DISTRIBUTIONPIPELINE
RISING MAIN
BORE HOLE
TANKS AND WATER PONTS
NAKURUTO DIMOODY WATERSUPPLY PROJECT
OSHEET 1 OF 1
PROJECT LAYOUT
NAKURUTO / 102
N
PV PV
PV PV
4.4
4.9
R5.0
12.0
18.0
11.0
2.0
3.0
4.0
40.0
30.0
7.0
30.0
7.7
8.5
6.0
6.8
6.0
8.0
6.0
3.8
2.5
1.8
3.5
COUNTY GOVERNMENT OF TAITA TAVETA
NAIROBI, KENYA
CLIENT
Drg. No.Sheet No.
SURVEYED
CHECKEDAPPROVED
BYBYBYBYBY
REVISIONS
SURVEY AND DESIGN OF FOUR WATER SUPPLY SYSTEMS IN KILIFI AND TAITA TAVETA COUNTIES
DATE DESCRIPTION DESIGNEDDRAWN
AND GENERAL ARRANGEMENT
WMCL-KRC-BTS-01
NAKURUTO WATER SUPPLY
Date : 1 of 2
KENYA RED CROSS SOCIETY
P.O. BOX 40712 - 00100
P.O. Box 21714-00505,
Corner Ngong/Ndemi Road,
Nairobi.
Wanjohi Mutonyi Consult Ltd.,
CONSULTING ENGINEERS
Tel:(254) -020 3876690/1/2
Email:[email protected]
BORE HOLE SITE LAYOUT
JAN 2016
P.K.MD.M.MG.GD.M.MP.M.K
JAN 2016 FIRST ISSUE
PROJECT
DRG. No.
Date:
Drawn:
Checked:
Approved:
Scale:
DRG TITLE
Cad Filename
JOB No.
REV
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETYP.O.BOX 40712-00100
NAIROBI
Designed
OSHEET 1 OF 1
CH.0+000 - 0+330
RISING MAINLINE PROFILE
As shown
ENG.B.S
ENG.B.S
CK.L
C.K.L
APRIL 2020
NAKURUTO/301
PROJECT
DRG. No.
Date:
Drawn:
Checked:
Approved:
Scale:
DRG TITLE
Cad Filename
JOB No.
REV
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETYP.O.BOX 40712-00100
NAIROBI
Designed
OSHEET 1 OF 5
CH.0+000 - 6+592
MALKLORITI MAINLINE PROFILE
As shown
ENG. SB
ENG. S.B
CKL
C.K.L
MARCH 2020
NAKURUTO/302
PROJECT
DRG. No.
Date:
Drawn:
Checked:
Approved:
Scale:
DRG TITLE
Cad Filename
JOB No.
REV
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETYP.O.BOX 40712-00100
NAIROBI
Designed
OSHEET 2 OF 6
CH.0+000 - 1+400
MALKLORITI MAINLINE PROFILE
As shown
ENG. SB
ENG. S.B
CKL
C.K.L
MARCH 2020
NAKURUTO/302
PROJECT
DRG. No.
Date:
Drawn:
Checked:
Approved:
Scale:
DRG TITLE
Cad Filename
JOB No.
REV
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETYP.O.BOX 40712-00100
NAIROBI
Designed
OSHEET 3 OF 6
CH.1+400 - 2+800
MALKLORITI MAINLINE PROFILE
As shown
ENG. SB
ENG. S.B
CKL
C.K.L
MARCH 2020
NAKURUTO/302
PROJECT
DRG. No.
Date:
Drawn:
Checked:
Approved:
Scale:
DRG TITLE
Cad Filename
JOB No.
REV
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETYP.O.BOX 40712-00100
NAIROBI
Designed
OSHEET 4 OF 6
CH.2+800 - 4+200
MALKLORITI MAINLINE PROFILE
As shown
ENG. SB
ENG. S.B
CKL
C.K.L
MARCH 2020
NAKURUTO/302
PROJECT
DRG. No.
Date:
Drawn:
Checked:
Approved:
Scale:
DRG TITLE
Cad Filename
JOB No.
REV
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETYP.O.BOX 40712-00100
NAIROBI
Designed
OSHEET 5 OF 6
CH.4+200 - 5+600
MALKLORITI MAINLINE PROFILE
As shown
ENG. SB
ENG. S.B
CKL
C.K.L
MARCH 2020
NAKURUTO/302
PROJECT
DRG. No.
Date:
Drawn:
Checked:
Approved:
Scale:
DRG TITLE
Cad Filename
JOB No.
REV
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETYP.O.BOX 40712-00100
NAIROBI
Designed
OSHEET 6 OF 6
CH.5+600 - 6+972
MALKLORITI MAINLINE PROFILE
As shown
ENG. SB
ENG. S.B
CKL
C.K.L
MARCH 2020
NAKURUTO/302
PROJECT
DRG. No.
Date:
Drawn:
Checked:
Approved:
Scale:
DRG TITLE
Cad Filename
JOB No.
REV
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETYP.O.BOX 40712-00100
NAIROBI
Designed
OSHEET 1 OF 1
CH.0+000 - 2+030.08
TANK SEVEN MAINLINE PROFILE
As shown
ENG. S.B
ENG. S.B
CKL
C.K.L
MARCH 2020
NAKURUTO/303
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETY
P.O.BOX 40712-00100
NAIROBI
OSHEET 1 OF 1
SECTION VALVES CHAMBER DETAILS
NAKURUTO/307
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETY
P.O.BOX 40712-00100
NAIROBI
OSHEET 1 OF 1
AIR VALVE
NAKURUTO/401
KENYA RED CROSS SOCIETYP.O.BOX 40712-00100
NAIROBI
NAKURUTO DIMOODY WATERSUPPLY PROJECT
OSHEET 1 OF 1
WASHOUT DETAILS
NAKURUTO/402
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETY
P.O.BOX 40712-00100
NAIROBI
OSHEET 1 OF 1
AND CROSSING DETAILS
TYPICAL RIVER & GULLEY
NAKURUTO/403
NAKURUTO DIMOODY WATERSUPPLY PROJECT
KENYA RED CROSS SOCIETY
P.O.BOX 40712-00100
NAIROBI
OSHEET 1 OF 1
PIPE TRENCH BACKFILLING DETAILS
NAKURUTO/306