Clorosur Technical Seminar & WCC Safety Workshop
Flávia Mariano Pinto
November 18, 2016
PROCESS SAFETY MANAGEMENT PROGRAM
UNIPAR CARBOCLORO
� Facility
� Cubatao, Sao Paulo - Brazil
� 1,000 metric tons chlorine/day
� In operation since April 1964
� Products
� Chlorine
� Caustic soda
� Hydrogen
� Hydrochloric acid
� Sodium hypochlorite
� EDC
HES MANAGEMENT
HES Principles “Golden” Rules
Occupational Safety and Health
Program
Process SafetyManagement Program
Environmental aspects are included within the 17 major
sections
1910.119 Process Safety Management of Highly Hazardous Chemicals
Comprehensive management program that integrated technologies, procedures, and
management practices. This section contains requirements for preventing or minimizing
the consequences of catastrophic releases of toxic, reactive, flammable, or explosive
chemicals. These releases may result in toxic, fire or explosion hazards.
CCPS
A management system that is focused on prevention of, preparedness for, mitigation of,
response to, and restoration from catastrophic releases of chemicals or energy from a
process associated with a facility.
WHAT IS PSM PROGRAM?
PREVENT
Let’s explore key points and plant practices in some
elements...
ELEMENT 1: SITE PLAN
Explains and defines the facility’s process safety management program.
� Site Plan is composed by:
� Technical Analysis
Define “covered areas”(Ex: Chlorine, EDC, etc)
� HHC substances
� Lead to undesirable events
� Employee Participation
Key point => Discipline, motivation, active participation
Examples:
� Employee role on each elements
� Accident Prevention Committee (National Regulation - NR 5)
SITE PLAN
ELEMENT 2: INFORMATION SHARING
Identifies how information will be made available while taking into consideration the
company’s trade secrets.
� Plant practices
� Community: Open Plant Program, Unipar Carbocloro Community Council
� Associations: ABIQUIM, ABICLOR, FIESP, CIESP e CHLORINE INSTITUTE, etc
� Employees and Contractors:
� Montlhy Safety Meeting (Ex: PSM)
� Incident Investigation
� Management of Change, etc
INFORMATION SHARING
ELEMENT 3: PROCESS SAFETY INFORMATION
Information to support the understanding and identification of hazards.
� Plant Process Safety Information
� Available to personnel involved in the process
� Information groups:
� Process Chemicals:
� Process Technology:
� Process Equipment:
� Operating Procedures (Electronic system)
PROCESS SAFETY INFORMATION
PROCESS HAZARD ANALYSIS
ELEMENT 4: PROCESS HAZARD ANALYSIS (PHA)
Identification of potential hazardous situations, understanding of the hazard scenario, and
perform risk evaluation.
� Plant procedure
� Review of:
� Design of existing facility, modifications, additions, new projects, incidents, etc
� Multidisciplinary team (Methodology + Process Expertise)
� Important aspects:
� Each part of the process
� Human factors, plant lay out, procedures, etc
� Checklists
� Layers of protection, Controls in place
PROCESS HAZARD ANALYSIS
� PHA plant practices:
� Methodology depends on the process (Hazop, What If, PHA, etc)
� QRA, Facility siting and consequence study are performed when required
� Recommendations: Risk Ranking (Matrix)
� Recommendations to MI Program
� Revalidation schedule
� PHA study and action plan presented to plant managers
� Share information
� Track recommendations
� Plant next steps:
� Working on method and frequency for revalidation based on the level of risk
� LOPA
MANAGEMENT OF CHANGE & PSSR
ELEMENT 5: MANAGEMENT OF CHANGE (MOC) & PSSR
Ensure changes to process are reviewed prior to implementation and do not inadvertently
introduce new hazards or increase risk of existing hazards. Changes to a process must be
thoroughly evaluated to fully assess their impact on employee safety and health and to
determine needed changes to operating procedures.
� Plant Procedure:
� Define change
� Categories: Administrative, Procedures and Process (Examples)
� Except for “Replacements in kind”
� Types of Changes: Permanent, Emergency or Temporary
� Specific practices: Temporary repairs, temporary bypass, temporary impairments,
etc
� MOC owner
MANAGEMENT OF CHANGE & PSSR
� MOC Plant Procedure:
� Technical basis are thoroughly reviewed
� Face-to-face discussions
� Hazard review
� Team depends on the type of change
� Documenting and tracking all activities (electronic system)
� Level of notification and training is observed
� Pre-Start Up Safety Review (team)
� Level of Authorization depends on complexity of change
� Important points:
� Identify changes (Training, procedure definition)
� Multidisciplinary analysis
� Manage Temporary Changes
OPERATIONAL TRAINING
ELEMENT 6: OPERATIONAL TRAINING
Ensure that operators have proper training and qualification
� Plant Training program
� 4 levels of operator positions
� New operator will start in the first level
� In each level the degree of complexity and responsibilities increases. The last level is
the DCS operator
� In each stage, training last 3 months at least
� In each stage refresher training: every 3 years
� Assessment consider technical and behavioral skills
� Includes all aspects of the operational procedures and safe work practices
� Provide employees with an understanding of hazards associated with their activities
PROCEDURES
ELEMENT 7: OPERATING PROCEDURES
Plant Procedures provides clear instructions to operate the plant.
� Items:
� Steps for each operating phase
� Safe limits
� Safety and health considerations
� Safe Work Practice
� Lessons Learned
� A electronic system is used to keep this information up-to-date.
� Reviewed and updated once a year, or as necessary.
ELEMENT 8: INCIDENT INVESTIGATION
PURPOSE:
� Identify root causes and system failures
� Propose corrective action plan in order to prevent reocurrence
� Learn from experience
� Facility has a formal program for HES incidents investigation, which includes:
� Criteria for incidents investigation and Severity classification
� Investigation of near misses
� RCA Team: Process knowledge + Methodology
� Development of RCA mentality � Not Just For HES Incidents!
� Communicate of findings
� Automated System
INCIDENT INVESTIGATION
Ensure that process equipment are designed, constructed, installed and maintained properly.
Plant Practices:
• Written procedures
• Training for maintenance
activities
• Inspection, testing, and repair
• Equipment deficiencies
management (SAP)
• Quality assurance (Ex:
Technical specifications, PMI)
Plant Practices:
• Written procedures
• Training for maintenance
activities
• Inspection, testing, and repair
• Equipment deficiencies
management (SAP)
• Quality assurance (Ex:
Technical specifications, PMI)
MECHANICAL INTEGRITY
ELEMENT 9: MECHANICAL INTEGRITY PROGRAM
� Training program for maintenance
personnel includes:
� Legal requirements
� Technical specific practices
(knowledge sharing sessions).
� Engineer team monitors deficiencies,
evaluates performance, and proposes
correction actions to MI program and
practices.
Maintenance
and
Inspection
Practices
Electrical equipment and systems
- Depends on the system: Detailed Inspection, Visual Inspection,
Oil Analysis, Electrical Tests, Thermography, Battery Tests
Rotating equipment
- ABC classification
- Vibration Analysis, Sensitive Maintenance, Oil Analysis.
Relief devices and vent systems
- Routine maintenance and applicable function tests for Relief
Devices in HHC service not to exceed 2 years, other Relief Devices
follows National Regulation NR13.
Pressure vessels
- Technical references for pressure vessels MI monitoring: API 510,
CI e NR13.
Emergency shutdown systems, control systems and alarms
- Frequency of tests and inspections follow recognized and
generally accepted engineering practices and evaluation of risk
associated to the loop (implementation in progress)
Storage tanks
- References: API 650/653
Piping systems and components
- References: API 570, Chlorine Institute and NR13
CONTRACTORS
ELEMENT 10: CONTRACTORS
Ensure that contractors have programs consistent with plant PSM.
� Plant procedures:
� Contractor activity classification determines:
� PPE, Required training, Requirements for occupational safety and health program
� Training topics are stated by Unipar Carbocloro (regulation and specific hazards)
� General safety information
� When starting to work
� Refresher training: annually
� Monthly Safety Meetings and Safety Dialogs
� Evaluating and tracking contractor safety performance
� Audits
SAFE WORK PRACTICES
ELEMENT 11: SAFE WORK PRACTICES
Procedure for issuing written permission to perform safe work services.
� Plant Practices:
� Applied to employees and resident contractors
� Refresher training every 3 years
� The permit shall be kept on file until work completion
� Valid for one work day
Lock, Tag and Try
Key
Procedures Each activity has a
speficic procedure
and form
Hot work
Confined space entry
Line breaking
Fall protection
Critical non-routine activities
Non-critical non-routine activities
ELEMENT 12: EMERGENCY PLANNING AND RESPONSE
The Emergency Response Plan details how the facility will respond to and
mitigate emergency situations.
� Facility has a written plan which:
� Assigns responsibilities
� Details emergency steps
� Is based on State Fire Department regulations and on specific hazards
� Response team composed by employees
� Training and drills are based on selected accidental scenarios
� Selection of drills scenarios are based on a classification
� Plan is periodically evaluated and improved (yearly)
EMERGENCY PLANNING AND RESPONSE
EMERGENCY PLANNING AND RESPONSE
Training and Drills
� Training
� Yearly training of employees and contractors
� Visitors receive safety and the emergency plan information
� Emergency Response Team: 3 levels of training based on role
established on the ERP
� Emergency Response and Evacuation Drills
� 4 Emergency Response drills per year, one of them includes plant
evacuation and one of them includes confined space rescue
� Community evacuation drill performed every five years
� Emergency exercises on a school nearby company (one per semester)
� The drills are evaluated and recommendations are tracked
FIRE PROTECTION SYSTEMS
ELEMENT 13: FIRE PROTECTION SYSTEMS
� Plant Procedures and systems:
� Fixed systems and mobile apparatus that is intended to either aid in the extinguishment and/or
control of fires or explosions (Fire pumps, deluge systems, hydrants, underground distribution
piping, etc)
� Fixed systems installed to notify personnel that a fire and/or gas release has occurred
(Combustible gas detection systems and smoke detection systems)
� Defined frequency of Inspections, tests, and maintenance activities
� Formal documentation and approval for temporary impairment
AUDIT
ELEMENT 14: AUDIT
Verify if the obligations outlined in the PSM Program are being met.
� Facility PSM audit program:
� Cover the specific process safety aspects
� Includes contractor and maintenance activities
� Conducted every three years (all elements)
� Carried out by employee or external team
� 9 employees certified by Abiquim (Responsible Care Program Audit)
� Non-compliance investigation
� Track action plan
METRICS
ELEMENT 15: METRICS
Main objective:
� Monitor PSM effectiveness and suggest improvements.
� Plant Procedure:
� Metrics considers:
� MOC
� Incident Investigations and recommendations
� Last Line of Defense
� Mechanical Integrity program (Inspection and maintenance)
� Report
� Monthly metrics
� Some items are discussed weekly
Final Comments
Continuous effort is essential to PSM program performance:
� Commitment from all levels of management and staff
� Understanding of plant hazards.
� Analyze and manage risks
� Conduct periodic audits
� Management of “barriers” integrity
� Keep continuous improvement culture
27
QUESTIONS?
THANK YOU!
Flávia Mariano Pinto
www.uniparcarbocloro.com.br
www.fabricaaberta.com.br