PROVISIONAL SETTLEMENT FOR WORK-ERS ON SECOND BLOCK OF NUCLEAR POWER STATION KRŠKO, TIPOLOGY AStudents: Ambrož Bartol, Danaja Jovandič, Blažka Sevčnikar, Maja VolkMentors: prof. Miloš Florijančič, doc. dr. Matej Blenkuš, doc. Mitja ZorcLjubljana Faculty of Architecturephotographer: Miran Kambič

Project deals with the issue how a possibly controversial inter-vention, through the mutual involvement of various interests groups and the use of local resources, can be seen as an op-portunity for renewal and further development of the municipal-ity of Krško. Intervention is not designed only as a temporary workers’ settlement, but also deals in depth with the long term development of the site. Tipology A, built in prefabricated pa-per elements produced in the local paper mill, is an example of a completely removable facility. Transparent roof provides uniform illumination to a hall like space which provides work-ers with a feeling of living in a tribal community.

3000 workers

3000 workers8000 inhabitons

Settlement is placedinsede the city to avoid

ghettoization

Through cooperative farming workers’ settle-ment can be supplied with local products.

Prefabricated cartboard elements, produced in a local paper mill, are

used as building mate-rial for the settlement.

Elements can be 100% recycled and reused.

After workers had left, city would still hold a sense of a connected

whole.

would become recogni-zeble, and being able to pentrate on the foregin

market

Farmers are united un-der a common brand.

Romoval of the housing. Land can be freely adapted to later require-

ments of the site.

Newly formed public spac-es encourage socialisation, which gradualy creates a

connected community.

tipology A tipology I tipology U

a modular unit3 x 6 x 3 m

prefabricated modular furniture unit

DIVISION OF PRIVATE AND COMMON / PUBLIC SPACE

DIFFERENT CULTURAL STRUCTURE

common areas

typology A

typology I

typology I

70 workers

165 workers

physical privacy

4 supervisiorswith families

physical privacy

60 supervisiors

300supervisiors

2700regular workers

visual privacy

70 regular workers

physical privacy

165 regular workers

SORFACE AREAgross = 1300 m²

SORFACE AREAgross = 2700 m²

SORFACE AREAgross = 2700 m²

sleeping/livingquarters

toilets

communications

construction