![Page 1: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/1.jpg)
RUBYANNA WASTEWATER TREATMENT PLANT PROJECT
Tom McLaughlin Group Manager Water and Wastewater
Bundaberg Regional Council
Selwyn McFaul Project Manager
McFaul & Co Engineers
![Page 2: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/2.jpg)
BACKGROUND • Council amalgamation • Flood resilience • Aging infrastructure • Discharge into middle tidal reaches of Burnett River • Bundaberg East and Bargara Coastal Region
Wastewater Treatment and Effluent Management Master Plan adopted in 2009
![Page 3: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/3.jpg)
RUBYANNA WWTP PROJECT ALL STAGES
![Page 4: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/4.jpg)
PROJECT OVERVIEW
• Community Reference Group • DA obtained in August 2013 • WWTP land acquired in November 2013 • Staged to suit development and capacity constraints
![Page 5: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/5.jpg)
STAGE 1 PROJECT OBJECTIVES
• Delivered within budget of $92M • Commissioning by 2017/18 • EA compliance – quality, odour, noise • Community acceptance
![Page 6: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/6.jpg)
![Page 7: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/7.jpg)
RUBYANNA WWTP PROJECT STAGE 1
![Page 8: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/8.jpg)
STAGE 1 SCOPE OF WORK
• PACKAGE 1 – PIPELINES – Raw sewage pumping station (RSPS) – 700 L/s ultimate
capacity – 600 mm diameter pressure main, 5.5 km long – 1200 mm diameter gravity outfall main, 3.6 km long
![Page 9: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/9.jpg)
STAGE 1 SCOPE OF WORK
• PACKAGE 2 – RUBYANNA WWTP – 50,000 EP Stage 1 capacity (90,000 EP ultimate
capacity) – Regional RSPS at Bundaberg East WWTP – Odour control
![Page 10: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/10.jpg)
STAGE 1 SCOPE OF WORK
• PACKAGE 3 – OUTFALL INTO BURNETT RIVER – 1200 mm diameter submerged outfall with
diffusers in the Burnett River
![Page 11: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/11.jpg)
DELIVERY SRATEGY PACKAGE 1 - PIPELINES
• Traditional Construct to Design • Design by BRC • Supply and construction by Contractor
![Page 12: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/12.jpg)
DELIVERY SRATEGY PACKAGE 2 - WWTP
• Design & Construct ECI • Shortlisting of Consortia • Short term Operations (2-3 years) being
considered • Reference Design prior to D&C Tendering • WorleyParsons reviewing process options
![Page 13: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/13.jpg)
DELIVERY SRATEGY PACKAGE 3 – SUBMARINE OUTFALL
• Design & Construct
![Page 14: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/14.jpg)
SCHEDULE PACKAGE 1 - PIPELINES
Feb 14 - Sep 14 Design (BRC) Oct 14 - Nov 14 Tender Period Dec 14 Contract Award Jan 15 - Dec 15 Construction
![Page 15: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/15.jpg)
SCHEDULE PACKAGE 2 - WWTP
Nov 13 - Jan 14 Process Review Jan 14 - Jun 14 Reference Concept Design Feb 14 - Jun 14 Shortlist D&C ECI Participants Jul 14 - April 15 D&C ECI Tender Period and Assessment May 15 Contract Award May 15 - May 17 Design and Construction Jun 17 - Nov 17 Commissioning and Proving
![Page 16: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/16.jpg)
SCHEDULE PACKAGE 3 – SUBMARINE OUTFALL
Sep 14 – Feb 15 Shortlist D&C Participants Mar 15 – Jul 15 D&C Tender Period and Assessment Aug 15 Contract Award Sep 16 – May 17 Construction
![Page 17: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/17.jpg)
BUDGET
• $92M total budget – Pipelines $22M – WWTP incl RSPS $67M – Outfall $3M
• Figures include contingencies and overheads
![Page 18: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/18.jpg)
EXCLUSIONS
• Decommissioning of Bundaberg East WWTP • Development Approvals, Permits etc • External reuse infrastructure • Community and stakeholder management
![Page 19: RUBYANNA WASTEWATER TREATMENT PLANT · PDF fileRUBYANNA WASTEWATER TREATMENT PLANT PROJECT ... – 1200 mm diameter gravity outfall main, ... SUBMARINE OUTFALL](https://reader030.vdocuments.site/reader030/viewer/2022021421/5aa68e547f8b9a2f048ed37f/html5/thumbnails/19.jpg)
QUESTIONS & ANSWERS