About the“ THE ROBBINS COMPANY “ History Current projects Projects in INDIA Tunneling methods Types of Tunnel Boring machine Working of Tunnel boring machine (TBM -
317)
CONTENTS
![Page 3: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/3.jpg)
WORLD FIRST COMPANY TO MAKE TUNNEL BORING MACHINE IN 1951.
BORED OVER 3,500 KM OF TUNNEL
WORKED OVER MORE THAN 700 PROJECTS TILL DATE .
ABOUT THE ROBBINS COMPANY
![Page 4: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/4.jpg)
HAVE BOTH MANUFACTURING AND PRODUCTION COMPANY .
HEADQUATERS IS AT SOLON , OHIO ,
USA. HAVING MORE THAN
2.5 LAKH EMPLOYER AT TOTAL 35 OFFICES ALL OVER THE WORLD.
![Page 5: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/5.jpg)
JAMES ROBBINS FOUNDED THE ROBBINS COMPANY IN 1951 .
JAMES ROBBINS WAS THE TUNNEL MECHANIC.
ROBBINS BUILT THE FIRST TBM MITRY CONSTRUCTOR , WHO WERE WORKING FOR OHAE DAM SOUTH DAKOTA , USA .
HISTORY
![Page 6: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/6.jpg)
LOCATION ROBBINS OFFICES WORLDWIDE
![Page 7: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/7.jpg)
SEWER C PROJECT , USA NANJING METRO LINE , CHINA ENERGY PLANT PROJECT , USA MOSCOW METRO SYSTEM , RUSSIA SINGAPORE DOWN TOWN LINE ,
SINGAPORE
FEW ROBBINS CURRENT PROJECTS
![Page 8: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/8.jpg)
AMR-1/AMR-2 ( S.LB.C TUNNEL SCEME ) at Nalgonda district , Hyderabad ( A.P).
Parbati tunnel project for NHPC , Kullu , (H.P).
Chennai metro project , Chennai ,(T.N).
Katni tunnel project , katni (M.P)
PROJECTS IN INDIA
![Page 9: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/9.jpg)
LOCATION ON ROBBINS IN INDIA
![Page 10: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/10.jpg)
TRADITIONAL DRILL BLAST METHOD
ADVANTAGE : LOW COST DISADVANTAGE : UNSAFE
TUNNELING METHODS
![Page 11: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/11.jpg)
USING TUNNEL BORING MACHINE
ADVANTAGE : SAFE DISADVANTAGE : COSTLY
![Page 12: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/12.jpg)
MAIN BEAM TEAM
TYPES OF TUNNEL BORING MACHINE
![Page 13: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/13.jpg)
SINGLE SHIELD TBM
![Page 14: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/14.jpg)
DOUBLE SHIELD TBM
![Page 15: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/15.jpg)
DOUBLE SHIELDED TBM PARTS
![Page 16: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/16.jpg)
WORKING OF DOUBLE SHIELDED TBM
![Page 17: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/17.jpg)
THE ROBBINS COMPANY OFFICIAL DOCUMENTRY ,
SOLON , OHIO, UNITED STATES OF
AMERICA
PREFERENCE
![Page 18: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar](https://reader038.vdocuments.site/reader038/viewer/2022102806/557daa76d8b42a642d8b53a6/html5/thumbnails/18.jpg)