PPT C Shift Quarterly Summary Report:
Tracked 295.5 hours of training. (Training for techs have increased)
Completed 12 Safety Projects for the quarter.
Overall, there was a 0% Overtime Un-fulfillment.
Requested 246 hours overtime.
LOTO completion was 100%
No EICC violations
Team Morale improvement
New ways/project to improve Overall and P1 Availabilities
04/17/232
Wafer PPT C Shift Ops
![Page 3: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/3.jpg)
04/17/233
Wafer PPT C Shift Ops
FY14 Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May JuneFY15
AverageFY15 Goals
Overall Availability 89.5% 88.3% 88.9% 88.8% 87.5% 88.7% 84.6% 87.8% 90.0%P1 Availability 88.9% 88.3% 88.6% 86.3% 88.3% 88.6% 84.3% 87.4% 88.2%Fulfillment 63.9% 54.4% 58.7% 60.0% 59.6% 59.5% 45.4% 56.3% 60.0%Wrench Time 67.2% 69.7% 60.8% 60.6% 53.7% 63.4% 60.2% 61.4% 52.0%Tech Hours 127.3 116.3 129.4 137.3 129.9 129.6 114.3 128.1 130.0
FY14 Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May JuneFY15
AverageFY15 Goals
Overall Availability 89.5% 88.3% 88.9% 88.8% 87.5% 88.7% 84.6% 87.8% 90.0%P1 Availability 88.9% 88.3% 88.6% 86.3% 88.3% 88.6% 84.3% 87.4% 88.2%Fulfillment 63.9% 54.4% 58.7% 60.0% 59.6% 59.5% 45.4% 56.3% 60.0%Wrench Time 67.2% 69.7% 60.8% 60.6% 53.7% 63.4% 60.2% 61.4% 52.0%Tech Hours 127.3 116.3 129.4 137.3 129.9 129.6 114.3 128.1 130.0
# 1 # 2 # 3 # 4
FY14 Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May JuneFY15
AverageFY15 Goals
Overall Availability -1.0% -1.0% -1.0% -1.3% -2.6% -1.3% -2.0% -1.5% 90.0%P1 Availability -0.4% 0.1% 0.1% -0.4% 0.1% 0.6% -0.5% 0.0% 88.2%Fulfillment 5.6% -2.4% -0.3% 4.8% 0.3% 0.3% 2.3% 0.8% 60.0%Wrench Time 15.9% 10.8% 8.2% 9.5% 4.2% 9.5% 7.1% 8.2% 52.0%Tech Hours 3.4 -2.8 10.2 15.7 3.8 3.6 -3.8 6.4 130.0
PPT Stop Light Chart (C shift)
Meet Goal Within 1% of Goal Missing Goal
Shift Comparison (C shift)
Delta from Average (A, B, D shifts)
On or Above Average Within 1% of Average > 1% Below Average
![Page 4: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/4.jpg)
Overall Availability Comments
Wafer PPT C Shift Ops
In October, missed P1 availability goal by 2.5 points.
In November, missed P1 available goal by 1.3 points.
In December, missed P1 availability goal by 5.4 points.
![Page 5: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/5.jpg)
P1 Availability Comments
Wafer PPT C Shift Ops
In October, P1 availability goal was exceeded by 0.1 point.
In November, P1 available goal was exceeded by 0.4 points.
In December, missed P1 availability goal by 3.9 points.
![Page 6: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/6.jpg)
Fulfillment Comments
Wafer PPT C Shift Ops
In October, fulfillment goal was missed by 0.4 points.
In November, fulfillment goal was missed by 0.5 points.
In December, fulfillment goal was missed 14.6 points.
![Page 7: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/7.jpg)
Wrench Time Comments
Wafer PPT C Shift Ops
In October, wrench time goal was exceeded by 1.7 points.
In November, wrench time goal was exceeded by 11.4 points.
In December, wrench time goal was exceeded by 8.2 points.
![Page 8: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/8.jpg)
Tech Hour Comments
Wafer PPT C Shift Ops
In October, tech hours goals were missed by0.1 point.
In November, tech hours goals were missed by 0.4 points.
In December, tech hours goals were missed by 15.3 points.
![Page 9: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/9.jpg)
04/17/23 Page 9Wafer OPS Package Q4 2014
Metric
Current Montly Goals July August September Q115 October November December Q215
PPT P1 Availability88.2% 88.5% 88.7% 86.1% 87.7% 88.8% 88.6% 85.7% 87.9%
PPT Overall Availability90.0% 88.2% 89.1% 88.6% 88.7% 88.4% 88.7% 86.7% 87.9%
Moves / Tech Hour82.5 91.1 89.2 85.0 88.1 89.2 85.0 83.9 85.7
Equipment Fulfillment60.0% 54.4% 58.7% 60.0% 57.8% 59.6% 59.5% 45.4% 54.8%
Tech Misprocess Events >50 0 0 0 0 0 0 0 0
Safety Project Completions3 0.0 3.0 1.0 4.0 2.0 3.0 4.0 9.0
EICC Non-Compliance0 0 0 0 0 0 0 0 0
LOTO (Technicians)100% 100% 100% 100% 100% 100% 100% 100% 100%
0 Injuries / Incidences0 0 0 0 0 0 0 0 0
Cost Savings / Avoidance$3,000 $0 $0 $0 $0 $7,668 $0 $0 $7,668
BE Project Completion1 0 0 0 0 0 0 0 0
BE Technician Participation20% 18.0% 18.0% 18.0% 18.0% 22.0% 23.0% 30.0% 20.0%
Tech Training Hours240 28.0 33.0 68.0 129.0 132.0 81.0 82.5 295.5
1 on 1 Tech Meeting33 11 0 0 0 11 11 11 33
Most of our tech training hours came from the test and plate area. Cost saving was done on a SET tool. Old part was rebuild with the help of engineer
instead of purchasing new part. Three techs from Plate, Test and Photo worked with engineering on various projects. We have not had any misprocess greater than 5 for the quarter.
![Page 10: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/10.jpg)
Morale Amongst Team Members is improving.
04/17/23 Page 10Wafer OPS Package Q4 2014
Some of the team members are beginning to take initiatives without been told.I have been receiving suggestions as how to improve our overall availability and P1 availability .There is cohesiveness among team members, and everyone is working together. Team members that are free, are helping other members that are busy without being told.Team members are letting me know ahead of time situations that might hinder our goals. Example: Long production tool quals.
![Page 11: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/11.jpg)
Other ways to improve Availability. (P1 and Overall)
04/17/23 Page 11Wafer OPS Package Q4 2014
Fab Production Managers need a dashboard that shows tools that are down to qual.
A paging system needs to be put in place to alert Production Managers about long downed tools.
Paging system could start paging after 4 hours when tool is down to qual.
Some Fab Production managers already welcome the idea of a
qual tools dashboard.
![Page 12: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/12.jpg)
PPT – Maintenance Dashboard
04/17/23 Page 12Wafer OPS Package Q4 2014
![Page 13: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/13.jpg)
An example of tools waiting for production quals.
04/17/23 Page 13Wafer OPS Package Q4 2014
Date: 01/22/15
![Page 14: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/14.jpg)
More examples
04/17/23 Page 14Wafer OPS Package Q4 2014
Date: 01/23/15
![Page 15: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/15.jpg)
Last Ops we tracked 129 hours.Current Ops we tracked 295.5 training hours. I am currently ramping up cross training. Example: Some technicians in photo are training on tools Plate or Test and vice
versa. Experienced Technicians are helping/training the inexperience Technicians on tool
during repair.
Training for Technicians have increased.
04/17/23 Page 15Wafer OPS Package Q4 2014
![Page 16: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/16.jpg)
In conclusion
04/17/23 Page 16Wafer OPS Package Q4 2014
![Page 17: Q2FY15 C-Shift PPT OPs - Edward.ppt-1-30](https://reader031.vdocuments.site/reader031/viewer/2022032513/55d03fafbb61eb6c478b461b/html5/thumbnails/17.jpg)
The End
04/17/23 Page 17Wafer OPS Package Q4 2014