Transcript
Page 1: R1 DS-DM Annual Mean Change NO (ug/m3 2 R2 R3 BIRNAM R4 … · DS-DM Annual Mean Change NO2 (ug/m3) 0.0 - 0.5 0.5 - 1.0 1.0 - 1.5 1.5 - 2.0 2.0 - 2.9 Drawin g Title Drawin g Status

BANKFOOT

LUNCARTY

A9

A9

STANLEY

MURTHLY

BIRNAM

R9

R8R7

R6

R5

R3

R2R1

R24R23 R22 R21

R20R18

R17 R16

R15R14

R13R12 R11

R19*

R4

R10

?

N

0 0.5 1 1.5 20.25 KilometresReproduced by permssion of Ordnance Survey on behalf of HMSO. © Crown copyright and database right 2013. All rights reserved. Ordnance Survey Licence number 100046668.

Legend Modelled Road Links

DS-DM Annual Mean Change NO2 (ug/m3)0.0 - 0.50.5 - 1.01.0 - 1.51.5 - 2.02.0 - 2.9

Drawing Title

Drawing Status

Drawing No.Client No.

This drawing is not to be used in whole in or part other than for the intended purposeand project as defined on this drawing. Refer to the contract for full terms and conditions.

FIGURE 14.4

FINALScale @A3Jacobs No.

DO NOT SCALEB15576021:50,000

Modelled Opening Year (2019) NO2 Results:Change Due to the Proposed Scheme

SHEET 1 of 1

Rev 0

FIGURE 14.4

Significance Criteria (IAN 174/13, June 2013)Large >4Medium > 2 to 4Small > 0.4 to 2Negligible 0 to 0.4

Annual mean NO2 Air Quality Objective = 40 ug/m3

DM = Do Minimum ScenarioDS = Do Something Scenario

Proposed Scheme(DMRB Stage 3 Design)

95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 204 2511 Fax:+44(0)141 226 3109

www.jacobs.com

Project

Client

A9 Dualling: Luncarty to Pass of Birnam

Drawn Check'd Appr'dPurpose of revisionRev. Date Rev'dRMES Publication0 MAR 2014 NB AGJenC

Top Related