-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
1/39
London Legacy deveLopment corporation
regenerationdelivery programme
report 3 - appendix 1pubLic item 6 / 19 march 2013
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
2/39
London Legacy deveLopment and regeneration pLan
Summary
Lodo Legc Deelopet Copoto (te Legc Copoto) ee etled to poote ddele pcl, ocl, ecooc d eoetl egeeto te Olpc P d odg e, ptcl xg te legc o te Olpc d Plpc Ge, ecg g-qlt tle
deelopet d etet, eg te log-te cce o te clte d et t t dect cotold ppotg d pootg te o coegece.
Follog te cce o te 2012 Ge, te Legc Copoto o oced o e-opeg d opetg ccel p, eg e deelopet t t ext to cete get plce, d ecg oppotted cge o people lg te e.
Te Legc Copoto to e te cce o Qee Elzet Olpc P pgod o deegeeto, dg o t expeece d detdg o te locl e, t cotet to ptepog, d t cedle et e to cete te codto o cce. To cee t ojecte, te Legc
Copoto gct et t te P, oe cptl dg, ece d te lt to g ptetogete, ell plg poe t t od.
T eg docet et ot t te Legc Copoto dog to dele t coe ojecte o egeeto,te cotext t c t opetg, d te potce o jo, got, plceg, cot dcoectt to ceg t ojecte. Te Legc Copoto ledg o ppotg poject o te o jdgeet ot te delelt, te cotto tod ttegc ojecte, d te gec ooppott tt te oe.
T docet ot te Legc Copoto Locl Pl, c ll et ot ld e d to plg polce
o te e t te Copoto od. T poge doe ot ee to et polc o te Locl Pl delted docet, c ll e deeloped tog ol plc poce dg te coe o 2013 d 2014.
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
3/39
3
contentS
1. introduction
1.1. LOnDOns LEGaCy
1.2. CEnTraL LOnDOns FuTurE1.3. LOnDOn LEGaCy DEvELOPmEnT COrPOraTiOn
2. park opening, deveLopment and regeneration
3. regeneration programme
3.1. PrinCiPLEs3.2. PriOriTiEs3.3. JObs
3.4. GrOwTh3.5. PLaCEmakinG3.6. COmmuniTy3.7. COnnECTiviTy
4. Legacy pLaces and connections
5. objectives and priority projects
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
4/39
London Legacy regeneration strategy
1.0 introduction
1.1 L l
Te Lodo 2012 Olpc d Plpc Ge ee qled cce. not ol dd Lodo te
old-etg potg peoce, t te cptl edeed d pdted t ccte glol ct, tEt Lodo ocg t tlt, det d et to te old.
Lodo Legc Deelopet Copoto to t d ld o t tc ecod o cce, to eett te e od Qee Elzet Olpc P ll t potetl tg exteo to te et o get old ct, c oe eced ocl d ecooc oppotte to cet d te edet,d ecoe exctg detto o Lodoe. i dog o, te Legc Copoto ll ld o tee c to, e te ot o te ll, pto d et o locl people, d dele ltgtoto o locl cote.
Te Legc Copoto ll lo ee to ppot te gol o Coegece, c et ot te to tt ttwt 20 e, te cote o ot te 2012 Ge ll e te e ocl d ecooc cce
te ego co Lodo. (sttegc regeeto Feo, 2010).Coegece dopted te Goeet p legc ojecte noee 2010. Te CoegeceFeo d acto Pl 2012-15 (2011) et ot o te Gete Lodo atot (GLa), hot boog dote pte, cldg te Olpc P Legc Cop (te Lodo Legc Deelopet Copotopedeceo), geed to o tod Coegece t oc o tee tee:
Cetg elt d edcg poet
sppotg elte letle
Deelopg ccel egoood
1.2 cl L
Te 2012 Ge lo deotted tt teetd got o cetl Lodo, ceg oe tt e go t te ttep o deelopet Docld, eced sttod, gg Qee ElzetOlpc P to te et o Lodo.m eet oge, e leded eto sttod, pep o tet te, cedle plce to do e.
Lodoe, ele, e plce tole, o d ejo te le.
Te P le t te et o Lodogot oog (bg d Dge,Geec, hce, ne, Toe hlet, wlt Foet), oe to 1.3 llo people d te lc oLodo te deelopet. i te lt decde oe o o ll e jo Lodo, d 10 pe cet o tecptl totl eploet, ee geeted ee. it oect tt te ext 20 e te e ll dd ext7 llo ll to Lodo ecoo d el dole te 200,000 jo tt e led te e.
ie Et Lodo led oe o te cptl ot exctg e, d get o cete ee o, tecolog d t. a Lodo oe etd, te e od te P ll o dge eteeLodo peet d t te. it ee Lodo ot tee eed eet Lodo getet oppotte te od o te Lodo Pl (2011) t Lodo ot pott egeeto poject o te ext 25 e.
London Moving East
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
5/39
5
Legacy Communities Scheme
2030 Illustrative Masterplan
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
6/39
London Legacy deveLopment and regeneration pLan
1.3 L L dl c
Te mo o Lodo deco to etl mol deelopet copoto t e o opeto
extedg eod Qee Elzet Olpc P d et cldg plg polc, deelopetgeet d egeeto eect log-te cotet to te e.
t m f L c llw1 :
To poote d dele pcl, ocl, ecooc d eoetl egeeto te Olpc P dodg e, ptcl xg te legc o te Olpc d Plpc Ge, ecgg-qlt tle deelopet d etet, eg te log-te cce o te clte d ett t dect cotol d ppotg d pootg te o coegece.
wle te Legc Copoto pecc poe eltg to deed geogpcl e, t ee etled
te mo o Lodo to poote ode poge o egeeto d cge et Lodo, tdeg leel o poe d ece t deet ptl cle:
Qee Elzet Olpc P, ee te Legc Copoto te jo ldoe d te ledegeeto gec, d pecc plg d ote poe.
WithintheLegacyCorporationarea,butoutsidethePark,wheretheCorporationisaveryminor ldoe, t tll te led egeeto gec, d pecc plg d ote poe.
OutsidetheLegacyCorporationarea,wheretheLegacyCorporationownsnoland,isnotthelead egeeto gec d o poe, t doe e teet ttegc pte, d ll eeto ee tt t ppe de te od eet cote otde (d ce e).
t L c p, pl pl l :
PARK:TooperateasuccessfulandaccessibleParkandworld-classsportingvenues,oeringfacilitiesforg-peoce d cot ptcpto, etcg to ttcto, d poge opotg, cltl d cot eet tt ll cote to d cod to sttod;
PLACE:TocreateoneofLondonsmostdynamicurbandistricts,attractinginvestmentfromacrossLondond eod, ecog locto o coce o cet edet d e l, ctg lco elt ceto d etepeep, d lg Qee Elzet Olpc P ettet odg egoood;
PEOPLE:Tocreatelocalopportunitiesandtransformationalchange,topromoteregenerationand
coegece o Et Lodo, d to ee le o oe o txpe
1Mayor of Londons proposals for a Mayoral Development Corporation, February 2011
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
7/39
7
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
8/39
London Legacy deveLopment and regeneration pLan
Oe te ext tee e, tee copote poge ll e cetl to te Legc Copoto : opegd opetg Qee Elzet Olpc P; gg od te deelopet o e egoood odte P; d deelopg d deleg te poge o log-te egeeto.
Tee tee poge tt e detl to cce. sccel e-opeg ll t oet,ece eptto d ld le te log te, d el ette deelopet ll ld p to 7,000 eoe d pce o tod oe jo od te P d ee. bt tee poge eed to ecopleeted eecte egeeto poge: te P d t coecl, eploet d leeoppotte - t oge tog l t locl cote to e coegece elt.
t p o pl l:
Te P Toto poce - cl, c, cl - c eg edtel te te ed ote Plpc Ge d ll cle te Ge-te oel cldg tepo ee, l dod; coect te P t e od, ccle d pedet pt tt ttc co te te d to teodg e; d coplete peet ee, dge d pld o te legc e
re-opeg te P tel, tge dg 2013 d 2014, t p , plgod d eldcpg deged to ppot poge o eet d to ttcto tt ll d locl,etopolt, tol d tetol to
re-lcg peet ee (te std, te aqtc Cete, te velodoe, te Coppe box, teacelomtl Ot) t tet d opeto plcesccel dele o t poge ll cetete odto o ttc plce, o le ceto, o poel d, d o log-te coteet.
sccel dele o t poge ll cete te odto o ttc plce, o le ceto, o
poel d, d o log-te cot eet.
al p , dl p l w:
Pl o te ceto o e e egoood te P oe te ext 20 e, t p to 7,000 eoe d ppotg ocl tcte, ee ppoed Je 2012;
Te t oe te Co mo egoood ll e de cotcto o 2014;
ite e ll e ed to g le to loge-te deelopet plot; d
Te Pe d bodct cete ll e e-lced jo eploet , t bT spot coed t co tet.
Te regeeto Poge o dge etee te P, te ceto o e plce, d te pojecttt ll dele egeeto d tote cge o locl people. T docet et ot te pcple,tteg d pote tt dee t poge, d te ctcl poject tt e cetl eg ped.
2.0 park opening, development and regeneration
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
9/39
9
South Park Plaza - completed for Park Opening
Chobham Manor - construction to commence 2013
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
10/39
London Legacy deveLopment and regeneration pLan
3.1 pl
Te Legc Copoto regeeto Poge oded o extee expeece o Et Lodo, ot
t te Legc Copoto d og t pte. Qee Elzet Olpc P t te et o te LegcCopoto e, c o te ote pt o te Loe Le vlle, c t oe o te ctcl clteo got e Et Lodo d te cptl ole. Te Legc Copoto ll opete t ec o teeptl leel.
O eql potce detdg o Et Lodoe te eed, pto d te cltl cett t cote to te. Et Lodo to ee oe o oto, e-eto d cge, dte e cetl oe to oe o te oget d ot dee poplto Lodo o te uk. bt teecote cote to ce pole, t pooe edctol, eploet d elt otcoe, oeog codto, d ge ce leel t te Lodo ege.
Te Lodo 2012 Ge e let te Legc Copoto t ele et o et d oppotte,
cldg P d ee tt ee deged to e ll cle to ll ecto o te cot, d coted te ot ccele Plpc Ge ee. Te Legc Copoto cotted to cg teepcple od, to ee tt te legc o te Plpc Ge le o te deelopet o tlcle d ccele plce.
wle te Legc Copoto dg o ot-te etet e-opeg te P, t ppoc to deegeeto poject ll e to e c oe oppottc d etepeel, epecll ge te teecl eoet. Te Legc Copoto ll cee t ojecte g ece d ledep, g et e o lle dg d ecg e dg, d cetg plg polc eo ddeco-g poce tt coe clt d exlt.
wle o et e cocetted te P, o eectee ll e xed e opete ptep, pt o ode llce o et Lodo. Ee ooltc dele o t et ele o te LegcCopoto, t old e tel o te ge eoce tt pte c g to te tle. a locled gec,ooted etopolt goeet, te Legc Copoto c elp to coect locl eed t Lodo-deoppott, o tt e et Lodo c eet o jot og t te ofce o te mo o Lodo, dote pt o te GLa Gop, ell t egog oog, locl cote, d te ee tte de et Lodo te oe.
Fll, te Legc Copoto ll ee, d ee ece pdte, te lle ttegc o d plgpolc tt ee peeted docet le te sttegc regeeto Feo, te Olpc Legcsppleet Plg Gdce, d te o tepl, coe ttege d e cto pl tt eee peped d dopted te ot oog d te pte. we ll eect te ed o tt tod o o etled d ll o to dele te pot poject tt e ee deted
3.2 s p
i te lgt o tee pcple, te Legc Copoto egeeto tteg to e te ot o QeeElzet Olpc P edeelopet to detto d tg dtct, to o tepgod o d dg oce ed poge o ged cge tt ll ot ppotcoegece locll, d te Lodo cce o glol tge.
j o locl people t te P, ee d e opce, d tog pootg d cptlgo te etepeel clte o te locl cote
gw ppotg etepeep, cetg opce o ee, oteg te d ge
edcto clte tt c ote oto d got,
pl cetg plce tt o, cldg og deelopet tt eet locl d Lodo-de eed d ccoodte dee d cgg poplto
3.0 the regeneration programme
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
11/39
11
c g e tt locl people (cldgtoe o deped cote) e te oppottd cpct to eet o eploet, e d
lee oppotte, d elg locl people to g leto te e pce d egoood, to ct te log-te gto o t cce
c tegteg d extedg te pcld ocl l etee Qee Elzet Olpc P,ote jo deelopet locto d odgcote, d oecog pcl e ttcetl epte cote, d t cce toeploet, e d lee oppotte
Ge coted dg, ptcll te el e, e
ll pe poject tt et t tee pote, t ll lo ctl to eze oppotte te e.
3.3 j
Te Lodo oog o bg d Dge, Geec,hce, ne, Toe hlet d wlt Foet (LodoGot boog) e te e e cete o Lodo. Tee cope 20,500 ecte o ld d oe to 1.3 llopeople tee te te ze o te ct o mcete.
it oect tt te ext 20 e te e ll dd ext
7 llo ll to Lodo ecoo d el dole te200,000 jo led ee. Oe eo o Lodo cete ogt og et te 2012 Ge, c e deleed pto 50 e o egeeto d tcte etet de decde.
3.4 gw
Lodo Got boog pode lled oppotte oe d eegg tecologe. Te e oe lge e og qlt ld, extee tpot d tlte tcte,d pdl-gog toc o e ldg. i ddto, te
e ll e ogt te t Lodo to eet o bT ollot o pe-t odd.
Te e d od Qee Elzet Olpc P ogg e dett o ge edcto d eecexcellece. Te jot bec/uet o Et Lodo cp el coplete sttod, d uet College Lodo dLogoog uet e to ote ttto expeg tog teet etlg peece te e.
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
12/39
London Legacy deveLopment and regeneration pLan
Te etepeel te o te e od Qee Elzet Olpc P e pedcto o got e
peclte, t e e o ecooc got e lel to clde:
Cle tec dte, ed o te expo o eoetl tecologe d te gee etepe zoett tg dtge o lge pool o egeeg tlet, gog ecclg dt, old-ledgeec o te edcto d epoceg d excellet popet opto.
spot d edcl tecolog ee: ldg o te potg legc o te P, d te eecexpete te gog cdec clte t pt o et Lodo.
Dgtl dte: te Tec Ct clte od Old steet copleeted ote cee c teedeelopet o te Pe d bodct Cete eploet , t clte o tecolog-ed d odct ee.
Cete dte: te Got boog ot te lget e o tt d t ogto lg
d og togete o cptl ct te old. Oe ee e jo te cete dte.soedtc, hoxto, sptleld, hce wc d F ild e tg t cete ee, ldgo te g cocetto o dege, tt d gllee, d e locto e eegg too.
Te Legc Copoto ll o t d etet gece d locl tote to ee tt ee ll ecto c d e to locte d pope et Lodo ete Qee Elzet Olpc P, teLegc Copoto e o odg egoood. it ll lo ee to ee tt l c e oedetee lle etepeel ee tt te oot t e, t te jo copote ete ttcooe to locte te Pe d bodct Cete, Te itetol Qte, weteld sttod Ct d otelocl e cete.
3.5 pl
Qee Elzet Olpc P ll pode qe d pg plce o eet d lee ctte, d lle jo locl, tol d tetol cete o pot d clte, ell podg oe o le,d o got d jo. it ll e exctg e oe o e, lee d lg, gg te et oLodo togete oe plce.
Te P qe edoet o tcte d tl ete, podg toc oppott tocete e etopolt cete te et o Et Lodo. Te legc pl ld o cog tdto doto to cete exctg e dtct tt tegte ll to Et Lodo, d poote egeeto dcoegece.
Te e dtct ll pode:
extee l og, cetg coee e cote ped Lodo egoood oteced oe d e, te t g-e deelopet;
ge-det xed-e deelopet elect locto, cloel led to te etl, coecl d plctpot clte oeed sttod Ct;
tog coecto to Et Lodo cote, ed o e dge, od, lg d cclg ote,d o ctel opeg te P p to locl edet;
gl cte eto o te, p d plc pce, cog te tl etge o te Levlle t cte pogg o potg, cltl d ote eet;
tetol to ttcto tt o te o gog to ecoo d ee te Olpc P
copellg d popl detto;
hg qlt potg ee tt g le to plc pce d eet o gl pogedppoc to eet, ecopg eetg o tetol copetto to g-oot deelopetpoject;
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
13/39
13
e opce d eploet oppotte t cce ot to plc tpot d to qepld ettg.
Qee Elzet Olpc P le t te et o coplex e. it ot oe plce, t dtct togelted plce. Et Lodo o o t det d o te oppotte t poded to geeto oLodoe. it egoood e dee tee people, d ett to ple ccteto.
Te P to eect t det, ot te et o t plc pce, og tpe d ctte, d te ceto o e e egoood tt eect d e coed te cctetc o odg e.
3.6 c
Depte te ecooc cce toe locll, Qee Elzet Olpc P oe o te cot otdeped e. i te pt, te deped cote ttg logde tee ecooc cce toe e otl eetted o te ttl - o exple tog cce to oe, egl jo,tg o ge leel o coe d ddtge ee ptcll cocetted og oe gop.
Te Olpc bd locted te Le vlle d t sttod peccll to lee plc d pte etetto oe o Lodo ot deped e. T o ccdet, d te Legc Copoto cotted tog e tt locl people c eet o t etet.
Te egeeto poge ll teeoe ppot te ecooc deelopet o te Legc Copoto ed te uk e ecooc poeoe. it ll lo dde oe o te log tdg e o ocl decooc depto to e od egog cote pt o te Coegece ged.
3.7 c
sttod oe o te et eed locto Lodo, t oe t 60 t ee o to cetl Lodo. it lo eed g peed l, tog tetol t do ot et top t sttod itetol stto, dll e Col stto o 2018.
wt Qee Elzet Olpc P, coectt d peelt eg dtcll poed. 30 edge o l co te coplex e o cl d te tt o te et o te Loe Le vlle,d te poeet te qlt tt ee ceed llo tee cet tee to o e eto o lee, tpot d odet.
Coectt e cllege oee, t te a12 og e etee te Legc Copoto ed cetl Lodo, od tt e d o pedet d cclt to gte, d t te cotg eed oe cog to ge et Lodo te qlt o tcte ejoed te et.
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
14/39
London Legacy deveLopment and regeneration pLan
4.0 legacy placeS
1
2
3
4
LLDC Sub-Areas
Te Legc Copoto e cot lttde o plce o dtct ccte, t o ee o decpto dl ee -dded to o -e. Tee -e ee to cpte ecogle plce toe ed ccte d e, ecopg ot e deelopet t Qee Elzet Olpc P
d ge e otde t, ell cog oog ode. Te e deed to ppot dele dplg, d to ele tegto d coecto o e tt e ee epted, tot deg tetegt o extg plce.
1. Co
2. sttod
3. bole bo & Pddg mll
4 hce wc F ild
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
15/39
15
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
16/39
London Legacy deveLopment and regeneration pLan
Co, c ecope pt o te Lodo oog o ne d wlt Foet, clde te d-e loc o Et vllge (te oe tlete llge), l og, pecel pld, pl pce d geo potg clte, g te tto etee te teel poplted d ctted e o sttod Ct
d te ote Olpc P, te tdtol teced og egoood o Leto d te otecotto o te Le vlle.
c m
Co mo locted etee Et vllge d te velop, d logde te ote pld. Tee deelopet, c ll e te t pe o og to e eleed te Et vllge, to cete egoood o l oe ee de tee-led ee teect t tte teet d e, oeg eoet o qet teced oe d egoood qe.
Te e cote te teet gd o Et vllge, podg cott o g d e codo. Te cleo deelopet le oetl, oee, t eltel lge loc o teet d edgg te p,
copleeted lle cle deelopet o o teet d e, cldg ge o l ogtpologe.
c F
Te elee o oe dtl ld ll cltte deelopet o e l-oced edetlegoood to te ot o sttod metopolt To Cete. Te e ll l te pedotledetl ote zoe o sttod Ct, cldg Et vllge, d te extg egoood to te et sot Leto d sttod ne To. Te egoood teded to clde od 1,100 e edetlt, ppoted coecl d cot clte..
e m
Eto mo ll pode eced cete o pot cldg exle 5,000 et oce td, doote cete t cgg clte, ell ote cot potg d lee clte, c e--deptce.
t n p
Te deg o te pld ll coe pcteqe e lle e d qe e o o-det textee, plcl-ccele gee pce d ote.
Te not P deged to ppot cte lee e d l-oeted ete c pl e, etldd te edcto e, lg pt, ccle pt, exle plted d l e, ell , to d detto plgod.
Te not P lo ot te velop pg te e d podg clt o elte d ecetol cclt.
e vll
Te oe atlete vllge ll e ged Qt D Delce d Ttlo hoe, d ll oe el3,000 e oe, o c od 50 pe cet ll e odle. Fte pe ll cete te 2,000 oe.Locl etl d cot e e poded log t geeo gee pce ot plcl ccele dtel to te loc.
L
Leto pedotl edetl e t lel g teet, good qlt eteet teced og, d
coecl cete o g ox etl t Leto mll. Te hg rod d Leto mll pode ot doo to teOlpc P, tog l eed to e tegteed te ed te.
4.1 chobham
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
17/39
17
M.U.A.
VELODROME
M.U.A.
ChObham
manOr
ETOn
manOr
ChObham
Farm
vELOPark
LEyTOn
EasT viLLaGE
ChannEL TunnEL raiL Link
nOrTh
Park
North Park Landscape Chobham Manor Leyton High Street
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
18/39
London Legacy deveLopment and regeneration pLan
4.2 Stratford
sttod g togete te coe o metopolt sttod te extg to cete d egol l ,sttod Ct coecl, etl d tetol l clte d te sot P Plz d mgte w.
c e
Te Cpete Ette ctcl locto ext to sttod stto, etee te Olpc P d sttodhg steet. Lodo boog o ne eeg to edeelop ot o te ette o ped , to cete ette tegted egoood d ette og o locl people. Te boog ll e-oe tet,leeolde d eeolde g redet Cte te o t o.
alogde te oe poce, uet College Lodo (uCL) e tdg te potetl o e 23-cecollote et dtct ceted o potgdte eec d tecg cece, tecolog dgdte leel eec, to clde cdec clte d ccoodto o t d tdet. T e dtctcold e lge uCL cet cp bloo, deottg te potetl cle o cotet dpct, d ctg oc o de eto o colloto og tetol, uk d locl cdec
ttto d te pte ecto.s c
sttod Ct, oe o te lget xed-e deelopet Eope d clde weteld sttod oppgcete, te coecl itetol Qte d e edetl cot. we coplete, sttod Ctll cot 465,000 qe ete o ofce, 270,000 qe ete o etl d lee pce, p to 2,000 oteloo, el 2,000 e oe ( ddto to toe Et vllge), cot clte d 32 ce o plcope pce.
m W
iedtel djcet to sttod Ct, d logde te aqtc Cete, mgte w ll e ,
etopolt egoood, extedg sttod to cete, ctg gte to Qee Elzet OlpcP, d ecog detto o to, ell eg ttcte edetl qte t o gt.
Tlle ldg ll e te ote pld d pode ettg o te aqtc Cete,acelomttl Ot d te std. i eepg t te e etopolt ccte, t t ed-to g-det loc ll e ged od pte, ldcped cotd.
a g popoto o god oo, ptcll toe tt le te ot cte plc ote d pce, llpode op, ett d ce, ell ofce ccoodto d cot pce. T x o eepod c to t e ole egol to detto t doe to te pecc d-to-d eed ot edet.
t s p plzTe sot P Plz ll ecoe te oc o jo potg d cltl eet e-od d te pcplplc pce t Et Lodo eegg e etopolt dtct.
Te tetol gde, ot, t tllto, dge d poede eted o te Ge ll eeced e tee pltg, l d plo to cete pectcl p, coected d deed eto o te.
Fo llo o to o sttod stto d weteld sttod Ct, te dge to te sot P ll e dtc l pot, oeg te t glpe o te Olpc P. Te std, te acelomttl Ot, d teaqtc Cete ll e te ote od o te Plz, cetg edge o tee ctt d ldldg. Poto o te oe Olpc cocoe ll e eted to coect tee, d to ct tge o
eet d pogg.
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
19/39
19
t bl
i te cete o te Olpc P, te beledee egt o 12 ete oe te re Le e t tltge pot o pectcl poc e o Et Lodo eet dtct, cldg ll te eted Olpcee. bot ot d ot p e ccele o te beledee, g t ot potl pot t teP d oc o ctt.
s h s
sttod hg steet ee tee deelopet ctt ecet e, d clde ttl eo e ptet ldg. a tee e copleted, te cllege ll e to poe te plc el d toge te pct o tfc, to e te hg steet lele pce tt coect sttod To Cete, QeeElzet Olpc P, Cpete d bole--bo.
STADIUM
AQUATICS
M.U.A.M.U.A. wEsTFiELD
sTraTFOrD
CiTyinTErnaTiOnaL
QuarTEr
marshGaTE
wharF
sOuTh
Park
briDGEwaTErTrianGLE
riCk rObErTs
way
CarPEnTErs
EsTaTE
Carpenters Estate South Park Plaza
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
20/39
London Legacy deveLopment and regeneration pLan
4.3 bromley-by-bow and pudding mill
bole--bo d Pddg mll cope ee o oete ccele ld te ceted tcte cldg l, oto, ee d te. mc o te e tll occped dtl d coecl e, t ee o og d egeeto poject e et to todce oe
edetl pce, d to o toge l etee egoood, le etg qe ccte.
p mll
Pddg mll tted o oe dtl ld, ee te eto o te o te bo bc reeet te Get Ete rl dct, te Gee (note Otll see) d sttod hg steet. Telge-cle tcte te e ce te ld to e o e-dcete ld, o c ete dded to egl plot extg tlte ldg d degod tcte.
it tctl ldcpe, coed t te te o oe o te eg dtl ldg dce e, pt ptcl q, gtt ccte to e pctted e o expectedltte pce. a cotepot to t c e od te e g det, g-e edetl deelopet
log te hg steet.a ge o edetl tpe d eploet e ll e todced to edte etee te cottgccte od t eolg cotext. T ppoc cotet t ote lge-cle egeeto poject te edte egoood (e.g . sg hoe Le d Tee mll) c, te togete, e te potetlto cete e d l egoood c xe cete etepe t cot.
s h L
sg hoe Le oe o te e e sttod tt et e dtl ccte t tede cce.Te pl o std Et deeloped iteie ll x e oe t te lo-co coeo o extgtcte, le eectg te e qe ccte. Te deg d dele o sg hoe Le ll eett dee edetl poplto ll e copleeted tg locl e cot. Te plce
ll tll e oded te, t e excellet cclg d lg l e o e dge dcoecto.
t mll il
Tee mll ild t t te Tee mll Coeto ae o te re Le. Te ot o te ild coplex o l d teleo tdo d oe to Tee mll stdo. Te ccte o te e deed teodg e cel d te oe g dtlle ldg, og pe o toc ldg get-et tog te te. To te ot, Tee mll Gee ecetl eceed ldcpe poeet, d epl pce ll e deleed o te Gee e 2012.
blbw n e
bole-bo not e ccteed lo leel dtl t dced etee te re Led te a12. Pl o xed e locl cete t p to 1,200 edetl t ceted od lge e toe,d e plc pce, ell pedet cog co te a12, e cetl eg eeed ollog tete o ld to te Legc Copoto.
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
21/39
21
suGar-
hOusE
LanE
PuDDinG
miLL
LanE
brOmLEy
by bOw
ThrEE
miLLs
abbEy
miLLs
Tree Mills St Andrews development Sugarhouse Lane development proposal
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
22/39
London Legacy deveLopment and regeneration pLan
4.4 hackney wick and fiSh iSland
hce wc d F ild, c clde pt o te Lodo oog o Toe hlet d hce, llx eploet d edetl e, coected cl d te, d dg t ccte o tetg ttc egoood o te edge o te Olpc P.
h W
hce wc xe og to te ot d dtl e to te ot. i ecet e, te e ecoeecoged pott e o t podcto, t g cocetto o tdo pce. Tee pcee ot ol occped cete pcttoe c dege d tt, t lo et o ppotge o gllee to pte to eet oge. wt te gct e o tdo, ppot ece de te e, tee te oppott to deelop odel o got o tee dte hce wctt ot ld po te extg et. hce wc te potetl to eege gct cete o gqlt cete d g tec ed podcto d, oe te, cltl d cete qte t ddtolop, etg plce d gllee.
F il
idtl ctt dee c o te ccte o F ild tod. T oed ldg gg o tod tee-toe c eoe d ctoe dtg o te 19t cet, to oe ecet pot- ctoe,d toge d dtto t.
Te hce wc/F ild ae acto Pl et ot o o te d o plce F ild cold e tete, t e egoood cete t hce wc. Te Pl to cete lced ppoc toegeeto tt ll dele p to 2,800 e oe - cldg ttl poo o odle d log ppoted e cool, ope pce d elt clte, logde pce o e d extgee to go d te. Te Pl pto o F ild to ecoe tegl pt o Toe hlet,to eet te eed d ojecte o Toe hlet cote, d to xe t cotto to legc.
sww
seette ll e tql, copct, lo- to d-e l egoood t tegted locl ete.it ld o te cocetto o cete dte, gllee d ett eegg od F ild dexted t to cooldte e egoood cete te ct o wte Pot Le. rg logde kgyd Eeg Cete t ll e tl ote to te P o hce wc.
seette ccte ll e olded t qe ettg etee to te, t cl-de p tote et, d te sot Plz d pld log te Old re Le to te et. T ettg ll ele te eto ttct le eeg ot pte et pce d dtcte plc ope pce. retl d coeclpce, p ce cete, e d ide stoe ll e todced log Cpete rod eg telocl edet o seette d hce wc. Te egoood lo clde p cool otg oto
te cl p.
at t ot ete edge, te egoood eet te not P d sot P Plz t te beledee.
e W(cldg Pe d bodct Cete)
Et wc ll exted te x o e d cete tlt o hce wc to cete ocl pot o jo dgot t te P. Te cte et o te e deelopet ll e log te et-et ote, extedgwll rod, etee dge oe te Lee ngto, pt te etce to te mlt-ue ae d to te P.
ne oplce d cot clte oeloo t pcpl plc ote. Togete t e p cool,tee clte d te cl p ll g le to te Lee ngto cl edge, cetg l etee Et wcd extg egoood t hce wc.
Te Pe d bodct Cete ll o e eploet , ccoodtg tod o jo, tegtg to tee logde e plc pce. redetl tece e popoed log te p edge to pode cte, tededge to te P, cotepo tepetto o Lodo tdto o lg p t tece oe.
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
23/39
23
STADIUM
AQUATICS
M.U.A.
VELODROME
FORMER
IBC/MPC
STADIUM
AQUATICS
VELODROME
EasT wiCk
haCknEy
wiCk
swEET-
waTEr
Fish isLanD
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
24/39
London Legacy deveLopment and regeneration pLan
5.0 obJectiveS and priority proJectS
Te Legc Copoto lted eoce, d te jot o t dget e oced o te edtepote o e-opeg te P d ee te ttg pot o ccel egeeto. aceg deojecte ll eqe te og to det d ee pote, eze oppotte, oge ptep
d lee dg o ote oce.
O te o extg pl d poge, te Legc Copoto deted pcpl egeetoojecte ot tetc d ptl d pot poject o ceg tee. Tee poject e ddedto toe tt te Legc Copoto ll d d ge (pl toe t te Olpc P, o ccptl dg ee eced te edte te), d poject tt te Copoto ll ee to ppotd deelop t t pte, cldg tog ecg ed-te dg. Poject clde toe deleed deet deptet t te Legc Copoto.
i ecg tee jdgeet ot pote, e e ed te ollog cte:
HowwelltheprojectcontributestowardsachievingtheLegacyCorporationsstrategicobjectives(Park,Plce, People) d te egeeto pote ( jo, got, plceg, cot, coectt)deted t pl;
Howdeliverabletheprojectisintermsoffundingforit,politicalsupport,andpartnershipstosupportdele d e ;
Whetherwehavealegalorotherobligationtodelivertheproject;and
Whetherthereisurgencyorauniqueopportunitytodelivertheproject,orwhetheritcanbedeliveredlte.
LLdc area
qeop
barking riverside
barking toWn
centre
royaL docks
greenWich peninsuLa
canary WharF
oLd street/
shoreditch
e L m r a
Lea river park
river crossings
internationaL trains stopping
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
25/39
25
areaWide priority projects
objectives
p
riorityprojects
To poe eploet te, edctol ttet d ll
To poe locl d egol coecto
To ece det, d ece clo d cot coeo
To cete cte, e d lele plce
Fund and Manage
Eploet d ll o te o tloed tg d jo oege, cldg ppetcep
Ee e et d eet tget o eploet o locl d eploed people, d tget gop
Dele te tteg ptep t Cl & re Tt, to poote cte e o te d
det pote o te etet d od te LLDC e
Ee tget e et d et o ppetcep o locl people
Deelop locl ppl c tog eet te e, d jot e ppot poge
Coect locl cote t te P tog ee c locl to gde, cool poge dLegc yot Pel, d det te ece
Poote ccelt tog te blt Eoet cce Pel d ote ee
Deelop dlt pot poge, cldg l Fetl o Dlt spot
bg od dele o e cool d ote locl tcte
Dele Le re P pe d ppot dele o ote ot-ot coecto
Dele t d clte tteg
Steer and Develop
Cpg o tetol l ece to top t sttod itetol, d o elet l etee hs1 dhs2
sppot e Te e cog
Deelop d ppot dele o tteg o pog cog oe a12
Deelop tteg o odle opce de d otde Legc Copoto od
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
26/39
London Legacy deveLopment and regeneration pLan
0 100 200 300 400 5000 600 700 800 900 1000m
Development
LLDC
LLDC
Boundaries
Borough
Boundaries
Public Realm/
Open Space
Infrastructure/
Connections
DevelopmentOthers
Park Opening
Park Opening
Park Opening
Park Opening
[[3311sstt MMaarrcchh2201144]] [22001155]]
Short
Short
Short
Short
[[2200221]
Medium
Medium
Medium
Medium
Long
Long
Long
Long
[[2203311]]
London Legacy Devlopment Corporation Regeneration Strategy
Draft- 26thApril2012
Long Term Delivery
2031
LB
LLB WWAALLT AAMM
FOOOORRRREES
LBBNEWHHAM
LBTTOWEER HAAAMMLLLET
Y
pl ll LLdc 2031
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
27/39
27
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
28/39
London Legacy deveLopment and regeneration pLan
01 ChObham
ObJEC
TivEs
PriOriTyPrOJECTs
02 sTraTFOrD
5.0 obJectiveS and priority proJectS by area
To dele ccel e cote t Como d Et vllge tegted t odg
egoood
To cete ette coecto etee Leto dte Olpc P
To cete tg cot oc t tenot P
Fund and Manage
1. Dele deelopet o Co mo
2. Dele not P cldg not P d plgod, d ee tt te opetoctel poote e locl people
3. Egge odg edet d ee Leto d mld tog coteggeet tte (eg, det te ecepoject)
4. sppot te tegto o velop d Eto
mo t te oell oe o Qee ElzetOlpc P d te dele o Locl beet
Steer and Develop
5. Ee te edeelopet popol o CoF te ppot log te o o tegted,g qlt egoood coectg Etvllge d mld cote.
6. sppot popol o poeet to cpct dccelt o Leto tto.
To ppot te tegto o sttod expdedto cete, cldg te itetol Qte
d te egeeto o sttod old to cete
To cete lel lg, og d etetetcete te sot P ed od te gtee legc ee
To ppot egeeto o Cpete Ette,cldg tog potetl etet uCL,d poed cce to Olpc P
Fund and Manage
1. Dele sot P plee gde ceecldg sot P h d te eo sttod wteot, d ee tt teopeto ctel poote e locl people
2. Dele e-e o std
Steer and Develop
3. sppot te dele o e ote etce tosttod regol tto o Cpete Ette
4. sppot te egeeto o Cpete Ettecldg elg coectt poeet.
5. sppot te edeelopet d egeeto osttod To Cete, cldg dogdg tegto te
1
2
3
4
4
5
5 6
1
5
2
3
3
4
Plnnng
applcton
Plcrelm
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
29/39
29
04 haCknEy wiCk anD Fish isLanD03 brOmLEy-by-bOw anD PuDDinG miLL
To cete tg xed e o eploet dlg pce, le peeg extg ccte o
dtl etge
To oecoe eece ceted te dte a12 d a11
To ppot etlet o e to cete tbole--bo tog elg cee tsg hoe Le d bole--bo (Teco) toe deleed d to ppot egeeto
To ppot dele o Le re P tteg tae mll d eod.
Fund and Manage
1. Dele xed e egoood t Pddg mllLe, t poed l etee sg hoeLe (std Et) d te P, d ldg o te e tteg.
2. idet log te tteg o Tee mll tdocoplex
Steer and Develop
3. sppot te pgde o bole--bo sttod stto sqe
4. sppot te dele o copeeeedeelopet to cete xed e to cetecee, cldg a12 t gde cog d eecl dge to ht Le.
5. sppot te dele o pedet cog oea11 o ll o bo rodot d e
jcto to ele dect ecl coectoetee sg hoe Le d mgte Le.
6. Ee tt te edeelopet o sg hoeLe ppot te log te ceto o exed egoood t gct opcee, g qlt l og d et te
dtcte dtl etge ccte.
To etl te Pe d bodct Cete jo eploet d good ego to
te p d te edetl deelopet
To t d ece te eeget cetedte clte te e, le llog oedeelopet le t toc ccte
To poe tpot ccelt, cldghce wc stto d a12 cog
To ee tog pcl d peceptlcoectt etee Et wc d seetteetd to hce d Toe hlet
Fund and Manage
1. Dee d dele edeelopet o hce wc te, dele poeet to hce wctto, d ppot deelopet o e loclcete od te tto
2. Dele e-e o Pe d bodct Cete
3. ipleet te dele o te Cl P dctel poote e locl people
Steer and Develop
4. Ee tt edeelopet cee hcewc F ild cotte to deleg te oo dtcte plce t eted dtletge d tg cete cottegted t e edet
5. idet log te tteg o tgtg teeece pct o te a12, cldg egtt poed l (eg, to ro rod) eeced tog edeelopet poject.
6. Dele to d cete te e ctt to tet d etl log te tocldg oppotte o locl edet dee.
4
1
4
2
3
3
4
6
6
5
5
1
34
6
44
4
4
2
55
intemu
e
intemu
e
LLDCDeelopment
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
30/39
London Legacy deveLopment and regeneration pLan
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
31/39
31
Te ppedce cot p c lltte ll pled pcl poject te edte, ot, ed dlog te te LLDC e. Te e te o elet locl polc, gdce d pl.
appendiceS
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
32/39
LA
CK
LBWA
AM
FORE
LBNEWHAM
1.C
HOBHAM
2.S
TRATFORD
4.H
ACKNEYWICK
FISHISLAND
append
ix
i|plano
fpa
rk
openingp
ro
JectSandl
ldc
Sub-areaS
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
33/39
m0001
009
008
007
006
0005
004
003
002
001
0Development
LLDC
LLDC
Boundaries
Borough
Boundaries
PublicRealm/
OpenSpace
Infrastructure/
Connections
Development
Others
ParkOpening
ParkOpening
ParkOpening
ParkOpening
[3[31stMaarcrc
h200141]
LondonLegacyDevlopment
CorporationRegenerationStrategy
Draft-26thApril2012
ParkOpening
31stMarch
2014
LBTOWERHAMLET
3.B
ROMLEYBYBO
W&
PUDDINGMILL
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
34/39
append
ix
ii|plano
fa
llproJectSto2015
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
35/39
m0001
009
008
007
006
0005
004
003
002
001
0Development
LLDC
LLDC
Boundaries
Borough
Boundaries
PublicRealm/
OpenSpace
Infrastructure/
Connections
Development
Others
ParkOpening
ParkOpening
ParkOpening
ParkOpening
[3[31s1tMaarcrc
h20014
[2010155
Short
Short
Short
Short
LondonLegacyDevlopmentCorporationRegenerationStrategy
Draft-26thApril2012
ShortTermD
elivery
2015
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
36/39
L
LBWALTA
M
FORES
LBNEWHAM
append
ixiii|pLano
FaLLprojectsto2
021
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
37/39
0
100
200
300
400
5000
600
70
0
800
900
1000m
Development
LLDC
LLDC
Boundaries
Borough
Boundaries
PublicRealm/
OpenSpace
Infrastructure/
Connections
Development
Others
ParkOpening
ParkOpening
ParkOpening
ParkOpening
[[311stMaarrcch20014
[22001155
Short
Short
Short
Short
M
edium
M
edium
M
edium
M
edium
LondonLegacyDevlop
mentCorporationRegenerationStrategy
Draft-26thApril2012
MediumT
ermD
elivery
2021
[2
021]
M
edium
M
edium
LBTTOWERHAMLETS
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
38/39
append
ixiv|pLano
FaL
Lprojectsto2
031
L
LBWALTA
M
FORES
LBNEWHAM
-
7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf
39/39
200
300
400
5000
600
70
0
800
900
1000m
ParkOpening
ParkOpening
ParkOpening
ParkOpening
[[311stMaarrcch20014
[22001155
Short
Short
Short
Short
[2
021]
M
edium
M
edium
M
edium
M
edium
Long
Long
Long
Long
[20331]]
LondonLegacyDevlop
mentCorporationRegenerationStrategy
Draft-26thApril2012
LongTermD
elivery
2031
LBTTOWERHAMLETS