Download - Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011
![Page 1: Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011](https://reader036.vdocuments.site/reader036/viewer/2022062805/5697bff31a28abf838cbc94e/html5/thumbnails/1.jpg)
Pre-Disaster Mitigation Pre-Disaster Mitigation Grants 2012Grants 2012
Presented to Presented to
Palm Coast City Council Palm Coast City Council
December 20, 2011December 20, 2011
![Page 2: Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011](https://reader036.vdocuments.site/reader036/viewer/2022062805/5697bff31a28abf838cbc94e/html5/thumbnails/2.jpg)
FIVE YEAR GOALSFIVE YEAR GOALS• Maintain a Safe CommunityMaintain a Safe Community
MAJOR PROJECTSMAJOR PROJECTS• Water Control Structure (one replacement per year)Water Control Structure (one replacement per year)
CITYCITY COUNCIL GOALS AND COUNCIL GOALS AND OBJECTIVES 2011 & 2012OBJECTIVES 2011 & 2012
![Page 3: Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011](https://reader036.vdocuments.site/reader036/viewer/2022062805/5697bff31a28abf838cbc94e/html5/thumbnails/3.jpg)
Canal Control Structures 5-Year Plan
COPC Eligible for Structure Waterway Rating FEMA Funding Year
R-1 Royal Palms 11 Yes 2012
BT-2 Bellaire 11 No 2013
L-1 Sesame 9 Yes 2014
M-2 Mulberry 9 No 2014
I-1 Iroquois 9 Yes 2015
I-4 Ulysses (N) 9 Yes 2015
I-6 Ulysses (S) 9 Yes 2015
L-4 Royal Palms 9 No 2016
![Page 4: Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011](https://reader036.vdocuments.site/reader036/viewer/2022062805/5697bff31a28abf838cbc94e/html5/thumbnails/4.jpg)
Three Sisters General Location
![Page 5: Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011](https://reader036.vdocuments.site/reader036/viewer/2022062805/5697bff31a28abf838cbc94e/html5/thumbnails/5.jpg)
119 cfs @ NWL 21.0’
186 cfs @ NWL 20.0’
420 cfs @ NWL 20.5’ 725 cfs @ NWL 15.2’
![Page 6: Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011](https://reader036.vdocuments.site/reader036/viewer/2022062805/5697bff31a28abf838cbc94e/html5/thumbnails/6.jpg)
Three Sisters Design Three Sisters Design ConsiderationsConsiderationsOver the last 2 years, many designs were considered, and eliminated:
•A bridge would be required to maintain and construct a single weir.
•Each waterway has a different elevation and flow rate.
•The stilling basin before the culverts under I-95 attenuates and reduces water velocities.
•The proposed design has been permitted by the SJRWMD.
•A new design would require withdrawal of the PDM Grant application.
•With new design elevations, the new permit would require stormwater and groundwater modeling.
![Page 7: Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011](https://reader036.vdocuments.site/reader036/viewer/2022062805/5697bff31a28abf838cbc94e/html5/thumbnails/7.jpg)
Three Orphans General Location
![Page 8: Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011](https://reader036.vdocuments.site/reader036/viewer/2022062805/5697bff31a28abf838cbc94e/html5/thumbnails/8.jpg)
QUESTIONS ?