Download - Project Plan -Butt Straps-dt 30th Dec 11
-
7/23/2019 Project Plan -Butt Straps-dt 30th Dec 11
1/10
MAINI Global Aerospace
Project Plan for RFQ-144 B(Butt Strap) t !"t# $ec 11%
WK 44
PO received
COS requested
Receipt of COS
Request for 3D model
Receipt of 3D model
Contract review against documents received. 39 39Contract review for 3D model. 39Clarification forwarded
Clarification received
Additional VMC ordered
Macine receipt! installed " commisioned
Standard gauge ordered.
Standard gauge receipt
#ngineering$ooling " %i&ture ordered.
$ooling " %i&ture received.
$emplates ordered
$emplates received
RM ordered )%A*R +, eac-RM dispatc)for %A*R parts +, eac-
RM receipt)for %A*R parts +, eac-
PO to AP*
RM ordered )Production-
RM dispatc)for production parts-
RM receipt)for production parts-
%A*R Macining
%A*R *nspection
%A*R Source inspection
%A*R dispatc to MA/01
%A*R approval from MA/01.
+st Production 2atc Macining.
+st Production 2atc source inspection.+st Production 7atc to AP*.
+st Production 7atc receipt AP*.
+st Production 2atc source inspection.
+st Production 2atc dispatc.
2uffer Stoc8.
Part 9um7er Models Drgs COS
/'4++6,, AVAILABLE AVAILABLE
/'4+4,,AVAILABLE AVAILABLE
/'4+4(,, AVAILABLE AVAILABLE
/'4+,, AVAILABLE AVAILABLE
/'5,, AVAILABLE AVAILABLE
/'''3,, AVAILABLE AVAILABLE
/'''',, AVAILABLE AVAILABLE
/''(,, AVAILABLE AVAILABLE
/''(6,, AVAILABLE AVAILABLE
/'(43',, AVAILABLE AVAILABLE
WK
43
WK
45
WK
46
WK
47
WK
48
WK
49
WK
50
Drgs toAP* witPO
MA/01PO:
RMPO :
RMSupplier
RM;t8++
+st 7atc >8+5 >8,
nd 7atc >8+' >8+
3rd 7atc >8+( >8
4t 7atc >8+6 >83
t 7atc >8, >84
5t 7atc >8+ >8
't 7atc >8 >85
(t 7atc >83 >8'