1 European Plate Observing System ORFEUS representa9on & WG1 composi9on, PDB mee9ng 6 October 2011
EPOS (ESFRI roadmap) Start 2014 [coinciding with EC FP8]
NERA (2010) Seismology & Earthq Eng. ETHZ + ORFEUS/KNMI (D. Giardini; T. van Eck)
EPOS PP (2010) INGV (M.Cocco)
SHARE(2009) Hazard/Risk ETHZ (D. Giardini)
GEM Risk
VERCE (2011) IT & computational seismology IPGP (J-P Vilotte) ORFEUS/KNMI EMSC,…
EUDAT (2011) ESFRI, IT computational Seismology/geophysics CSC Finland (K. Koski) EPOS (INGV)
ENVRI (2011) ESFRI, IT standards UvA/LifeWatch (W. Los) EPOS (ORFEUS/KNMI)
QUEST (2010) (Training network) Computational Seismology LMU (H. Igel)
COOPEUS (2012) EU-US collaboration Marum (C. Waldmann) EPOS(ORFEUS/INGV) EarthScope
Related relevant EC-project projects Seismology
REACT (2011) Rapid Response GFZ (J. Zschau), EMSC,
2 European Plate Observing System ORFEUS representa9on & WG1 composi9on, PDB mee9ng 6 October 2011
ENVRI overview [common partners: KNMI and EUDIN] ENVRI -‐ Common Opera9ons of Environmental Research Infrastructures Work Packages WP1 -‐ Management WP2 -‐ Internal and external liaisons (COORD)
EPOS aJendance at workshops/discussions (VERCE, NERA, …) WP3 -‐ Infrastructure reference model and system interoperability (RTD)
EPOS/KNMI 8 mm, EPOS/EUDIN 15 mm Common requirements (3.2) and state of the art (3.1) Task 3.4 Linked Computa\onal, Network, and Storage Infrastructure
WP4 -‐ Technical contribu\on to ESFRI-‐ENV projects and GEO-‐GEOSS (RTD) EUDIN/EPOS – 7 mm Emphasis on Satellite data interac\on
WP5 -‐ Dissemina\on and sustainability (COORD) EPOS/KNMI -‐ 1 mm
ENVRI Kick-‐off: guide KNMI and EUDIN emphasize VERCE/EUDIN/NERA work coord
3 European Plate Observing System ORFEUS representa9on & WG1 composi9on, PDB mee9ng 6 October 2011
Other considera\ons: VERCE and other projects impact for ORFEUS/EPOS: Test-‐case -‐ discussion on future seismology data management and access • Speed up research using data and computa\onal resources • Data storage and transport • Data provenance and data curra\on (also results from computa\ons) Coordina9on challenge: Other na\onal inita\ves? Example: COMMIT (NL) Large Scale Na9onal IT project.
Involvement: Harves\ng knowledge in real-‐\me from massive spa\otemporal event databases.
data storage with embedded computa\onal resources ’efficient products’.