![Page 1: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/1.jpg)
Practical Detailing for Mid-Rise Wood Frame Buildings
Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer: This presentation was developed by a third party and is not funded
by WoodWorks or the Softwood Lumber Board.
![Page 2: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/2.jpg)
Type VA Detailing
• 1 Hour Rated Floor • 1 Hour Rated Wall • Rated from Both Sides
![Page 3: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/3.jpg)
Type VA Detailing
• 1 Hour Rated Floor • 1 Hour Rated Wall • Rated from Inside Only
![Page 4: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/4.jpg)
Type IIIA Detailing
• 1 Hour Rated Floor • 2 Hour Rated Wall • Fire Retardant Treated • Rated from Both Sides
![Page 5: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/5.jpg)
Type IIIA Detailing
• 1 Hour Rated Floor • 2 Hour Rated Wall • Fire Retardant Treated
o Wall Framing o Wall Sheathing
• Rated from Both Sides
![Page 6: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/6.jpg)
Type IIIA Detailing
• 1 Hour Rated Floor • 2 Hour Rated Wall • Fire Retardant Treated
o Wall Framing o Wall Sheathing o Rim Beam
• Rated from Both Sides
![Page 7: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/7.jpg)
Type IIIA Detailing
• 1 Hour Rated Floor • 2 Hour Rated Wall • Fire Retardant Treated
o Wall Framing o Wall Sheathing o Rim Beam o Floor Joists for at least 10’ &
individually wrapped with GWB
• Rated from Both Sides
![Page 8: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/8.jpg)
Type IIIA Detailing
![Page 9: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/9.jpg)
Type IIIA Detailing
![Page 10: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/10.jpg)
Type IIIA Detailing
• 1 Hour Rated Floor • 1 Hour Rated Non-Bearing Wall • Fire Retardant Treated
![Page 11: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/11.jpg)
Type IIIA Detailing
• 1 Hour Rated Floor • 1 Hour Rated Non-Bearing Wall • Fire Retardant Treated
![Page 12: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/12.jpg)
Type IIIA Detailing
• 1 Hour Rated Floor • 2 Hour Rated Wall • Fire Retardant Treated • Rated from Both Sides
![Page 13: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/13.jpg)
Type IIIA Detailing
• 1 Hour Rated Floor • 2 Hour Rated Non-Bearing Wall • Fire Retardant Treated • Fire Coated Plywood
![Page 14: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/14.jpg)
Type IIIA Detailing
• 1 Hour Rated Floor • 2 Hour Rated Non-Bearing Wall • Fire Retardant Treated • Fire Coated Plywood
![Page 15: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/15.jpg)
Interior Wall Detailing
• 1 Hour Rated Floor • Non-Rated Wall
![Page 16: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/16.jpg)
Interior Wall Detailing
• 1 Hour Rated Floor • 1 Hour Rated Wall
![Page 17: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/17.jpg)
Interior Wall Detailing
• 1 Hour Rated Floor • 1 Hour Rated Demising Wall • Fire Blocking Required
![Page 18: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/18.jpg)
Interior Wall Detailing
• 1 Hour Rated Floor o Parallel Framing
• 2 Hour Rated Wall
![Page 19: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/19.jpg)
Interior Wall Detailing
• 1 Hour Rated Floor o Perpendicular Framing
• 2 Hour Rated Wall • Fire Coated Plywood
![Page 20: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/20.jpg)
Interior Wall Detailing
• 1 Hour Rated Floor o Perpendicular Framing
• 2 Hour Rated Wall • Fire Coated Plywood
![Page 21: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/21.jpg)
Interior Wall Detailing
• 1 Hour Rated Wall • 2 Hour Rated Wall
![Page 22: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/22.jpg)
Interior Wall Detailing
• 2 Hour Rated Floor • 1 Hour Rated Wall - NLB
![Page 23: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/23.jpg)
Interior Wall Detailing
• 2 Hour Rated Floor • 2 Hour Rated Wall – Load Bearing
![Page 24: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/24.jpg)
Corridor Wall Detailing
• 1 Hour Rated • Load Bearing • STC 50 min • GA File No WP 3242
o (For acoustics)
![Page 25: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/25.jpg)
Corridor Wall Detailing
• 1 Hour Rated • Load Bearing • Shear Wall • NOT STC 50 min • GA File No WP 3242 Sim
o (For acoustics)
![Page 26: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/26.jpg)
Corridor Wall Detailing
• 1 Hour Rated • Load Bearing • Shear Wall • Sound Board • STC 50 min • NGC 2011058
o (For acoustics)
![Page 27: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/27.jpg)
Corridor Wall Detailing
• 1 Hour Rated • Load Bearing • Shear Wall • Staggered Stud • STC 50 min • GA File No 3910
o (For acoustics)
![Page 28: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/28.jpg)
Corridor Wall Detailing
• 1 Hour Rated • Load Bearing • Shear Wall • Staggered Stud • STC 50 min • GA File No 3910
o (For acoustics)
![Page 29: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/29.jpg)
Corridor Ceiling Detailing
• 1 Hour Rated • 6x10 Beams • 14” I Joists • MEPF Within Rated Enclosure
![Page 30: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/30.jpg)
Corridor Ceiling Detailing
• 1 Hour Rated • Heavy Timber Construction • 3x Flooring • MEPF Outside Rated Enclosure
![Page 31: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/31.jpg)
Corridor Ceiling Detailing
• 1 Hour Rated • 9 ½” I Joists • Dropped Ceiling • MEPF Outside Rated Enclosure
![Page 32: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/32.jpg)
Balcony Detailing
• Bolt On Balcony • Aluminum or Steel • Sprinkler Requirements • Floor Area Implications
![Page 33: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/33.jpg)
Balcony Detailing
• Framed Balcony • Decking Options
• Review Tested Assemblies • Step and Slope Limitations
• Review for Accessibility • Venting Requirements • Waterproofing Implications
![Page 34: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/34.jpg)
Shaft Wall Detailing
• Mechanical o 2 hour rating thru 1 hour wall o One side with shaft wall for access
![Page 35: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/35.jpg)
Shaft Wall Detailing
• Stair • Rating Continuous • Only Beams Penetrate Shaft • Secondary Stair Framing • Furred wall for MEPF
![Page 36: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/36.jpg)
Shaft Wall Detailing
• Elevator • Beam at Door Opening • C-T Shaft Wall
![Page 37: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/37.jpg)
Fire Wall Detailing
• Structurally Dependent o Seattle Only
![Page 38: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/38.jpg)
Fire Wall Detailing
• Structurally Independent • UL U336
o (2) 1” Shaft Wall o H Studs o ¾” Air Gap o Non rated wood walls o Breakaway clips
![Page 39: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/39.jpg)
Fire Wall Detailing
• Structurally Independent • Two Wood Frame Walls • Plywood Non-continuous • Fire Coated Plywood at Rim
![Page 40: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/40.jpg)
Fire Wall Detailing
• Structurally Independent • Two Wood Frame Walls • Plywood Continuous • Fire Coated Plywood at Rim • Fire Coated Plywood at Wall Gap
![Page 41: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/41.jpg)
Fire Wall Detailing
• Structurally Independent • Masonry Walls • Furred Plumbing Walls
![Page 42: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/42.jpg)
Structural Column and Beam Detailing
• Column Protection o 8x8 = 1 layer GWB w/ cover o 4x4 = 2 layers GWB w/ cover o Wood = ?
![Page 43: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/43.jpg)
Structural Column and Beam Detailing
• Column Protection o 4x4 = 2x8 wall minimum o Wood = ?
![Page 44: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/44.jpg)
Structural Column and Beam Detailing
• Beam Protection o Spray Applied Fire Resistive
Material
![Page 45: Practical Detailing for Mid-Rise Wood Frame Buildings · Practical Detailing for Mid-Rise Wood Frame Buildings Jon Hall AIA, Quality Management Director February 23 & 24, 2016 Disclaimer:](https://reader031.vdocuments.site/reader031/viewer/2022021910/5c007d3f09d3f2377a8bd32e/html5/thumbnails/45.jpg)
Questions?
This concludes The American Institute of Architects Continuing Education Systems Course