Download - Reducing the Energy Required in Grinding Clinker to Cement—Benzer Aydogan Dundar and Lynch
-
1Reducingtheenergyrequiredingrindingclinkertocement:somecasestudies
H. Benzer,N. Aydogan ,H. Dundar andA. J. Lynch
HACETTEPEUNIVERSITYMiningEngineeringDepartment
-
2Reducingtheenergyrequiredingrindingclinkertocement
1.INTRODUCTION
MetPlant 201189August2011,Perth,WesternAustralia
0
500
1,000
1,500
2,000
2,500
3,000
3,500
2006 2007 2008 2009 2010
Worldcementproduction(milliontonnes)
-
The effect of change in ball size
Optimizing circuits containing HPGRs, ball mills and separators
The use of high intensity grinding
3Reducingtheenergyrequiredingrindingclinkertocement
2.OUTLINE
MetPlant 201189August2011,Perth,WesternAustralia
-
4Reducingtheenergyrequiredingrindingclinkertocement
3.THEEFFECTOFCHANGEINBALLSIZE
MetPlant 201189August2011,Perth,WesternAustralia
-
5Reducingtheenergyrequiredingrindingclinkertocement
3.THEEFFECTOFCHANGEINBALLSIZE
MetPlant 201189August2011,Perth,WesternAustralia
0
10
20
30
40
50
50 60 70 80 90
w
e
i
g
h
t
%
ballsize(mm)
1st chamberbefore
after
0
10
20
30
40
50
17 20 25 30 40 50
w
e
i
g
h
t
%
ballsize(mm)
2nd chamber
before
after
-
6Reducingtheenergyrequiredingrindingclinkertocement
3.THEEFFECTOFCHANGEINBALLSIZE
MetPlant 201189August2011,Perth,WesternAustralia
Capacity (tph)
Product type Before optimization After optimizationA 155 180B 178 205C 162 195D 142 160
-
7Reducingtheenergyrequiredingrindingclinkertocement
4.HPGRAPPLICATONSANDENERGYEFFICIENCY
MetPlant 201189August2011,Perth,WesternAustralia
-
8Reducingtheenergyrequiredingrindingclinkertocement
4.HPGRAPPLICATONSANDENERGYEFFICIENCY
MetPlant 201189August2011,Perth,WesternAustralia
(2) (3)
(1)
-
9Reducingtheenergyrequiredingrindingclinkertocement
4.HPGRAPPLICATONSANDENERGYEFFICIENCY
MetPlant 201189August2011,Perth,WesternAustralia
Case study 1 2 3
Raw materials fed Clinker (95%) Clinker (74%) Clinker (94)
Capacity (tph) 55.3 71.7 132.0
Specific energy use (kWh/t)HPGR - 8.9 8.02
HPGR-Ball Mill 32.7 29.5 21.6
Final product size (m) 30 68 28
-
10Reducingtheenergyrequiredingrindingclinkertocement
5.VERYFINEGRINDINGUSINGVBM
MetPlant 201189August2011,Perth,WesternAustralia
Vibration frequency (rpm) 1160
Motor power (kW) 50
Internal Diameter (m) 0.78
Internal Length (m) 1.2
Operational ball load % 90
-
11Reducingtheenergyrequiredingrindingclinkertocement
5.VERYFINEGRINDINGUSINGVBM
MetPlant 201189August2011,Perth,WesternAustralia
0
10
20
30
40
50
60
70
80
90
100
0.001 0.01 0.1 1
p
a
s
s
i
n
g
%
p.size(mm)
tot.FeedtoVBM1
VBM1discharge
VBM2discharge
sp.en.consumption(kWh/t)
28 days strength(MPa)
Finish cement 28 37.6
End-product 35 38.1
-
12Reducingtheenergyrequiredingrindingclinkertocement
6.CONCLUSION
MetPlant 201189August2011,Perth,WesternAustralia
Optimizingtheballsizedistributioninfinishmillingofcementusingmodelling andsimulation resultedinhigherproductionrate,reducedoverallspecificenergyconsumptionandlowercost ofmetalwear.
TheuseofHPGRsinfinishmillingcircuitsaspregrinders increasesthecapacityoftheexistingcircuitsbyreducingtheworkdonebythedownstreamballmills.ClosedcircuitHPGRs reducesignificantlytheoverallspecificenergy consumptionofthecircuit.
Vibratory ballmillsusedafterfinishcementproductiontoreshapethefinalproduct whentheadditivesareincreased resultsinacosteffectiveprocess.HoweverforhighcapacityfinishmillingcircuitstheapplicationoftheVibratoryBallMillsisnotpracticalduetotheirlowcapacity.
-
13Reducingtheenergyrequiredingrindingclinkertocement
7.ACKNOWLEDGEMENTS
MetPlant 201189August2011,Perth,WesternAustralia
IzmrCementPlantfortheirpermissiontopresentthiswork
HacettepeComminutionGroupmembersfortheirsupportinconductingthesurveys