Transcript
Page 1: River Mersey Key - Home - FCC Environment · Pilot Beacon Bollard Foot Bridge M Bob's Bridge 6.4m 6.1m Moss Side k k n l l n) n n n Pond S ef LW Sand Sand Mud d Penketh Bank d SP

(Riding School)The Big Hand

ConifersThe

21

ViewSouth

Pen

deen

Rus

hlan

dR

eed

Ban

k

Pond

MOSS LANE

HouseHydraulic and Valve

LAPW

ING

LANE

MOO

RE LANE

CC

Def

Co Const ED & Wa rd Bdy

(Riding School)

The Big Hand

14.9m

GroundFootball

BM 6.02m

Wr T

6.4m

Posts

5.5m

S loping masonry

SM

Ship Guage Wire

Outfa ll

BM 8.07m

Post

8.5m

5.8m

S loping masonry

BM 7.54m

S loping masonry

7.9m

6.7m

Moore Bridge

13.7m

11.3m

Post

(Swing)

SiteLandfillArpley

Moor Lane Bridge

Dra in

Drain

Dra

in

Manchester Ship Canal

Drain

Pond

Pond

Dra

in

Pond

Drain

Pond

Pond

Drain

Drain

Pond

Drain

Pond

Drain Drain

Pond

(disused)

Dra in

Und

CCLW

CCLW

Boro Const and Ward Bdy

Sand

Mud

Mud

Mud

Mud

Mud

Riv

er M

erse

y

Mea n High Water

Mean High

Wate

r

Depot

Ri ver Mersey

Whittle Brook

E TL

T ow ing Path

Mud

S ank ey Val ley Park

Depot

SM

SM

Lagoon

(disused)

River Mersey

Sankey

Broo

k

St He lens Canal

Mea

n H igh

Wate

r

Whi tt le B

rook

Mean Hi gh W

ater

MO

ORE

LA

NE

BELLHO

US

E LANE

RUNCO RN ROAD

CS

1.22

m R

H

CS

CCS

Porch-houseFarm

BankMeadow

ViewCastle

Canal Farm

3

4

3319

Cockfight Cottages

MP .75

SP

MP

15.7

5

Car

avan

Par

k

Mea

dow

Ban

k

SP

SP

ETL

20.7m

Bridge

18.3m

Acton Grange

19.2m

Disman

tled R

ailway

BM 24.02m

Track

27.1m

24.1m

Issues

Drain

Drain

Pond

Drain

Pond

Pond

BELLHO

US

E LANE

MOORE LANE

CC

ED a nd Ward Bdy

Def

Def

CCS

CCS

CS

CP and ED

Bdy

Warehouse

Warehouse

HousePump

StationPumping

House

E l Sub Sta

Valve

Valve House

E l Su b Sta

Tank

Sludge Tanks

Filter Beds

Filter Beds

Tank

Bellhouse Farm

Depot

Bell House

ViaductActon Grange

Navigation Light

MP .5

SM

SM

BM 9.79m

ETL

13.7m

Tower

(Fixed White)

(Fixed Amber)

L ighting

Navigation Light

Acton Grange Wharf

Trave llin g Crane

Tower

Navigation Light

MP

(Fixed White)

MPLighting

13.7m

Post

(Fixed Amber)Navigation Light

TankOutfa llTank

MP

Navigation Light

Tra ck

8.2m

ETL

Nursery

MP

Dismantled R

ailway

MP .25

Sewage Works

JunctionActon Grange

El Sub Sta

21.0m

PathMP 16

MP 180

MP .25

Sand Pit

Birch Wood

Tank

13.7m

Post

Outfa ll

MP

(Fixe d Ambe r)

Manchester Ship Canal

Pond

Dra in

Drain

Runcorn and

Pond

Latchford Canal (dis)

B oro Co nst and Ward Bdy

Boro

Con

st, E

D an

d W

ard

Bdy

CCLW

Trac

k

Sand Pit

Moss Wood

Mud

Tank

(disuse d)

Mud

Mud

Sewage Works

Path (um)

Mud

Mud

Mud

Bank Quay Reach

Mean High Water

Dra in

L atchford CanalRuncorn and

Mean High Water

Dra

in

Mersey

Dra

in

River

M ud

S ite

Mud

FB

FB

Househol d Waste

FB

FB

Mud

Mud

Chy

Mud

Sewage Works

Water

Water

Water

Drain

M HW

Water

Water

Water

Water

Sankey Brook

Water

Drai

n

Mea

n Hi g

h Wate

r

D rain

Mean H

i gh Water

Drain

F ORREST WAY

B ARNA RD S TREET

El Sub Sta

Track

Indus tria l Es tateGatewarth

Rive

r Mer

sey

Drain

Drain

D rain

Mea

n Hi

gh W

ater

S ankey

Broo

k

MILL LA

NE

RUNCORN ROAD

A 56

CottagesCockfight

CottagesUnderbridge

2

1

BM 20.49m

Counc

il Yard

Bridge

22.6m

Thomason's

20.47mBM

25.3m

BM

Higher Walton

19.80m

Bridge

20.4m

Crane

GardensWalton Hall

Walton BridgeMS

BM 27.35m

Issues

Sinks

Bridgewater Canal

Grange Mi ll

M il l Lane

FarmGrange Green

House

Cot tages

Pat h (um)

Track

D ra in

Drain

CH

EST

ER

ROAD

CHESTER R

OAD

CHESTER N

EW RO

AD

OLD CHE

STE

R ROAD

S t J ohn 's Church

V icarage

T he Wal ton Arms

PO

Club House

BM 24.50m

24.4m

Churc h Park

BM 24.00m

BM 25.10m

23.5m Higher Walton

23.8m

Walton Hall GardensGol f Course

23.2m

Dra

in

Bridgewat e

r Canal

Works

Track

Dis mant le

d Rail

way

ETL

T ra ck

S and Pit

A cton Grange Viaduct

8.5m

Manchester Ship Canal

SM

SM

SM

L T wr

SM

SM

SM

SM

Works

Manchester Ship Canal

BM 9.24m

7.0m

7.0m

Sand Pit

Nature Reserve

P ath (um)

Moss Wood

Pond

Dra in

Drain

Dra i

n

Runcorn and L atchfo rd Canal (disused)

L T wr

ETL

New Junction

Wal ton

Works

T rack

Nature Reserve

Junction7.3m

E TL

Morley Common

Old

Wal ton

Pond

Drain

Runcorn and Latch ford Canal

Drain

(disused)

Drain

Runcorn an d Latchford Canal

Drain

MHWR

iver

Mer

sey

Drain

Drain

EASTFORD ROAD

7.42mBM

found AD 1931

P ath

Dug-out Canoe

Landi ng Stage

M ud

Mud

P ath

Path

Mud

M ud

ETL

S torage Tanks

T rack

7.6m

BM 6.92m

Track

Mud

M ud

6.4m

River Mersey

Mean H

i gh Water

Mean Hi gh Water

Drain

Dra in

M ud

Mud

ETL

Mud

Drain

River M

erse

y

Drain

Mea

n H

i gh W

ater

Mea

n Hi

g h W

ater

Works

Home

Cats and Dogs

Track

Mud

Landi ng Stage

Path

Mean H

i gh Water

River M

ersey

Mean Hi gh W

ater

CC

CP, ED and Ward Bdy

Def

(disused)

Jetty

Jetty

Bollards

Jetty

Jetty

Mud

Mud

con

LAPW

ING

LAN

E

MOSS SIDE LANE

CCCP an d ED Bdy

Def

CS

Moss Side Farm

Moss Side Farm Cottages

Canal Cottages

1

6.1m

Sand Pit

Pilo t BeaconBollard

Foot Bridge

SM

Bob's Bridge

6.4m

6.1m

SideMoss

Track

Tra

ck

Dra

in

Runcorn and Latchford Canal

Manchester Ship Canal

Drain

(dis)

Dra in

Dra in

Drain

Pond

CS

Def

CCLW

Sand

Sand

Mud

Mud

Penketh Bank

Mud

SP

MudMud

Track

Tra ck

Drain

Drain

Dra

in

Dra in

Drain

Penk

eth

Broo

k

Drain

Sinks

Pond

r Mersey

M ANST ON ROAD

HA

LL

OA K ROAD

WELL LANE

DR

UR

IDG

E DRIVE

ELM

RD

MAP

LE CRE

SCENT

MAN

STON

ROA

D

WO

OD

LEY

FOL

D

MAP

LE CRE

SCENT

THO

RN CLOSE

OAK

MERE

DRIVE

NO

OK

HAM

BLE DRIVE

H AM BLE DRIVE

STAN

STEAD AVENUE

ow View

HallPenketh

BM 7.66m

7.3m

E TL

Towing Path

6.7m

BM 7.88m

7.0m

Track

Pa th

S ank ey Valley Park

T enni s Court

10.1m

6.4m

D rain

B rook

(di sused)

St Helens Cana

l

Penketh

Pond

D rainPond

Pond

Drain

Drain

Dra in

Moss Lane Farm

Dra in

Pond

Dra in

LAPWING LANE

CS

TCB

Wr T

Wr T

Promenade Caravan Park

Post

(Fixed Amber)Navigation Light

(Fixed White)Navigation Light

MP

6.1m

S loping masonry

SM

Sand Pit

Runcorn and Latchford Canal

Drain

Dra in

Drain

Drain

Dra in

Def

CCLW

CS

Mud

Mud

Sand

Refuse Tip

Mud

Penketh Bank

Richmond Bank

Penk

eth

Reac

h

Mea

n Hi

gh W

ater

KIR

KWALL DR

IVE

WARTON CLOSE

CLI FFORD ROAD

T HORNCLO

SE

GRA

NGE DRIVE

HAM

BLE DRIVE

H AM BLE DRIVE

S TAN STE AD AVENUE

E TL

Refuse Tip

T ow ing Path S ank ey Val ley Park

Drain

Dra in

Whi tt le B

rook

S t He le ns CanalD rain

D rain

385000mN

357000mE

385500mN

357000mE

A

A'

BB

'

40

3836

3432 30 28 26 24 22 20 18 16

14

12

4038

36

34

3230

28

26

24

22

20

18

16

14

1210

3634

32

3028

26

2422

2018

1614

1210

10 0812

10

10

p l a n n i n g e n v i r o n m e n t d e s i g n

rev:

status:

drawn by:date:

drawing title:

project:

client:

scale(s):

drawing number:

Chester Office: Well House Barns

BrettonChesterCH4 0DH

l Revision History l Date

This drawing is the copyright of AXIS P.E.D Limited and may not be loaned, copied or reproduced in any way -or used for any offer, quote, tender or construction purposes without written consent of the company to do so

Follow any figured dimensions - do not scale. IF IN DOUBT ASK.

checked:

axisSouth Manchester Office:

Camellia House76 Water Lane

WilmslowSK9 5BB

0844 8700 007 - www.axisped.co.uk

Jan 2015Revised to reflect amended schemeA

A

-

1:5000@A1

1439-01-04bAH/ARSM

October 2013

Pre-Settlement Restoration Contours

Extension of Operational LifeArpley Landfill Site

FCC

Arpley Landfill Site Boundary

Moore Nature Reserve

Proposed Pre-Settlement Restoration Contours (at 2m intervals)

Proposed Excavation Area Contours (at 2m intervals)

Proposed Reprofiling Area

Key:

Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright & database right 2013. All rights reserved. Ordnance Survey Licence number AL 100036678.

Restored Area: Settlement underway (contours at 2m intervals)

NOTE:

The proposed pre-settlement restoration contours shown are the maximum. In reality, by the time the capping and restoration materials have been placed, the degradation of the waste and compaction due to the weight of soils and tracking by heavy machinery will result in the height of the pre-settlement restored landfill being lower than maximum pre-settlement waste levels.

Area to be excavated only if required

Top Related