Download - Progress in LAB Progress in CLEX
![Page 1: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/1.jpg)
Progress in LAB Progress in CLEX
Anastasiya Solodko TMWG – Meeting, 3.05.2010
![Page 2: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/2.jpg)
Progress in LABInstallation of Test Modules in the building 162
2
The room is empty now
Before
After
![Page 3: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/3.jpg)
3
Progress in LABInstallation of Test Modules in the building 162
![Page 4: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/4.jpg)
4
Progress in LABInstallation of Test Modules in the building 162
![Page 5: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/5.jpg)
5
Two possibilities:1.Installation without moving PETS TANK(with present set-up)
2. Installation with moving PETS TANK upstream
Progress in CLEXSpace for installation of TM type 0
![Page 6: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/6.jpg)
6
PROBE BEAM LINE
REMOVE
REMOVE
Options Description We need Space Work
Option 1Move PETS TANK and all upstream components
upstream
PROBE BEAM:1.Removing the test area girder(2200mm)2.Remove Flash Box3.Vacuum Sector Valve, Orbit Corrector are placed on the upstream girder
PROBE BEAM:
2200 mm
Re-cabling of upstream components
Installation with moving PETS TANK upstreamHow we can obtain a free floor space for installation of Test Module type 0:
![Page 7: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/7.jpg)
How we can obtain a free floor space for installation of Test Module type 0:
7
Installation with moving PETS TANK upstream
DRIVE BEAM LINE MOVE
Options Description We need Space Work
Option 1/2Move PETS TANK and
all upstream components upstream
DRIVE BEAM:1. Use the free floor space (1620 mm)2. Move PETS TANK and all upstream
components upstream (1550 mm)3. Move downstream girders towards
BEAM DUMP (900mm)/ remove one Orbit Corrector and Pumping Pot and shorten girder (900 mm)
DRIVE BEAM:
2050 mm
• Move girdersRe-cabling components/Shorten girder
MOVE
![Page 8: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/8.jpg)
8
PROBE BEAM LINE
Installation with moving PETS TANK upstreamDRIVE BEAM LINE
(opt.1)
DRIVE BEAM LINE (opt.2)
![Page 9: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/9.jpg)
9
RE-CABLING
Progress in CLEXChallenges
CANAL FOR COOLING SYSTEM
COOLING PIPES
![Page 10: Progress in LAB Progress in CLEX](https://reader036.vdocuments.site/reader036/viewer/2022081420/5681665a550346895dd9da45/html5/thumbnails/10.jpg)
10
Progress in CLEX
Test Module type 0 integration into CLEX