Recommissioning Workshop
September 12, 2013 Dave Moser, PE Senior Engineer PECI
1
© PECI 2013
![Page 2: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/2.jpg)
Preview for the Day
2
Topic Start time What is existing building commissioning (EBCx)? Costs / benefits Case studies EBCx process
Break 9:15 EBCx team Benchmarking / utility analysis LEED-EBOM Xcel Energy Recommissioning program
Break 10:30 Common findings Persistence of benefits Resources Wrap-up 11:45
Class dismissed! 12:00
8:30
9:30
10:45
![Page 3: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/3.jpg)
The Gist of Energy-Focused EBCx
Going from this…. to this!
3
![Page 4: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/4.jpg)
But Seriously, EBCx is…
A systematic process for improving an existing building’s performance
Includes a rigorous investigation to identify problems, especially integration issues
Primary focus is on identifying low cost operational improvements
May be done alone or with a retrofit project
![Page 5: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/5.jpg)
Other Terminology You May Hear
Retrocommissioning (RCx)
Recommissioning (ReCx)
Ongoing Commissioning (OCx)
Monitoring-Based Commissioning (MBCx)
5
Note: Xcel Energy’s program covers both RCx and ReCx
Existing Building Commissioning (EBCx)
![Page 6: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/6.jpg)
6
Ongoing commissioning
Persistence
Existing building commissioning
New construction commissioning
Tuned, optimized, and documented systems with
training for O&M staff
Tuned, optimized, and documented systems with
training for O&M staff
Performance tracking Updated documentation Ongoing training
![Page 7: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/7.jpg)
Is EBCx Needed After Cx?
No, it’s not.* *As long as: No changes are ever made
to the building Cx included system
optimization The building operates
exactly the same as after construction.
7
![Page 8: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/8.jpg)
Ch-ch-ch-ch-changes
What changes typically occur over time in a commercial building?
______________________________ ______________________________ ______________________________ ______________________________
8 Your Turn!
![Page 9: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/9.jpg)
How Does EBCx Differ From a Tune-up? Tune-up Maintenance Components and
equipment Capacity Physical Savings Opportunities
EBCx Operation Systems and
Integration Performance Mental More Savings
Opportunities
9
EBCx includes and moves beyond tune-up procedures.
![Page 10: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/10.jpg)
Revisiting O&M Maintenance = Capacity
Caring, cleaning, lubing, repairing
Primarily physical
Operation = Performance Scheduling,
implementing efficient control strategies, sequencing of equipment
Primarily mental
10
![Page 11: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/11.jpg)
Maintenance Issue Example
Upper set of dampers should be open.
Linkage has come loose from actuator.
11
![Page 12: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/12.jpg)
Operational Issue Example
Heaters should be off at OATs above 40°F.
12
![Page 13: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/13.jpg)
13 Source: Mills 2009
#1
#2
#3
#4
Why EBCx?
![Page 14: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/14.jpg)
What’s All the Fuss About Energy?
U.S. Energy Usage U.S. Electricity Sales
14 Source: EIA Annual Energy Review 2011
![Page 15: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/15.jpg)
EBCx Costs & Savings
15
CxA cost = ~45% of total cost
Source: Mills 2009
![Page 16: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/16.jpg)
Factors Influencing Total Cost
Goals of project Systems to include in project
Number of systems, zones System complexity
Ease of obtaining trend data through BAS More costly if data loggers are needed
Owner / operator involvement
16
![Page 17: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/17.jpg)
Help Reduce the Cost of EBCx
17
EBCx Phase Owner / Operator Action
Planning Compile a list of known problems and possible improvements.
Gather up-to-date building documentation. Investigation Perform appropriate preventive maintenance tasks early.
Perform simple repairs as the project progresses. Assist with diagnostic monitoring and functional testing.
Implementation Assist with implementing the selected improvements.
Hand-Off and Post-EBCx Help facilitate training. Maintain improved performance of systems.
![Page 18: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/18.jpg)
Local Case Study – Grace Church
343,000 sf megachurch Eden Prairie, MN Five EBCx measures
AHU runtime reduction Supply air temperature reset Control VAV boxes from occupancy sensors Demand-controlled ventilation Reduce VAV box airflow to match zone needs
18
![Page 19: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/19.jpg)
19
Local Case Study – Grace Church
Financials Total utility cost savings: $108,000 / yr Project cost: $182,000 Xcel Energy incentives: $39,000 Net simple payback: 1.3 years
![Page 20: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/20.jpg)
20
Local Case Study – North Memorial
Ambulatory care center and medical office
200,000 sf facility just northwest of Minneapolis
EBCx Measures Reduce outside air to surgical suites
during unoccupied hours Reduce runtime of clinic area HVAC Supply air temperature reset Unoccupied temperature setback
![Page 21: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/21.jpg)
21
Local Case Study – North Memorial
Financials Total utility cost savings: $96,000 / yr Project cost: $250,000 Xcel Energy incentives: $51,000 Federal stimulus funding: $100,000 Net simple payback: 1.0 year
![Page 22: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/22.jpg)
EBCx Process Overview
22 From the EPA’s “A Retrocommissioning Guide For Building Owners”.
![Page 23: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/23.jpg)
23
Planning
Investigation
Implementation
Hand-Off
Post-RCx
![Page 24: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/24.jpg)
Screening Select good building candidates for EBCx Ideal building characteristics:
Proactive management philosophy, motivated building operators
Commercial or institutional facility with complex HVAC and lighting systems
Direct digital control (DDC) down to zone level High energy consumption Mechanical equipment in relatively good condition and
not at end-of-life Sensor calibration part of preventive maintenance
24
Planning
![Page 25: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/25.jpg)
Most systems are in need of replacement
High energy usage Motivated operators Major system design problems Catastrophic problems (e.g.,
asbestos) Complex HVAC and lighting systems Excessive comfort complaints
Is EBCx Appropriate?
25
Probably Probably not
Planning
Your Turn!
![Page 26: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/26.jpg)
Selecting a Provider
RFQ (Request for Qualifications) process Request experience for similar projects Request example work products Ask if EBCx is a core business service
RFP (Request for Proposal) process
Sample RFP available from California Commissioning Collaborative
26
Planning
![Page 27: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/27.jpg)
Sources of EBCx Providers
Xcel Energy www.xcelenergy.com/recomm
Building Commissioning Association
www.bcxa.org
California Commissioning Collaborative www.cacx.org/resources/provider_list.html
27
Planning
![Page 28: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/28.jpg)
Planning Phase - Scoping Analyze the building’s energy consumption Assess potential with a site walk through
Review building documentation Understand the current operational requirements Interview the operating staff Identify opportunities
Analyze results Develop a scope of work to complete EBCx process
28
Planning
![Page 29: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/29.jpg)
Useful Documentation Utility data – at least 12
months Control drawings with full
points list Sequences of operation Full set of as-built
drawings/shop drawings Mechanical Electrical Plumbing Architectural drawings
TAB report(s) Past energy conservation
reports Original equipment
submittals
29
Planning
![Page 30: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/30.jpg)
Building Walk-Through: HVAC
30
Planning
Your Turn!
![Page 31: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/31.jpg)
Building Walk-Through: BAS
31
Planning
Your Turn!
![Page 32: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/32.jpg)
Building Walk-Through: Lighting
32
Planning
Your Turn!
![Page 33: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/33.jpg)
Building Walk-Through: Plug Loads
33
Planning
Your Turn!
![Page 34: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/34.jpg)
Building Walk-Through: Envelope
34
Planning
Your Turn!
![Page 35: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/35.jpg)
35
Planning
Investigation
Implementation
Hand-Off
Post-RCx
![Page 36: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/36.jpg)
Investigation Phase Summary
Conduct detailed document review Interview occupants and operating staff Evaluate facility performance Analyze identified measures Develop Master List of Findings
36
Investigation
![Page 37: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/37.jpg)
Evaluate Facility Performance
Purpose: Determine if current facility requirements are met Identify facility improvement measures
Methods: Analyze energy usage Review interview results Review service requests and complaints Compare actual conditions to CFR Perform diagnostic monitoring Conduct site investigation and testing
37
Investigation
![Page 38: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/38.jpg)
38
Planning
Investigation
Implementation
Hand-Off
Post-RCx
![Page 39: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/39.jpg)
Implementation Phase Summary
Select measures for implementation Prepare implementation plan Implement measures Verify successful measure implementation
39
Implementation
![Page 40: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/40.jpg)
40
Planning
Investigation
Implementation
Hand-Off
Post-RCx
![Page 41: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/41.jpg)
Hand-Off Phase Summary
Update documentation Develop persistence strategies Conduct training Develop Final Report
41
Hand-off
![Page 42: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/42.jpg)
42
Planning
Investigation
Implementation
Hand-Off
Post-RCx
![Page 43: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/43.jpg)
Up Next:
15 minute break When we come back: EBCx team roles and
responsibilities Discuss LEED-EB Xcel Energy RCx
program overview
43
![Page 44: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/44.jpg)
Owner and designated representatives
Commissioning Authority (CxA)
Utility program representative
The EBCx Team
44
Facility Manager, O&M personnel Specialty
subcontractors and consultants
![Page 45: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/45.jpg)
Owner / Staff Role
Management Level Be open to the
process as a learning and improvement process
Coordinate funding Select EBCx provider
Facilities/Ops Level Assist the EBCx team Embrace suggestions
for change and improvement
45
![Page 46: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/46.jpg)
EBCx Service Provider’s Role Integrate and coordinate
the team’s effort Lead the investigation
and hand-off phases of the project
Work with management and operations team
46
![Page 47: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/47.jpg)
Supplier’s and Contractor’s Role Support investigation as
needed Implement EBCx measures Integrate EBCx
recommendations into ongoing contractual work
47
![Page 48: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/48.jpg)
Energy Benchmarking
Comparison to other buildings Similar types Similar size Similar climate
Big picture indicator of efficiency (or lack of it)
Can use to prioritize projects within portfolio
48
![Page 49: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/49.jpg)
Benchmarking with ENERGY STAR®
How does it work? Building performance assessment
Scale of 1-100 1 = least efficient, 100 = most efficient, 50 = average
Similar buildings nationwide
49
![Page 50: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/50.jpg)
Benchmarking with ENERGY STAR®
How does it work? Assessment takes
into account: Weather Size Location Operating
characteristics 75 or higher may
qualify for an Energy Star® plaque
Why do it? Quick reality check
for scoping Tracking tool for
persistence
50
![Page 51: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/51.jpg)
Analyze Monthly Utility Data
51
![Page 52: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/52.jpg)
More Useful Utility Data
Interval utility data (e.g., 15 minute data) Identify base load during unoccupied conditions Identify operational problems during normal
building operating hours Available through your Xcel Account Manager
52
![Page 53: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/53.jpg)
Using Interval Meter Data
53
‘Good’ profile
![Page 54: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/54.jpg)
Using Interval Meter Data
54
0.00
100.00
200.00
300.00
400.00
500.00
600.00
700.00
800.00
12:0
0 AM
2:00
AM
4:00
AM
6:00
AM
8:00
AM
10:0
0 AM
12:0
0 PM
2:00
PM
4:00
PM
6:00
PM
8:00
PM
10:0
0 PM
Bui
ldin
g po
wer
dra
w, k
W
Weekday
Saturday
Sunday
Holiday
Your Turn!
![Page 55: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/55.jpg)
55
LEED-EB
![Page 56: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/56.jpg)
LEED and Commissioning Leadership in Energy and Environmental Design for
Existing Buildings: Operations and Maintenance Or, “LEED-EBOM”
Certifies the sustainability of ongoing operations of
existing commercial and institutional buildings Addresses similar categories as LEED-NC
Current version is LEED 2009, updated in July of 2013
56
![Page 57: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/57.jpg)
When do you use LEED-EBOM?
Initial certification of existing buildings Ongoing re-certification of existing
buildings first certified under LEED-EBOM (within five years)
Ongoing re-certification of existing buildings first certified under LEED-NC (within five years)
www.usgbc.org
57
![Page 58: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/58.jpg)
Where Does EBCx Fit In? Energy & Atmosphere
Prerequisite 1: Level 1 energy audit “Walk-through” audit Document systems, PM plan, identify savings opportunities
Prerequisite 2: Minimum E* score of 69
Related credits: Credit 1: Optimize Energy Performance
Based on Energy Star score Possible 18 points
Compare to 40 minimum points required for LEED-EBOM certification
58
![Page 59: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/59.jpg)
Where Does EBCx Fit In?
Credit 2: Existing Building Commissioning 2.1 Investigation (2 points) ASHRAE Level 2 audit also allowed
2.2 Implementation (2 points) 2.3 Ongoing Commissioning (2 points) Develop a plan, and complete some of the
work
59
![Page 60: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/60.jpg)
60
Xcel Energy’s Recommissioning Program
![Page 61: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/61.jpg)
Topics
Eligibility Rebates Process Resources
61
![Page 62: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/62.jpg)
62
Who is Eligible?
Xcel Energy electric and/or natural gas business customers in Colorado or Minnesota.
Any age building In Colorado, buildings must be greater than 50,000
square feet or have high-energy use to qualify.
![Page 63: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/63.jpg)
63
Study Rebates
We’ll provide up to 75% of the cost of the study, not to exceed $25,000
![Page 64: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/64.jpg)
Implementation Rebates Electric rebates
Up to $400/kW or $0.045/kWh You earn the higher of the two
Natural gas rebates (for our retail gas customers) Up to $5/Dth
Maximum rebate is 60% of measure cost
Payback must be between 9 months and 15 years to earn a rebate
64
![Page 65: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/65.jpg)
Implementation Bonus
On all qualifying recommissioning measures submitted within nine months of the study approval date. An additional $0.03/kWh and/or $3/Dth
That’s in addition to the $0.045/kWh and/or $5/Dth already earned for implementing measures with a 9 month – 15 year payback.
65
![Page 66: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/66.jpg)
66
Process 1. Obtain preapproval before beginning
Submit application with proposal Proposal should identify building issues, concerns and
what the study provider will review 2. Complete the study
Study will contain a list of measures you can implement Xcel Energy needs to approve the final study before
issuing study rebate 3. Implement measures
You choose what to implement Some measures may require measurement and
verification (M&V) Rebate is paid after M&V is complete (if needed)
![Page 67: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/67.jpg)
67
Study Providers
You choose your own provider Provider must submit their qualifications if they
haven’t worked with our program Look at our list of providers who have
participated in the past if you need an idea It’s included in your handout
![Page 68: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/68.jpg)
68
Fast Track Recommissioning Options
Fast track study Implementation rebates available for customers who have
completed a RCx study on their own (without funding from Xcel Energy)
Fast track proposal Implementation rebates available for RCx measures that
may be identified in a vendor’s proposal
Requires preapproval and energy savings
calculations must be included with application
![Page 69: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/69.jpg)
69
Resources
www.xcelenergy.com/recomm Xcel Energy case studies
Office, school, hospital, hotel, medical and research center
Recommissioning guidebook Provider list Applications
![Page 70: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/70.jpg)
70
How Do I Get Started?
Contact your Xcel Energy Account Manager Call an Energy Efficiency Specialist at 1-800-481-4700
![Page 71: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/71.jpg)
71
Questions?
Thank you!
![Page 72: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/72.jpg)
Up Next:
72
Up Next:
15 minute break When we come back: Common findings and
case studies Persistence of benefits Available resources
![Page 73: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/73.jpg)
EBCx Results from the Field
73
122 EBCx projects, most in CA.
Source: PECI, 2009
![Page 74: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/74.jpg)
Common Low-cost Opportunities
Technical Issues and Case Studies Airside Economizer Schedules Setpoints / Reset Schedules Pumping Ventilation
74
![Page 75: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/75.jpg)
Economizer dampers
During cool outside air conditions, more outside air can be brought in to help cool the building ‘Free’ cooling
75
![Page 76: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/76.jpg)
General Economizer Issue Categories Damper system design (sizing / arrangement)
E.g., oversized dampers Controls sequences and sensor arrangement
E.g., low economizer damper lockout temperature Maintenance
E.g., disconnected pneumatic actuator Both energy and non-energy benefits can be realized
76
![Page 77: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/77.jpg)
Evaluate Airside Economizers
Inspect economizer maintenance Blade and jamb seals
installed, in good condition?
Actuators adjusted for full closure?
Actuators connected to dampers?
77
![Page 78: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/78.jpg)
Schedules – Overview
Scheduling Issues Often modified for specific, short-term needs Schedule modifications can be forgotten Improper system installation can lead to
occupant request for modified schedule How to identify
Trend data Interval utility data After hours walk-through if possible
78
![Page 79: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/79.jpg)
Schedules Example – Heat Pumps As-found situation
Schedules were modified for short-term requests Heat pumps were operating when building was
unoccupied Water loop circulation pumps ran continuously Fluid cooler spray pump and fan ran while building
was unoccupied Identified during investigation via system trends and
data loggers on the equipment
79
![Page 80: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/80.jpg)
Setpoint Example – As-found Condition
What is wrong with this picture?
80
Heating AHUs design:
180 EWT 105 LAT
P6
P7
P8
B5 B4 B3
P3 P4 P5
B1
B2
Hot deck DAT reset 150°F above 60°F OA 180°F below 48°F OA P2
P1
95% 95% 95%
Hot deck reset calls for a higher DAT than the available EWT, resulting in 100% hot water valve position and excess pumping.
Hot water reset 140°F above 60°F OA 180°F below 48°F OA
3-5ºF ∆T
Mild spring day in Portland, OR.
Your Turn!
![Page 81: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/81.jpg)
Setpoint Example
Physically impossible for the system to achieve what it’s being asked to do But it’ll try anyway, which is why
all the pumps are on and operating at near 100% speed
81
![Page 82: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/82.jpg)
Setpoint Example – Proper Operation
82
Heating AHUs design:
180 EWT 105 LAT
P6
P7
P8
B5 B4 B3
P3 P4 P5
B1
B2
Hot deck DAT reset 70°F above 60°F OA 110°F below 48°F OA P2
P1
0-50%
0-50%
One pump is OFF and the other two operate between 0-50% speed to meet load. Delta-T across the loop is about 30F.
Hot water reset 140°F above 60°F OA 180°F below 48°F OA
0%
30F
Was 150ºF Was 180ºF
![Page 83: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/83.jpg)
Setpoint Example – Past Project
Savings opportunity Energy savings: 29,000 kWh/yr and
4,200 therms/yr Annual cost savings: $4,800 total
83
![Page 84: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/84.jpg)
Pumping Opportunities – Overview
Pumping Issues Many pumps are oversized
Safety factor Future expansion
How to identify
Throttled discharge valve Both parallel pumps on Low temperature differential across a loop
84
![Page 85: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/85.jpg)
Throttled discharge valve
Sometimes it’s easy to spot a throttled valve …
85
Closed
Open
![Page 86: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/86.jpg)
Throttled discharge valve
86
… othertimes, not so much.
![Page 87: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/87.jpg)
Implementation Options
Option 1 - Trim the existing impeller Open pump, trim impeller, reassemble
Option 2 – Replace the impeller with a smaller one Option 3 – Add a VFD
Then dial in speed to match flow May be more costly, but allows for future capacity
87
![Page 88: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/88.jpg)
Evaluate HVAC Pumps
Parallel pumps – shut one off? Level of savings depends on pump curve.
88
Shallow curve – less flow increase
![Page 89: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/89.jpg)
Evaluate Ventilation
Ventilation control – typical issues: Actual occupant load less than design Space usage changed
Common opportunities:
Add demand-controlled ventilation (DCV) Reduce OA flow rate Reduce VAV box min flow rates Reset VAV box min flow rates
89
![Page 90: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/90.jpg)
Evaluate Ventilation - Clues Cold complaints in zones with no reheat Low measured CO2 values High summertime boiler usage
90
![Page 91: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/91.jpg)
Evaluate Ventilation Ventilation case study 800,000 sf building. Issues:
Design occupancy: 6,000 people. Actual occupancy: 1,850 people.
Implemented measures: Lower VAV box min flow setpoints Close VAV boxes during unoccupied times
Financials: Cost: $10,000 Annual savings: $30,000
91
![Page 92: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/92.jpg)
92
Persistence of Benefits
![Page 93: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/93.jpg)
Making Energy Benefits Last Persistence is an issue with EBCx measures
Operational measures can easily be undone
Various methods for ensuring persistence: Owner / operator training (key!) Updated building documentation / systems manuals Performance tracking
Building benchmarking (Energy Star) Utility bill / energy use tracking (whole building level) Trending of key metrics (systems level)
93
![Page 94: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/94.jpg)
Performance Monitoring Tools
Whole-building level Monitor energy consumption, identify anomalies.
94
![Page 95: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/95.jpg)
Performance Monitoring Tools
System-level Monitors data from a BAS to continuously
identify EBCx opportunities
95
![Page 96: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/96.jpg)
Systems Level Tracking
Fan Speed variation measure AH serving public areas. 24/7/365, 60 HP fan. Baseline: VFD had failed, operating in bypass.
Excessive reheat due to overcooling. Measure: Replace failed VFD. $18,000 annual savings,
$5,600 implementation cost. Tracked during 2007, quarterly reports sent to Owner
96
![Page 97: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/97.jpg)
Systems Level Example
97
Air Handler Supply Fan Performance
0
20
40
60
80
100
120
6/30
/200
7
7/7/
2007
7/14
/200
7
7/21
/200
7
7/28
/200
7
8/4/
2007
8/11
/200
7
8/18
/200
7
8/25
/200
7
9/1/
2007
9/8/
2007
9/15
/200
7
9/22
/200
7
Date
OA
Tem
p (º
F), F
an S
peed
(% m
ax.)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Duc
t Sta
tic P
ress
ure
("H
2O)
Outside Air Temp Fan Speed Pre-RCx Fan Speed Duct Static Pressure
Duct static pressure is stable
Fan speed is less than pre-EBCx
Summary: System is operating as expected
![Page 98: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/98.jpg)
Systems Level Example
98
Air Handler Supply Fan Performance
0
20
40
60
80
100
120
6/30
/200
7
7/7/
2007
7/14
/200
7
7/21
/200
7
7/28
/200
7
8/4/
2007
8/11
/200
7
8/18
/200
7
8/25
/200
7
9/1/
2007
9/8/
2007
9/15
/200
7
9/22
/200
7
Date
OA
Tem
p (º
F), F
an S
peed
(% m
ax.)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Duc
t Sta
tic P
ress
ure
("H
2O)
Outside Air Temp Fan Speed Pre-RCx Fan Speed Duct Static Pressure
Fan reverts to pre-EBCx condition. VFD programming was lost as part of a controls migration project.
Duct static pressure is now high and unstable.
Problem identified on 9/10/07.
![Page 99: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/99.jpg)
System Level Example
99
Air Handler Supply Fan Performance
0
20
40
60
80
100
120
6/30
/200
7
7/7/
2007
7/14
/200
7
7/21
/200
7
7/28
/200
7
8/4/
2007
8/11
/200
7
8/18
/200
7
8/25
/200
7
9/1/
2007
9/8/
2007
9/15
/200
7
9/22
/200
7
Date
OA
Tem
p (º
F), F
an S
peed
(% m
ax.)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Duc
t Sta
tic P
ress
ure
("H
2O)
Outside Air Temp Fan Speed Pre-RCx Fan Speed Duct Static Pressure
VFD programming restored on 9/20/07, returned to ‘auto’ operation. Fan speed reduced, duct pressure is now normal and stable.
![Page 100: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/100.jpg)
100
Resources
![Page 101: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/101.jpg)
Resources
Xcel Energy: www.xcelenergy.com/recomm
101
![Page 102: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/102.jpg)
Resources Mills study (2009): “Building Commissioning: A Golden Opportunity for
Reducing Energy Costs and Greenhouse-gas Emissions.”. Meta-study of Cx and EBCx projects.
PECI (2009): “A Study on Energy Savings and Measure Cost Effectiveness of Existing Building Commissioning.” Measure-level study.
EPA’s “A Retrocommissioning Guide for Building Owners.” EBCx desk reference.
Building Commissioning Association (BCA), “Best Practices in Commissioning Existing Buildings.” A summary of the EBCx process.
102
![Page 103: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/103.jpg)
Resources Additional EBCx training:
PECI AABC Commissioning Group Association of Energy Engineers Building Commissioning Association National Environmental Balancing Bureau Testing Adjusting and Balancing Bureau University of Wisconsin-Madison
CCC’s “Building Performance Tracking Handbook.”
Guide for performance tracking.
103
![Page 104: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/104.jpg)
Resources California Commissioning Collaborative (www.cacx.org)
Case studies Tools and templates Guidelines
Commercial Building Energy Consumption Survey (CBECS)
Consumption and expenditure data (country-wide) Energy Star is based on CBECS data http://www.eia.gov/consumption/commercial/
104
![Page 106: Recommissioning Workshop - Xcel Energy€¦ · Benchmarking / utility analysis . LEED-EBOM . Xcel Energy Recommissioning program . Break . 10:30 . Common findings . Persistence of](https://reader035.vdocuments.site/reader035/viewer/2022071220/605ad55146f68c4499461a0f/html5/thumbnails/106.jpg)