Lumpkin Basin
PROJECT VICINITY
MAP
PROJECT LOCATION
Lumpkin Road Overall Description
PROJECT LIMITS
• Lumpkin : +/-3,600 LF
• Adjacent Development
• College (HCC)
• Commercial
• Industrial
• Residential
PROJECT LIMITS
LUMPKIN BASIN
HCC
W156-00-00
SPRING LEA / SHADOW OAKSSUBDIVISION
Rummel Creek
5/25/2017
2
Lumpkin Road Overall Description
• Improve Drainage Deficiencies
• Reduce Flooding in Spring Lea /Shadow Oaks Neighborhood (North)
• Improve Safety and Mobility – Additional Traffic Lanes
• Pedestrian Access – For Houston Community College (HCC)
• Upgrade Traffic Components
• Replace Aging Water and Sewer Utilities
PROJECT BACKGROUND & OBJECTIVES
Lumpkin Basin
Engineering Phase
Lumpkin Road
Project Area Overview
Lum
pki
n R
d
IH-10 (TXDOT)
Houston Community College
Detention
Ru
mm
el C
ree
k
Westview
5/25/2017
3
Lumpkin Road EXISTING SYSTEM - 100 YR SHEET FLOW PONDING MAP
HCC
HOME DEPOT
IH-10
Lumpkin Basin Existing Conditions
• Existing 16.1 Ac-Ft (Site 3.33 – acres)
• Off-line Basin - 36”-RCP - Connection
• 15 to 25’ Maintenance Berm
• Approx depth 12’
7’x
4’
36”
7’x6’
30” Restrictor
Westview Road
North
Lum
pki
n R
oad
Lumpkin Basin Existing Conditions
• Narrow 120-ft Zone at Outlet (limits depth)
• Limited by 36” inflow/outflow pipe
• Limited access made maintenance difficult
5/25/2017
4
Lumpkin Road
Lum
pki
n R
d
IH-10 (TXDOT)
Houston Community College
Detention
Ru
mm
el C
ree
k
Westview
ILLUSTRATION OF EXISTING DRAINAGE CONDITIONS (NTS):
Westview Dr.Lumpkin Road
(open ditch)
TxDOT
2-10’x10’ RCB
HCFCD W156-00-00
Rummel Creek
TxDOT I-10
WB
Frontage Rd
60” Outfall to
Parking Lot
To TxDOT
Existing Westview Dr.
Detention Basin (12-ft deep)
Existing 48” & 36” Water
transmission line
Existing Drainage Conditions
North
ILLUSTRATION OF PROPOSED DRAINAGE CONDITIONS (NTS):
Westview Dr.
Prop. Lumpkin Road
Curb and Gutter
TxDOT Dual
10’x10’ RCB
No Impact
TxDOT I-10 WB
Frontage Rd
Maintain Existing
60” Outfall (restricted)
7-ft Deeper Westview Dr.
Detention Basin
with 36” Restrictor2~24” Restrictor pipes
to maintain existing
peak flow to TxDOT
Raised 48” & 36”
Water transmission line
To allow deeper storm
sewer
Proposed Drainage Conditions
5/25/2017
5
Lumpkin Road PROPOSED CONDITIONS - 100 YR SHEET FLOW
HCC
IH-10
Lumpkin Basin Proposed Improvements
• Matched 100-yr Peak
• Reduced 10-yr
• Reduced total volume to TxDOT ROW by 19.5 ac-ft (100-yr)
Lumpkin Basin Proposed Improvements
• Lowered +/- 7 FT
• Total 26.5 Ac-Ft
• 24 to 30’ Maintenance Berm
• 20’ deep (max)
Overflow zone
5/25/2017
6
Lumpkin Basin Proposed Improvements
• Modular block gravity wall
• Each block 2,000 – 2,500 lbs
• 6 Different vertical walls zones
• Remove poor existing clay & replace w/ cement stabilized sand base
• Crushed Concrete Drainage Backfill
• 24’ to 30’ Maintenance Berm
120-ft Width
60-ft Width
Lumpkin Basin Proposed Improvements
• All Weather Concrete Vehicular Access Ramp – Both Levels
• Reduced Berm
Lumpkin Basin
SAFETY ENHANCEMENTS
• Curbs • Perimeter Fence
5/25/2017
7
Lumpkin Basin
Construction Phase
Lumpkin Basin
General Bid Information
• Construction Cost = $3,420,000
• Construction Duration = 9 months
• Excavation & Disposal = 30,000 CY
• Redi-Rock modular system average bid $55 / sq. ft.
• Total for wall system = $1.2 - mil
• Total Area approximately 22,500 SF
• 3,880 Redi-Block
Challenges
• Heavy rain events during the course of construction.
• Dewatering after heavy rain events
• Replacing poor soil with cement stabilized sand bedding
• Temporary shoring up to 22-feet
• Relocating a 36 & 48-in Transmission Water Lines
5/25/2017
8
Lumpkin Basin
• Inflow from Lumpkin Rd existing storm sewer
• Dewatering after storm events
• Temporary access ramp
Temporary Access Ramp
36” outlet
Rock filter Dam
Water Line Relocation
• Relocation of a 36 & 48-inch transmission Water lines
• City of Houston Low Demand Water Window
• Work around the clock
• Limited time for pipe procurement
Water Line Relocation
48-inch Water Line Installation
5/25/2017
9
Construction Sequence
• East to West (North Walls)
• East to West (South Walls)
• Backwalls
Construction Sequence
• East to West (North Walls)
• East to West (South Walls)
• Backwalls
Construction Sequence
• East to West (North Walls)
• East to West (South Walls)
• Backwalls
5/25/2017
10
Redi-Rock Installation
• Cement Stabilized Sand Foundation Base
Redi-Rock Installation
• Temporary Trench Safety Protection Prior to Redi-Rock Installation
Redi-Rock Installation
• Redi-Rock System
• Different Types of Blocks sizes
• Works As a Gravity Wall
• Aesthetically Pleasant
5/25/2017
11
Redi-Rock Installation
• Initial Installation of Granular bedding (North Wall)
Redi-Rock Installation
• Initial Installation of Redi-Rock System (North Wall)
• Geotextile
• 6-inch drain pipe
Redi-Rock Installation
• Granular backfill
• Crushed Concrete Material
5/25/2017
12
Lumpkin Basin
• On Going Construction
• Curve walls
• 6-inch Drainage Pipe
Redi-Rock Installation
• Reference to scale of walls with equipment
• Varied wall heights
• Protection of Pilot Channel During Top Soil Excavation
Lumpkin Basin
• TxDOT headwall
• 9 X 5-foot Inlet RCB
• 36” RCP Outlet Pipe
5/25/2017
13
Safety Enhancements
• Pedestrian Guard Rail System
• 18” X 48” Circular foundations
• 8” Top Soil Placement
Lumpkin Basin
• Backflow interceptor outfall in slope paving under Vehicle Access Road
• 8-foot wide pilot channel
• Concrete Slope paving for overflow areas
• Concrete Vehicular Access ramp
• Earthen Slopes at 4:1
Lumpkin Basin
• Backflow interceptor outfall in wall
• 8-foot wide concrete pilot channel
• Slope paving for overflow areas
• Concrete Vehicular Access ramp
5/25/2017
14
Overall Project Overview
Lumpkin Basin
Tax Day Flooding
April 18, 2016
Houston Texas
Lumpkin Basin
Before the Tax Day event
5/25/2017
15
Lumpkin Basin
During the Tax
Day Rain Event
Peak Water at predicted 100-yr WSEL
Lumpkin Basin
• Upstream of detention basin.
• Limited Street Ponding
Lumpkin Basin
• Water at Spillway / access driveway along Westview Drive
5/25/2017
16
Lumpkin Basin
• Off-site inflow
• From west side of basin
Lumpkin Basin
• Lumpkin Road looking south
• Street Flooding from surcharged IH-10 Westbound Frontage Road
• No structural flooding to adjacent buildings.
Lumpkin Basin
• Downstream flooding
• Looking west towards Sam Houston Tollroadconnection
• 2-10’x10’ that is
• Rummel Creek along
• IH-10 Frontage Road
5/25/2017
17
Conclusion
• Increased detention efficiency from 50% to 93%
• Increased effective storage volume by 15 ac-feet (total system net increase of 20 ac-feet)
• Reduced Flooding in Spring Lea /Shadow Oaks Neighborhood (North)
• Improved Maintenance Access for Basin
• Aesthetic Benefit to the area
Questions & Answers