![Page 1: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/1.jpg)
Progress of Flood Monitoring & Assessment by Remote Sensing in China
China Institute of Water Resources &Hydropower Research(IWHR)
Li Jiren
2019.6
![Page 2: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/2.jpg)
TOPICS
1. Flood monitoring
2. Disaster assessment
3. Monitoring on water project for flood control
4. Flood forecasting and risk map
![Page 3: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/3.jpg)
China is suffered from flood disaster for a long history. So
Chinese government pays more attention to flood control.
Remote sensing technology has been used for flood
monitoring since1980, then disaster assessment, water
project monitoring, risk map making, and establishment1of
professional system were made step by step.
![Page 4: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/4.jpg)
1.Flood monitoring
Image Data Sources
1.Space satellite:Landsat 8,SPOT, Radarsat 2, Envisat、
Sentinel-1
GF-1, GF-2, GF-3, GF-4, GF-5, GF-6, ZY3-01, ZY3-02, ZY1-02C
ZY-04, BJ-2, JL-1
2.Air-born SAR 10,000~13,000m(all weather)
helicopter, unmanned plan
Real-time monitoring mainly depends on radar image
Background data from visible image
![Page 5: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/5.jpg)
Appropriatness evaluation for remote sensing data usually used
Data Landsat 8 SPOTNOAA/
AVHRR
GF-3
(domestic)
EOS/
MODISSentinel-1
Air-
born
SAR
Unmanned
plan
Revisit(d) 16 26 0.5 29 0.5 12 anytime anytime
All weather × × √ √√ × √√ × ×
Data obtain × × √ √ √√ √ √√ √√
Inundation
extent√√ √√ √√ √√ √√ √√ √√ √√
Water depth √ √ × √ × √ √ √
Duration × × √ — √ — — √√
Background data √√ √√ × √ × √ × ×
Water works
monitoring× × × × × × √√ √√
Disaster
assessment√ √ √ √ √ √ √ √
NOTE: √√very suitable √general suitable ×not suitable
1.Flood monitoring
![Page 6: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/6.jpg)
航空卫星通信系统
Real-time transmission system of air-born SAR
![Page 7: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/7.jpg)
Inundated oil-well
at Daqing in 1998
by this system
![Page 8: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/8.jpg)
Factors for monitoring:
Extent of inundation
Duration of inundation(successive monitoring)
Water depth and its spacial distribution with
the aid of DEM
![Page 9: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/9.jpg)
Flood monitoring & assessment system (software)
![Page 10: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/10.jpg)
系统总界面
雷达影像水体自动提取界面
淹没范围提取界面
![Page 11: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/11.jpg)
Dynamic Monitoring for
Monwa Detention Basin
2003.7.5 17:22
2003.7.7 6:11
2003.7.12 18:18
Water level:28.82m
蒙 洼
王家坝水位:28. 23m
蒙 洼
王家坝水位:28. 69m
蒙 洼
![Page 12: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/12.jpg)
上六方堤
下六方堤 石姚段
荆
山
瑚
洛河洼
2003年7月12日18时18分
2003年7月7日6时11分上六方堤
下六方堤 石姚段
荆
山
瑚
洛河洼
Dynamic Monitoring for
Jinshanhu Flooding Basin
![Page 13: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/13.jpg)
2003年7月7日6时11分
2003年7月12日18时18分
城西湖
塘垛湖邱
城
东
湖
家湖
城西湖
塘垛湖邱
城
东
湖
家湖
Dynamic Monitoring for the
Chendonghu Detention Basin
![Page 14: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/14.jpg)
Heilong River in August,2013
![Page 15: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/15.jpg)
Wuhan City in 2016
![Page 16: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/16.jpg)
。
Hubei and Anhui in 2016
![Page 17: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/17.jpg)
14 times monitoring for downstream of Yangtze River in 2016
![Page 18: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/18.jpg)
Shouguang, Shangdong in 2018
![Page 19: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/19.jpg)
Dammed lake of the Jinsha River in 2017 & 2018
![Page 20: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/20.jpg)
TOPICS
1. Flood monitoring
2. Disaster assessment
3. Security of Water Project for flood control
4. Flood forecasting and risk map
![Page 21: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/21.jpg)
Flood
characteristics unit
Social & economy
unit
Calculation unit
Depending on water depth, duration and inundated objects from
social & economic data base, the most difficult factor is loss rate.
2. Disaster assessment
LOSS
![Page 22: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/22.jpg)
![Page 23: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/23.jpg)
![Page 24: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/24.jpg)
Disaster loss evaluation model
Economic loss estimation is performed on the basis
of grid which is common for flood routing and
social-economic database.
On the basis of water depth, inundation
duration, inundation object and corresponding
loss rate, the capital loss is calculated.
N
jjn
i j k m n
jkmij eYARcapital )1(
![Page 25: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/25.jpg)
According to the inundation duration, the
loss due to stoppage of business is
calculated.
365/)1( DayseBLR N
j
i j
ijjbusi
![Page 26: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/26.jpg)
i j
jijdirectindirect KRR
N
jhistoricalrelief eRR )1(
![Page 27: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/27.jpg)
i
T bt
ibenifit dtaeUR0
benifitreliefindirectbusicapitaltotal RRRRRW
![Page 28: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/28.jpg)
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0 0m~0.5m 0.5m~1.5m 1.5m~2.5m 2.5m~3.5 大于3.5m
水深
损失率
农业部门
工厂企业
建筑业
货运仓储业
商业
Relation curve between loss rate and water
depth for different sector
![Page 29: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/29.jpg)
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0 1天 1~2天 3~4天 5~6天 7天以上
淹没时间
损失率
水稻
小麦
玉米
蔬菜
Relation curve between loss rate and
inundation duration for different crops
![Page 30: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/30.jpg)
TOPICS
1. Flood monitoring
2. Disaster assessment
3. Monitoring on water project for flood control
4. Flood forecasting and risk map
![Page 31: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/31.jpg)
Variation of river regime
Variation of river regime due to scour and filling of sedimentation,
also sand dredging may cause the change of flow direction, and threat
the security of dyke.
![Page 32: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/32.jpg)
雅江出境处——冲刷为主 布河卡齐兰加国家公园段——冲淤基本平衡 布河流向拐点处——冲刷为主
布河与恒河汇流处——冲淤基本平衡 入海口——淤积为主
Variation of river course
River course
variation of the
Yalouzhanbu
River from 1980
to 2013
![Page 33: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/33.jpg)
Monitoring of river regulation
2008年12月30日
。
![Page 34: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/34.jpg)
Monitoring of river regulation
2007年5月6日
2013年3月26日
![Page 35: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/35.jpg)
Monitoring on water project for flood control
B
B
R
R R
A
H
'Ar
M
S
Displacement and transformation of
dam by INSAR
Three Gorge Dam
![Page 36: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/36.jpg)
Monitoring on water project for flood control
Stability of dam
![Page 37: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/37.jpg)
Monitoring on water project for flood control
Revise of relation
curve between
Water level and
Storage of reservoir
by means of remote
sensing images
0
20
40
60
80
100
120
140
160
70 80 90 100 110 120 130 140
水库库容
(亿m3)
水位(m)
Shuifeng Reservoir(80m~131m)
![Page 38: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/38.jpg)
TOPICS
1. Flood monitoring
2. Disaster assessment
3. Monitoring on water project for flood control
4. Flood forecasting and risk map
![Page 39: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/39.jpg)
Flood forecasting and risk map
39
1) Input of flood forecasting system, including precipitation, initial
soil moisture content.
Doppler radar, TRMM, GPM, GPS-RS
![Page 40: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/40.jpg)
Flood forecasting and risk map
2)Parameter determination according to underlying
conditions from remote sensing.
3)Watershed hydrological model on the basis of both
water balance and energy balance, which is significant
for ungagged basin.
![Page 41: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/41.jpg)
Risk maps reveal the flood risk degree and distribution
characteristics under different flood scenarios in key flood control
areas of China.
Risk map which has been made covers 496000 km2, being occupied
48% of the risk region of whole country.
All basic data needed for making risk map are from remote sensing.
48%
![Page 42: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key](https://reader034.vdocuments.site/reader034/viewer/2022043022/5f3e157143f38d06ae43cd9d/html5/thumbnails/42.jpg)
198 rivers with the total length of 2700 km、45 important cities
78 Detention basins with the total area of 29000
km2
26 flood plains with the total area of 8800 km2
227 important area for flood detention with the
total area of 408100 km2