Transcript
Page 1: Proposed Requin Estate Housing Project

Requin Estate Housing ProjectALVA PETER JAMES

Jim Baptiste

RJC.

-

Jan, 2012

3 - ALL DISCREPANCIES TO BE REFERRED TO THE ARCHITECT PRIOR TO COMMENCEMENT OFWORK

2 - THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ENGINEER'S DRAWINGS ANDOTHER RELEVANT SERVICES

1 - ALL DIMENSIONS TO BE VERIFIED ON SITE

APJ.

Jim Baptiste/adbc

St. David

SITE MASTER PLAN

A-01

3/16"-1'

Page 2: Proposed Requin Estate Housing Project

Requin Estate Housing ProjectALVA PETER JAMES

Jim Baptiste

RJC.

-

Jan, 2012

3 - ALL DISCREPANCIES TO BE REFERRED TO THE ARCHITECT PRIOR TO COMMENCEMENT OFWORK

2 - THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ENGINEER'S DRAWINGS ANDOTHER RELEVANT SERVICES

1 - ALL DIMENSIONS TO BE VERIFIED ON SITE

APJ.

Jim Baptiste/adbc

St. David

TYPICAL FLOOR PLAN

A-02

3/16"-1'

Page 3: Proposed Requin Estate Housing Project

Requin Estate Housing ProjectALVA PETER JAMES

Jim Baptiste

RJC.

-

Jan, 2012

3 - ALL DISCREPANCIES TO BE REFERRED TO THE ARCHITECT PRIOR TO COMMENCEMENT OFWORK

2 - THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ENGINEER'S DRAWINGS ANDOTHER RELEVANT SERVICES

1 - ALL DIMENSIONS TO BE VERIFIED ON SITE

APJ.

Jim Baptiste/adbc

St. David

NORTH ELEVATION

A-03

3/16"-1'

Page 4: Proposed Requin Estate Housing Project

Requin Estate Housing ProjectALVA PETER JAMES

Jim Baptiste

RJC.

-

Jan, 2012

3 - ALL DISCREPANCIES TO BE REFERRED TO THE ARCHITECT PRIOR TO COMMENCEMENT OFWORK

2 - THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ENGINEER'S DRAWINGS ANDOTHER RELEVANT SERVICES

1 - ALL DIMENSIONS TO BE VERIFIED ON SITE

APJ.

Jim Baptiste/adbc

St. David

WEST ELEVATION

A-04

3/16"-1'

Page 5: Proposed Requin Estate Housing Project

Requin Estate Housing ProjectALVA PETER JAMES

Jim Baptiste

RJC.

-

Jan, 2012

3 - ALL DISCREPANCIES TO BE REFERRED TO THE ARCHITECT PRIOR TO COMMENCEMENT OFWORK

2 - THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ENGINEER'S DRAWINGS ANDOTHER RELEVANT SERVICES

1 - ALL DIMENSIONS TO BE VERIFIED ON SITE

APJ.

Jim Baptiste/adbc

St. David

SOUTH ELEVATION

A-05

3/16"-1'

Page 6: Proposed Requin Estate Housing Project

Requin Estate Housing ProjectALVA PETER JAMES

Jim Baptiste

RJC.

-

Jan, 2012

3 - ALL DISCREPANCIES TO BE REFERRED TO THE ARCHITECT PRIOR TO COMMENCEMENT OFWORK

2 - THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ENGINEER'S DRAWINGS ANDOTHER RELEVANT SERVICES

1 - ALL DIMENSIONS TO BE VERIFIED ON SITE

APJ.

Jim Baptiste/adbc

St. David

EAST ELEVATION

A-06

3/16"-1'


Top Related