Download - Second Amendment to Cooling Water and Landfill Gas Sale and Purchase Agreements December 16, 2008
Second Amendment to Cooling Water Second Amendment to Cooling Water andand
Landfill Gas Sale and Purchase Landfill Gas Sale and PurchaseAgreementsAgreements
December 16, 2008December 16, 2008
History of Successful PartnershipsHistory of Successful Partnerships
IntroductionIntroduction Water InterconnectionsWater Interconnections Water ConservationWater Conservation Alternative Water SupplyAlternative Water Supply StormwaterStormwater Chilled WaterChilled Water Solar ArraySolar Array Reclaimed WaterReclaimed Water Landfill GasLandfill Gas
History of Successful PartnershipsHistory of Successful PartnershipsIntroductionIntroduction
Shared property Shared property lines lines
Partners since 1984Partners since 1984 Projects that benefit Projects that benefit
our community and our community and the environmentthe environment
History of Successful PartnershipsHistory of Successful PartnershipsWater InterconnectionsWater Interconnections
Eight system-wide Eight system-wide mutually beneficial mutually beneficial interconnectionsinterconnections EmergenciesEmergencies Temporary Temporary
wholesalewholesale System reliabilitySystem reliability
History of Successful PartnershipsHistory of Successful PartnershipsWater ConservationWater Conservation
School Education School Education ProgramsPrograms Water Color ProjectWater Color Project Calendar Art ContestCalendar Art Contest Rain Barrel ContestRain Barrel Contest
History of Successful PartnershipsHistory of Successful PartnershipsAlternative Water SupplyAlternative Water Supply
St. Johns River/Taylor St. Johns River/Taylor Creek Reservoir Water Creek Reservoir Water Supply ProjectSupply Project
Regional partnership Regional partnership since 2005since 2005
Working together on Working together on the Preliminary Design the Preliminary Design Report & Report & Environmental Environmental AssessmentAssessment
History of Successful PartnershipsHistory of Successful PartnershipsStormwaterStormwater
Use of stormwater Use of stormwater for cooling water for cooling water supplysupply
Built in 2005Built in 2005 1.47 billion gallons 1.47 billion gallons
delivered to datedelivered to date
History of Successful PartnershipsHistory of Successful PartnershipsChilled WaterChilled Water
Providing chilled water Providing chilled water for OCCC’s air-for OCCC’s air-conditioning system conditioning system since 2000since 2000
Chilled water Chilled water is a LEED certified is a LEED certified processprocess
History of Successful PartnershipsHistory of Successful PartnershipsSolar ArraySolar Array
Building solar array Building solar array system at the OCCCsystem at the OCCC
1 megawatt rooftop 1 megawatt rooftop photovoltaic systemphotovoltaic system
Largest solar array in Largest solar array in the southeast U.S.the southeast U.S.
History of Successful PartnershipsHistory of Successful PartnershipsReclaimed WaterReclaimed Water
Providing reclaimed Providing reclaimed water from EWRF water from EWRF for cooling water for cooling water since 1984since 1984
Delivering an Delivering an average of 11 mgdaverage of 11 mgd
Supports 1830 Supports 1830 mega watts of power mega watts of power generationgeneration
History of Successful PartnershipsHistory of Successful PartnershipsLandfill GasLandfill Gas
Providing landfill gas Providing landfill gas to Stanton Energy to Stanton Energy Center since 1998Center since 1998
Current 3% reduction Current 3% reduction in coal consumptionin coal consumption
Enough power for Enough power for 10,000 homes10,000 homes
Second Amendment to Cooling Second Amendment to Cooling Water Supply AgreementWater Supply Agreement
Increases reclaimed water commitment to Increases reclaimed water commitment to OUC to 14.7 mgd in addition to the landfill OUC to 14.7 mgd in addition to the landfill stormwaterstormwater
Water will continue to be delivered to OUC’s Water will continue to be delivered to OUC’s pond to be used for cooling water pond to be used for cooling water
OUC will continue to pay applicable rateOUC will continue to pay applicable rate Provides County option to deliver additional Provides County option to deliver additional
cooling water for all future unitscooling water for all future units
Landfill Gas Sale and Purchase Landfill Gas Sale and Purchase AgreementAgreement
New agreement directly with OUCNew agreement directly with OUC OUC will build/operate gas treatment systemOUC will build/operate gas treatment system System will be installed in landfill propertySystem will be installed in landfill property County will install/maintain gas collection systemCounty will install/maintain gas collection system 30 years with two 10-year renewals30 years with two 10-year renewals Estimated average revenue of $8 million per Estimated average revenue of $8 million per
year based on projected gas productionyear based on projected gas production
Action RequestedAction Requested
Approval of:Approval of:
SecondSecond Amendment to and Restatement of Amendment to and Restatement of the Substitute Agreement Between Orange the Substitute Agreement Between Orange County, Florida and Orlando Utilities County, Florida and Orlando Utilities Commission Relating to Cooling Water Commission Relating to Cooling Water SupplySupply
Landfill Gas Sale and Purchase Agreement Landfill Gas Sale and Purchase Agreement
between Orange County and Orlando between Orange County and Orlando Utilities Commission Utilities Commission