RANDALL MUSEUM RENOVATION PUBLIC ART PROJECT OUTLINE BACKGROUND (CAPITAL IMPROVEMENT PROJECT OVERVIEW) Recreation & Parks Department (RPD), in conjunction with the Randall Museum Friends (RMF), is undertaking a renovation of the Randall Museum facilities with the help of a grant from the California State Parks, under their Nature Education Facilities Program. The renovation project comprises new geology and zoology exhibits, a new science lab, a new elevator, as well as the renovation of the live animal exhibit, classroom, restrooms, first floor lobby, and concession area. Sustainable design techniques will be implemented as per the grant requirements. ART OPPORTUNITIES There are a variety of art opportunities at this site and no one artwork location has been predetermined. The first floor lobby has been identified as a potential location for an artwork. The renovated lobby will include a glass façade entrance, skylight and atrium. The atrium will span from the skylight to the ground floor. A concrete wall (20’ wide x 20’ tall), will comprise the back of the proposed atrium (8’ x 4’). A two dimensional or sculptural art opportunity exists in relationship to this space: for either the wall or the atrium. Referencing the Randall Museum’s confluence of science and art, there is a desire for the artwork to reference or utilize natural environmental phenomenon, such as light, water, wind, sun and fog. PROJECT GOAL The project goal is to commission a signature artwork in association with the renovation of the Museum. The artwork will reflect the Randall Museum’s intention to be a place “that fosters a love of science, natural history, and the arts.” PROJECT BUDGET The total art enrichment budget is $96,000. The high level project budget breakdown is as follows:
• Admin Fee - $19,200 • Selection Costs - $1,350 • Artist Contract Amount (including installation) - $63,350 • Signage and Documentation - $2,500 • Contingency - $4,800 • Conservation - $4,800
ARITS RECRUITMENT APPROACH AND ELIGIBILITY Arts Commission staff will select a short list of artists from the 2013/2014 Prequalified Artists Pool
[1]
ARTIST SELECTION PROCESS The list of qualified artists will be presented to the Randall Museum Project Selection Panel consisting of: a representative of the client agency (Randall Museum), a member of the design team (RPD), an arts professional, an Arts Commissioner, and a community member (RMF). By a process of direct selection, the panel will identify one artist who, on the basis of their portfolio of past work, will be commissioned to create a site-specific artwork. COMMUNITY INVOLVEMENT
• SFAC staff will present an overview of the public art project in conjunction with the Randall Museum Redevelopment presentation to the community in April, 2014.
• A community representative (from RMF) will serve on the Randall Museum Project Selection Panel and will participate in the Artist Orientation
• All selection panels, Visual Arts Committee (VAC) and Commission meetings are open to the public.
TIMELINE (Subject to change) Project Outline Approval (VAC) December 18, 2013 Artist Selection Panel Late-January, 2014 VAC Approval February 19, 2014 Artist Interview Panel Late-February, 2014 VAC Approval March 19, 2014 Arts Commission Approval April 7, 2014 Artist Under Contract May, 2014 FURTHER INFORMATION Contact Justine Topfer, Public Art Project Manager at (415)252-2584 or by email at [email protected].
[2]
RANDALL MUSEUM RENOVATIONS
SAN FRANCISCO ARTS COMMISSIONCIVIC DESIGN REVIEWSCHEMATIC DESIGN
PLA/KRA JOINT VENTURE
NEFP GRANT RENOVATION SCOPE OF WORK
1. RENOVATE LIVE ANIMAL EXHIBIT2. CONSTRUCT GEOLOGY EXHIBIT3. CONSTRUCT ZOOLOGY EXHIBIT4. CONSTRUCT SCIENCE LAB5. RENOVATE BUCKLEY ROOM6. INSTALL ELEVATOR7. RENOVATE (3) BATHROOMS8. RENOVATE LOBBY9. RENOVATE CONCESSIONS
PROJECT TEAM
SAN FRANCISCO RECREATION & PARKS DEPT.RANDALL MUSEUM FRIENDSRANDALL MUSEUM STAFFEQUITY COMMUNITY BUILDERSPLA / KRA JOINT VENTURETHE SIBBETT GROUP W/ TENJITENNEBAUM MANHEIMENGINEERING 350EDESIGN-CTELAMON INC.URBAIN DESIGNTOPFLIGHT SPECSSAYLOR CONSULTINGJANET NOLAN & ASSOCIATES
RANDALL MUSEUM RENOVATIONSAN FRANCISCO ARTS COMMISSIONCIVIC DESIGN REVIEWSCHEMATIC DESIGN PLA/KRA JOINT VENTURE
PROJECT LOCATION - AERIAL MAPS
RANDALL MUSEUM RENOVATIONSAN FRANCISCO ARTS COMMISSIONCIVIC DESIGN REVIEWSCHEMATIC DESIGN PLA/KRA JOINT VENTURE
SITE CONDITIONS - VIEWS FROM SITE
RANDALL MUSEUM RENOVATIONSAN FRANCISCO ARTS COMMISSIONCIVIC DESIGN REVIEWSCHEMATIC DESIGN PLA/KRA JOINT VENTURE
EXISTING LOWER LEVEL PLAN PROPOSED LOWER LEVEL PLAN
AREA OF IMPROVEMENT
PROGRAM TO BE RELOCATED
NEW PROGRAM
BOILERB24
TRAIN EXHIBITB24
GARAGE RAMPB23
TRAIN SHOPB08
TRAIN ROOMB14
CULTURE ROOMB16
WC-MB17
JANB21
GEOLOGYB12
WC-WB12
GEOLOGYB13
ZOOLOGYB06
BUCKLEY ROOMB05
PANTRYB10
KITCHENB11
STORAGEB22
SCIENCE LABB07
HALLB09
STORAGE
STORAGE
1218 SQ. FT.
661 SQ. FT.
2092 SQ. FT.
614 SQ. FT.
445 SQ. FT.
417 SQ. FT.
176 SQ. FT.
67 SQ. FT.
62 SQ. FT.
169 SQ. FT.
365 SQ. FT.
292 SQ. FT.
1272 SQ. FT.
1031 SQ. FT.
560 SQ. FT. 150 SQ. FT. 142 SQ. FT.
WC-WB20 WC-M
B1956 SQ. FT.57 SQ. FT.
588 SQ. FT.
GARAGE RAMPB23
TRAIN SHOPB08
TRAIN ROOMB14
WC-WB20 WC-M
B19
HALL
BOILERB24
RAILROAD EXHIBITB24
CULTURE ROOMB16
WC-MB17
WC-WB12
ZOOLOGY
CERAMICS
ART CURATORSCIENCE OFFICE
SCIENCE CLASSROOM
EXHIBIT GALLERY
EXHIBIT/TEACHING RM.
1027 SQ. FT.
270 SQ. FT.
295 SQ. FT.
463 SQ. FT.
1116 SQ. FT.
121 SQ. FT.
273 SQ. FT.
743 SQ. FT.
661 SQ. FT.
STOR.61 SQ. FT.
ELEV. LOBBY
258 SQ. FT.
CERAMIC OFFICE
OPENING ABOVE
JAN./STORAGE
113 SQ. FT.
STORAGE
1800 SQ. FT.
714 SQ. FT.
174 SQ. FT.
76 SQ. FT.
131 SQ. FT.
56 SQ. FT.57 SQ. FT.
613 SQ. FT.
HALL
445 SQ. FT.
RELOCATED (E) KILN
HALL/EXHIBIT
676 SQ. FT.
D.F.
300 SQ. FT.
FREEZERFREEZER
W/D
CHANGINGSTATION
CHANGINGSTATION
VESTIBULE
96 SQ. FT.
PROPOSED ELEVATOR
RANDALL MUSEUM RENOVATIONSAN FRANCISCO ARTS COMMISSIONCIVIC DESIGN REVIEWSCHEMATIC DESIGN PLA/KRA JOINT VENTURE
EXISTING GROUND FLOOR PLAN PROPOSED GROUND FLOOR PLAN
DN
(E) TODDLER204 (E) STOR.
212(E) WC
202
(E) WC203
(E) WOODSHOP101
(E) MUSEUM DIRECTOR'S OFFICE(E) WOODSHOP OFFICE103
(E) STOR.105
(E) GREEN ROOM232
(E) THEATER 230
(E) STAGE230A
LOBBY201
(E) THEATER STORAGE233
(E) THEATER TRAILER234
LIVE ANIMAL211
RECEPT./STORE
(E) SHOP ANNEX
445 SQ. FT. 2092 SQ. FT.
385 SQ. FT.
366 SQ. FT.
50 SQ. FT.
91 SQ. FT.
2170 SQ. FT.
353 SQ. FT.223 SQ. FT.122 SQ. FT.87 SQ. FT.
61 SQ. FT.
153 SQ. FT.
349 SQ. FT.
UP
REGISTRAR206
SCIENCE ED.207
ART CURATOR208
STOR.216
JAN. CLOS.215
STOR.217
LIVE ANIMIAL STAFF210
DOCENT ANIMALS/DOCENT LIVE ANIMAL STAFF220
STOR./MAINT.222
LIVE ANIMIAL CURATOR209
STOR.213
STOR.217
ART STOR.117
ART115
CERAMICS OFFICE112
CERAMICS STOR.113
CERAMICS110
LUNCH/CONF.205
ANIMAL KITCHEN214
GREENHOUSE235
DN
RAMP
RAMP
DN
DN
RAMP
RAMP
DN
COURTYARD
41 SQ. FT.
367 SQ. FT. 297 SQ. FT. 218 SQ. FT.
234 SQ. FT.
130 SQ. FT.
173 SQ. FT.
175 SQ. FT.
235 SQ. FT. 130 SQ. FT.
38 SQ. FT.
2028 SQ. FT.
1476 SQ. FT.
356 SQ. FT.
284 SQ. FT.
625 SQ. FT.
97 SQ. FT. 62 SQ. FT.
879 SQ. FT.
50 SQ. FT.
37 SQ. FT.
MAIL/COPIER/STORAGE207
197 SQ. FT.
85 SQ. FT.EXHIBIT
336 SQ. FT.
DN
DNDN
DN
DN
DN
DN
DN
DN
DN
DN
(E) TODDLER204 (E) STOR.
212(E) WC
202
(E) WC203
(E) WOODSHOP101
SHOP MANAGER(E) WOODSHOP OFFICE103
(E) STOR.105
RAMP
RAMP
RAMP
RAMP
(E) GREEN ROOM232
(E) THEATER 230
(E) STAGE230A
LOBBY201
ART115
KITCHEN
BUCKLEY ROOM
TERRACE ROOM205
(E) THEATER STORAGE233
(E) THEATER TRAILER234
COURTYARD
LIVE ANIMAL211
131 SQ. FT.
142 SQ. FT.
2228 SQ. FT.
STORAGE
PRINT SHOP/STORAGE117
CONCESSION
252 SQ. FT.
LIVE ANIMAL CURATOR OFFICE
360 SQ. FT.
RECEPT./STORE
638 SQ. FT.
UPDN
DOCENT ANIMALS RANDALL ROOM
(E) ENTRY
876 SQ. FT.
163 SQ. FT.
1378 SQ. FT.
JAN./STORAGE
QUAIL RUN
47 SQ. FT.
193 SQ. FT.
FLOOR OPENING
SKYLIGHT ABOVE(SHOWN DASHED)
NEW METAL GRATING
590 SQ. FT.
57 SQ. FT.
UP
HALL
ELEV. LOBBY
(E) SHOP ANNEX
CLOS.
197 SQ. FT.
445 SQ. FT. 2092 SQ. FT.
385 SQ. FT.
366 SQ. FT.
50 SQ. FT.
91 SQ. FT.
2170 SQ. FT.
353 SQ. FT.223 SQ. FT.122 SQ. FT.87 SQ. FT.
61 SQ. FT.
81 SQ. FT.
153 SQ. FT.
349 SQ. FT.
NEW EXIST STAIR
EXHIBIT HALL
860 SQ. FT.
268 SQ. FT.
112 SQ. FT.
12'-0"
STORAGE
ANIMAL KITCHEN57 SQ. FT.
163 SQ. FT.
TREATMENT AREA/STUDY STATION/FIRST AIDREQUIRES COUNTER AND SINK
SHELVING
FRID
GE
(E) BOILER FLUE
NEW GRATING OVER AREAWAY
24'-3"
2'-5"
AREA OF IMPROVEMENT
PROGRAM TO BE RELOCATED
NEW PROGRAM
PROPOSED ELEVATOR
PROPOSED EXIT STAIR
RANDALL MUSEUM RENOVATIONSAN FRANCISCO ARTS COMMISSIONCIVIC DESIGN REVIEWSCHEMATIC DESIGN PLA/KRA JOINT VENTURE
EXISTING MEZZANINE PLAN PROPOSED MEZZANINE PLAN
THEATER 230
RANDALL ROOM303
STORAGE307
HALL306
PROJECTION308
FRIENDS OFFICEOFFICE
DN
MECH.310 ROOF
ROOF
ROOF
WC1304
WC2305
(E) THEATER 230
MAIL/COPIER AREA307
HALL
(E) PROJECTION308(E) MECH.
310 (E) ROOF
(E) ROOF
(E) ROOF
UNISEX R.R.
DN
NEW SKYLIGHT
OFFICEOFFICE
STORAGE
204 SQ. FT.
OFFICE
REGISTRAR307
144 SQ. FT.
58 SQ. FT.
118 SQ. FT.
147 SQ. FT.96 SQ. FT.
128 SQ. FT.
DN
DN
NEW EXIT STAIR
445 SQ. FT.
392 SQ. FT.
(E) STORAGE
44 SQ. FT.
COPIER
CONF. RM.
45 SQ. FT.
199 SQ. FT.
AREA OF IMPROVEMENT
PROGRAM TO BE RELOCATED
PROGRAM TO BE RELOCATED
PROPOSED ELEVATOR
PROPOSED EXIT STAIR
RANDALL MUSEUM RENOVATIONSAN FRANCISCO ARTS COMMISSIONCIVIC DESIGN REVIEWSCHEMATIC DESIGN PLA/KRA JOINT VENTURE
EXISTING ROOF PLAN PROPOSED ROOF PLAN
SLOPE
SLOPE
SLOPE
SLOPE SLOPE
SLOPE
SLOPE
SLOPE
10'-0"
8'-3" ELEVATOR
OVERRUN 2'-0"ABOVE EXISTINGROOF
AREA OF IMPROVEMENT
PROGRAM TO BE RELOCATED
NEW PROGRAM
PROPOSED ELEVATOR
RANDALL MUSEUM RENOVATIONSAN FRANCISCO ARTS COMMISSIONCIVIC DESIGN REVIEWSCHEMATIC DESIGN PLA/KRA JOINT VENTURE
PROPOSED QUAIL RUN LOCATION
QUAIL RUN DIMENSIONS:24’-3” W x 2’-5” D x 4’-0” H
RANDALL MUSEUM RENOVATIONSAN FRANCISCO ARTS COMMISSIONCIVIC DESIGN REVIEWSCHEMATIC DESIGN PLA/KRA JOINT VENTURE
PROPOSED ELEVATOR LOCATION
ELEVATOR OVERRUN DIMENSIONS:10’-0” W x 8’-3” D x 2’-0” H
36
DN
DN
UP
UP
1253 SF
BUCKLEYROOM
B05
279 SF
ZOOLOGYB06
576 SF
SCIENCE LABB07
450 SF
TRAIN SHOPB08
591 SF
LOWER LOBBYB09
145 SF
KITCHENB10
173 SF
PANTRYB11
171 SF
GEOLOGYB13
214 SF
GEOLOGYB12
2100 SF
TRAIN ROOMB14
637 SF
RAILROADEXHIBIT
B15
402 SF
CULTURE ROOMB16
179 SF
WC-MB17
166 SF
WC-WB18
55 SF
WC-MB19
51 SF
WC-WB20
69 SF
JANB21
1014 SF
STORAGEB22
727 SF
GARAGE RAMPB23 1178 SF
BOILERB24
UP
UPUP
Existing - Level 0
37
STARKWEATHERBONDY architecture LLP
UP
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
UP
UP
DN
343 SF
LUNCH/CONF.205
220 SF
ART CURATOR208
303 SF
SCIENCE ED207
373 SF
REGISTRAR206
2575 SF
THEATER230
361 SF
GREEN ROOM232
353 SF
TODDLER204
50 SF
WC203
80 SF
WC202
40 SF
STO.216
37 SF
STO.215
201
SF
GR
EE
NH
OU
SE
235
131 SF
WOODSHOPOFFICE
10392 SF
STO.105 871 SF
CERAMICS110
635 SF
ART115
100 SF
CERAMICSSTORAGE
11369 SF
CERAMICSOFFICE
112
280 SF
ART STO.117
2081 SF
WOODSHOP101
358 SF
SHOP ANNEX102
2105 SF
LIVE ANIMAL211
134 SF
LIVE ANIMALSTAFF
210177 SF
ANIMALKITCHEN
214
180 SF
DOCENTANIMALS /
DOCENTS / LIVEANIMAL STAFF
223 240 SF
STO/MAINT.222
133 SF
LIVE ANIMALCURATOR
209
40 SF
STO.213
239 SF
MUSEUMDIRECTOR
104
153 SF
THEATERSTORAGE
233
350 SF
THEATERTRAILER
234
1971 SF
LOBBY201
51 SF
STO.212
51 SF
STO.217
UP
UP
Existing - Level 1
38
DN
DN
DN
730 SF
RANDALL ROOM303130 SF
FRIENDSOFFICE
302
93 SF
WC2305
125 SF
STORAGE307
154 SF
PROJECTION308
67 SF
WC1304
444 SF
MECH310
400 SF
HALL306
Existing - Level 2
40
DN
UP
679 SF
BOILERB24A
55 SF
WC-MB19
51 SF
WC-WB20
290 SF
CULTURE ROOMB16
236 SF
WC-MB17
208 SF
WC-WB18
2100 SF
TRAIN ROOMB14
450 SF
TRAIN SHOPB08
160 SF
JAN./MAINT.B12
72 SF
SEISM.B13
309 SF
ZOOLOGYB06
995 SF
BUCKLEYROOM
B05
695 SF
SCIENCE LABB07 310 SF
KITCHENB11
139 SF
STORE /PANTRY
B10
413 SF
DISPLAY HALLB22B
637 SF
RAILROADEXHIBIT
B15
727 SF
GARAGE RAMPB23
412 SF
GEOLOGYB22A
801 SF
LOWER LOBBYB09
289 SF
STO.B24B
185 SF
SCIENCEOFFICEB24C
117 SF
STO.B25A
61 SF
ELEV.210A
176 SF
GEOLOGYB25B
REMOVECOLUMN
UP
UPUP
Phase 1 Construction - Level 0
(N) WALL
(E) WALL
AREA OF WORK
41
STARKWEATHERBONDY architecture LLP
UP
DN
DN
DN
DN
DN
DN
DN
DN
DN
UP
UP
DN
343 SF
LUNCH/CONF.205
157 SF
LIVE ANIMALCURATOR
208226 SF
ART CURATOR207
173 SF
REGISTRAR206A
2575 SF
THEATER230
361 SF
GREEN ROOM232
353 SF
TODDLER204
50 SF
WC203
80 SF
WC202
201
SF
GR
EE
NH
OU
SE
235
131 SF
WOODSHOPOFFICE
10392 SF
STO.105 871 SF
CERAMICS110
635 SF
ART115
100 SF
CERAMICSSTORAGE
11369 SF
CERAMICSOFFICE
112
280 SF
ART STO.117
2080 SF
WOODSHOP101
358 SF
DUST-FREESHOP102
2488 SF
LIVE ANIMAL211
61 SF
ELEV.210A
266 SF
ANIMALKITCHEN /
MAINT.209
239 SF
MUSEUMDIRECTOR
104
153 SF
THEATRESTORAGE
233
350 SF
THEATRETRAILER
234
1971 SF
LOBBY201
255 SF
DOCENTANIMALS /DOCENTS /
SUMMER CAMP206C
51 SF
STO.212
51 SF
STO.217
226 SF
SCIENCE ED.206B
158 SF
TREATMENT /LIVE ANIMAL
STAFF210B
STUDY
STUDY
QUAIL RUN
STUDY
C
UP
UP
(N) OPENER
37 SF
STO.215
Phase 1 Construction - Level 1
(N) WALL
(E) WALL
AREA OF WORK
42
DN
DN
DN
730 SF
RANDALL ROOM303130 SF
FRIENDSOFFICE
302
75 SF
WC305
125 SF
STORAGE307
154 SF
PROJECTION308
61 SF
ELEV.210A
444 SF
MECH310
400 SF
HALL306
Phase 1 Construction - Level 2
(N) WALL
(E) WALL
AREA OF WORK
48
THEATER230
LOBBY201
LIVE ANIMAL211
PROJECTION308
MECH310
TRAIN SHOPB08
TRAIN ROOMB14 STORAGE
B22
BUCKLEYROOM
B05
LIVE ANIMAL211
LOBBY201
GREEN ROOM232
PANTRYB11
KITCHENB10
SCIENCE LABB07
BOILERB24
RAILROADEXHIBIT
B15
GARAGE RAMPB23
Existing - Sections
Section B
Section A
49
STARKWEATHERBONDY architecture LLP
THEATER230
SHOP ANNEX102
TRAIN ROOMB14
GARAGE RAMPB23
WC2305
RANDALL ROOM303
ART CURATOR208
LOBBY201
GEOLOGYB12
BOILERB24
STORAGEB22
Existing - Sections
Section D
Section C
50
LOBBY201
STO.B24BBOILER
B24A
RAILROADEXHIBIT
B15
GARAGE RAMPB23
GREEN ROOM232
LIVE ANIMAL211
STORE /PANTRY
B10KITCHEN
B11SCIENCE LAB
B07LOWER LOBBY
B09
SCIENCEOFFICEB24C
THEATER230
MECH310
TRAIN SHOPB08
TRAIN ROOMB14
GEOLOGYB22A
DISPLAY HALLB22B
BUCKLEYROOM
B05
LIVE ANIMAL211
LOBBY201
PROJECTION308
Phase 2 Construction - Sections
Section B
Section A
RANDALL ROOM344
TRAIN ROOMB14
THEATER230
GARAGE RAMPB23
GREENROOM /THEATEROFFICE
244DUST-FREE
SHOP102
MUSEUMDIRECTOR
303C
ANIMALCURATOR
208
JAN./MAINT.B12
WC-WB18
STO.B24B
SCIENCEOFFICEB24C
LOBBY201
GEOLOGYB22A
WC305