Download - Proforma Empty
-
8/8/2019 Proforma Empty
1/201
Cost Management Questionnaire
BASIC INFORMATION
Region Name MTR BZN LAHORE
Type Of Building Office Exchange Store Other All
Name/ Address ofBuilding
Incharge Name
Designation ofIncharge
Contact Number
DG set operator
Switch Operation Development Transmissio
DDO
GM
SM
-
8/8/2019 Proforma Empty
2/201
Cost Management Questionnaire
SE
-
8/8/2019 Proforma Empty
3/201
Cost Management Questionnaire
-
8/8/2019 Proforma Empty
4/201
Cost Management Questionnaire
ANALYSIS OF RENT & SPACE UTILIZATION
Place is Rented YesNo
Monthly Rent (If rented)
Number of Floors
Approx. Number ofRooms
Approx. Number ofStrength
Officers of B-17 & Above
Assessment of Space
Utilization
Junk Materials/ stores Nil MinimalIn small
quantity
In sizablequantit
y
Use of Partitioning
Use of False Ceilings
Co-location arrangement
With
-
8/8/2019 Proforma Empty
5/201
Cost Management Questionnaire
Overall Assessment ofSpace Utilization
-
8/8/2019 Proforma Empty
6/201
Cost Management Questionnaire
-
8/8/2019 Proforma Empty
7/201
Cost Management Questionnaire
ANALYSIS OF SECURITY
Number of SecurityGuards
Nature of Duties At EntryPoints
WithinBuilding
At ParkingPlace
Others
Security NeedsAssessment
(Based on area & Installations)
High RiskModerate
RiskMinimal
RiskNo Risks
-
8/8/2019 Proforma Empty
8/201
Cost Management Questionnaire
Overall Assessment ofSecurity
ExcessSecuri
ty
As perrequirement
Belowrequirement
Urgent needfor more
-
8/8/2019 Proforma Empty
9/201
Cost Management Questionnaire
-
8/8/2019 Proforma Empty
10/201
Cost Management Questionnaire
ANALYSIS OF POWER
Number of MetersInstalled
Number Meters
Converted into A-2C present previou
Cumulative Bill Amount
-
8/8/2019 Proforma Empty
11/201
Cost Management Questionnaire
Last month bills paidwithin due date (No.)
-
8/8/2019 Proforma Empty
12/201
Cost Management Questionnaire
-
8/8/2019 Proforma Empty
13/201
Cost Management Questionnaire
ANALYSIS OF ACs
For Exchange Office Buildings
Quantity
Capacity More than 2Ton
Life more than 5 Years
-
8/8/2019 Proforma Empty
14/201
Cost Management Questionnaire
Overall Assessment ofACs
ExcessAs per
requirement
Belowrequirement
Urgent needfor more
-
8/8/2019 Proforma Empty
15/201
Cost Management Questionnaire
-
8/8/2019 Proforma Empty
16/201
Cost Management Questionnaire
ANALYSIS OF DG SETS
For Exchange Office Buildings
Quantity
Total Capacity of DG Set
Total Capacity of FuelTanks
Life more than 5 Years yes
Fuel Register readings date quantity Present Previous
1.Reading is in Hrs
2.Quantity is in Ltrs
3. Stock 970 ltrs.
ATS/ AMF Installed
-
8/8/2019 Proforma Empty
17/201
Cost Management Questionnaire
ATS/ AMF Working
-
8/8/2019 Proforma Empty
18/201
Cost Management Questionnaire
-
8/8/2019 Proforma Empty
19/201
Cost Management Questionnaire
ANALYSIS OF BATTERIES
EWSD ZTE DWDM PCM
Quantity
Overall Standby Capacity
Life/Age All are over 5 years, DWDM 2 years old
Type (Dry/ Liquid) Dry : Liquid :
In Working Condition Yes
Overall Assessment ofBatteries
ExcessAs per
requirement
Belowrequirement
Urgent needfor more
ANALYSIS OF VEHICLES
Vehicles Motor Cycles
Quantity
Vehicles more than 2000CC
Overall Assessment Excess
As per
requirement
Below
requirement
Urgent needfor more
ANALYSIS OF OFFICE EQUIPMENTS
PCs PRINTERSPHOTO
COPIERS
Plotters/Ammon
iaCopiers
Quantity
Overall Assessment ExcessAs per
requirement
Belowrequirement
Urgent needfor more
-
8/8/2019 Proforma Empty
20/20
Cost Management Questionnaire
ANALYSIS OF Switch Room
EWSD ZTE
Exchange capacity ALI
ALIS
Flags
OLT Details
Other Switch details 1
Other Switch details 2
Other data PCM, DWDM,
etc