responsiveness at all stages of public expenditure. This requires technical services :• an anticipation in placing orders •Good control mechanisms of the SBS and tools of implementation.

Page 24: Session 3B Finance - Toro boro burkina faso

24

Thank you for your attention