• Run10, 25 cryo-weeks (my guesses after Jan 12)
– Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to 4.5K complete in both rings!– Dec. 5, beam setup in RHIC begins.– Dec 16, 20 hr unplanned Maintenance day– Dec 20 (AM)-21(PM), blizzard 09 shut us down– Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late)– Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared s=200 GeV/n Au-Au– Jan 2 (midnight) STAR in Physics Mode– Jan 8 (0600) PHENIX in Physics Mode– Jan 12, Rebucketing not yet routine, stochastic cooling still to come.– Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on– Mar. 11, End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup– Mar. 13, Begin 4 week s = 62.4 GeV/n run– Apr. 10, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup– Apr. 12, Begin 1.5 week s = 39 GeV/n run– Apr 18-22, Satogata is away– Apr. 23, End 1.5 week s = 39 GeV/n Run, begin s = 7.7 GeV/n setup– Apr. 25, Begin 4 week s = 7.7 GeV/n run– May 20, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup– May 23, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup – May 23 – 28 IPAC (Kyoto)– May 25, begin 0.5 week beam studies at s = 5 GeV/n and ~ 0.67 - – 25 CRYO WEEKS– This is it unless we have $’s to run longer – revisit in March– May 29, end 0.5 week studies– May 31, begin s = 11.5 GeV/n for STAR– Jun 8, – 27 CRYO WEEKS– Jun 15, end 2 week s = 11.5 GeV/n run– Jun 15 , Begin Cryo Warm-up– Jun 16, Warm-up complete, Run 10 ends – 28.2 CRYO WEEKS
![Page 2: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/2.jpg)
http://www.bnl.gov/cad/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldown to 45 deg K
RHIC Cryo Cooldown/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC STAR & PHENIX Lattice Sextupole Polarity Swap
RHIC Research with s = 200 GeV /n AuAu IBS NO
RHIC Research with s = 62.4 GeV /n AuAu IBS NO
RHIC Research with s = 39 GeV /n AuAu IBS NO
Complete n ~ 0.67 for pp studies
RHIC Research with s = 7.7 GeV /n AuAu NO YES
Beam Studies at s = 5 GeV /n AuAu NO YES
STAR Research with s = 11.5 GeV /n AuAu NO NO(or Maybe)
IPAC
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY10
Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
FY 2010
2 Mar 10
setup with beams in both rings
Sep
concurrent with RHIC
ramp up luminosity
21 Sep
28.2 weeks
1 Dec
20 Nov
setup as required
10 weeks physics
6/16 End Date (TBD)
10 weeks
NSRL Schedule TBD
25 cryo weeks
4weeks
1.5wks
4weeks
2wks
For Discussion Only
~12 hour overhead to swap Q7's out of IBS lattice and reverse sextupole polarities
4-6 hour overhead to reverse sextupole polarities (if necessary)
Complete before polarity switches
![Page 3: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/3.jpg)
Possible Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week
• Dec. 1, Begin cool down to 4.5K • Dec. 4, Cooldown to 4.5K complete in both rings!• Dec. 5, beam setup in RHIC begins.• Dec 16, 20 hr unplanned Maintenance day• Dec 20 (AM)-21(PM), blizzard 09 shut us down• Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late)• Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared s=200 GeV/n Au-Au• Jan 2 (midnight) STAR in Physics Mode• Jan 8 (0600) PHENIX in Physics Mode• Jan 12, Rebucketing not yet routine, stochastic cooling still to come.• Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on• Mar. 18, End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup• Mar. 20, Begin 4 week s = 62.4 GeV/n run• Apr. 17, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 19, Begin 1.5 week s = 39 GeV/n run• Apr 18-22, Satogata is away• Apr. 30, End 1.5 week s = 39 GeV/n Run, begin = 0.67 studies before polarity switches begin (i.e. this is a placeholder)• May 1, complete = 0.67 studies for pp and s = 7.7 GeV/n setup (12 hr pol. switches)• May. 3, Begin 4 week s = 7.7 GeV/n run• May 23 – 28 IPAC (Kyoto)• May 25 – 25 cryo weeks• May 31, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup (6 hr polarity switch)• Jun 2, begin 3 day beam studies at s = 5 GeV/n • Jun 5, end 3 day studies begin s = 11.5 GeV/n setup• Jun 7, begin s = 11.5 GeV/n for STAR• Jun 8 – 27 cryo weeks• Jun 21, end 2 week s = 11.5 GeV/n run• Jun 22 , Begin Cryo Warm-up• Jun 23, Warm-up complete, Run 10 ends – 29.2 CRYO WEEKS
![Page 4: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/4.jpg)
http://www.bnl.gov/cad/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldown to 45 deg K
RHIC Cryo Cooldown/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC STAR & PHENIX Lattice Sextupole Polarity Swap
RHIC Research with s = 200 GeV /n AuAu IBS NO
RHIC Research with s = 62.4 GeV /n AuAu IBS NO
RHIC Research with s = 39 GeV /n AuAu IBS NO
Complete n ~ 0.67 for pp studies
RHIC Research with s = 7.7 GeV /n AuAu NO YES
Beam Studies at s = 5 GeV /n AuAu NO YES
STAR Research with s = 11.5 GeV /n AuAu NO NO(or Maybe)
IPAC
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY10
Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
FY 2010
2 Mar 10
setup with beams in both rings
Sep
concurrent with RHIC
ramp up luminosity
21 Sep
29.2 weeks
1 Dec
20 Nov
setup as required
10 weeks physics
6/23 End Date (TBD)
11 weeks
NSRL Schedule TBD
25 cryo weeks
4weeks
1.5wks
4weeks
2wks
with s=200 extended 1 week (For Discussion Only)
~12 hour overhead to swap Q7's out of IBS lattice and reverse sextupole polarities
4-6 hour overhead to reverse sextupole polarities (if necessary)
Complete before polarity switches
![Page 5: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/5.jpg)
Run 10 100 x 100 GeV/n Au Delivered Luminosity
0
1000
2000
3000
4000
5000
6000
7000
0 1 2 3 4 5 6 7 8 9 10 11
Weeks of Physics collisions
mb-1
Min
Max
STAR-Physics
PHENIX-Physics
Machine (PHENIXZDC)Linear (PHENIX-Physics)
as of 1 Mar, through store 11827
PHENIX Goal*
* With 20 cm sigma IR diamond
PHENIX Minimum Goal*
STAR Goal~12%/week
![Page 6: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/6.jpg)
Run 10 100 x 100 GeV/n Au Delivered Luminosity per day
0
20
40
60
80
100
120
140
160
0 1 2 3 4 5 6 7 8 9 10
Weeks of Physics collisions
b-1
/day
Min
Max
STAR
PHENIX
Yellow Transverse Stochastic Cooling onRebucketing ~on (22 Jan)
as of 1 Mar, through store 11827
![Page 7: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/7.jpg)
Run 10 100 x 100 GeV/n Au Delivered Luminosity per day
0
20
40
60
80
100
120
140
0 1 2 3 4 5 6 7 8 9 10
Weeks of Physics collisions
b-1
/day
Min
Max
STAR 1 week average
PHENIX 1 week average
Yellow Transverse Stochastic Cooling onRebucketing ~on (22 Jan)
as of 1 Mar, through store 11827
![Page 8: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/8.jpg)
71.3
178.9
588.6
359.5
526.8 541.2
302.9
483.2
72.4
179.4
599.7
358.8
547.5 569.2
335.4
525.4
80.3 43.0 107.2 76.2 96.0 95.2 83.8 99.10
24
48
72
96
120
0
100
200
300
400
500
600
700
800
12
/31
to 1
/07
1/0
8 to
1/1
4
1/1
5 to
1/2
1
1/2
2 to
1/2
8
1/2
9 to
2/0
4
2/0
5 to
2/1
1
2/1
2 to
2/1
8
2/1
9 to
2/2
5
ho
urs
pe
r w
ee
k a
t s
tore
Run 10 (AuAu) -- Integrated Luminosity by week in
teg
rate
d l
um
nio
sit
y [m
b^
-1]
period
Phenix STAR (lumi) hours at store
thru fill 11800ending 18:33 25 February Goal
Min
Max
![Page 9: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/9.jpg)
13 Feb – 2 Mar 10
PHENIX ~ Saturated
Look at this one in detail
![Page 10: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/10.jpg)
Fills 11824 28 Feb 10
Lpeak from Table 2 (Maximum Luminosities)
Lstore average from Table 2
![Page 11: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/11.jpg)
Fills 11824 28 Feb 10
Max ions/bunch goal from Table 2, 1.1 x 109
![Page 12: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/12.jpg)
Fills 11824 28 Feb 10, Longitudal Stochastic Cooling
(yellow not operating)
30 % reduction
![Page 13: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/13.jpg)
Fills 11824 28 Feb 10, Transverse Stochastic Cooling
![Page 14: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/14.jpg)
Fill 11489, no cooling, no rebucketing (0.6 m beta*)Monday, 18 Jan.
Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)
Avg Efficiency XCBM to RHIC
XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC
Blue 111/28 1196 0.911 1.024 0.961 0.999 0.927
Yellow 111/29 1168 0.879 1.023 0.961 0.989 0.905
![Page 15: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/15.jpg)
Ring Bunches/Cycles
Avg Bunch in RHIC (10^6 ions)
Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC
Blue 56/56 909 0.836 1.056 0.963 0.992 0.828
Yellow 56/56 990 0.971 1.085 0.962 0.959 0.970
Injected Beam Statistics for Fill number 11340Started filling RHIC: Thu Dec 31 22:51:52 2009, Fill complete: Thu Dec 31 22:59:50 2009, Minutes to fill: 7
31 Dec 1st Physics Store
28 Feb Physics Store 11824, 0.7 m b* with some cooling and with rebucketing
Ring Bunches/Cycles Avg Bunch in RHIC
(10^6 ions)
Avg Efficiency
XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf
Wxf to Arc
Arc to RHIC
Blue 111/28 1262 0.917 0.975 0.961 1.001 0.977
Yellow
111/28 1246 0.910 0.961 0.964 0.988 0.994
0.9050.9890.9611.0230.8791168111/29Yellow
0.9270.9990.9611.0240.9111196111/28Blue
Arc to RHIC Wxf to Arc Uxf1 to Wxf XCBM to Uxf1 Avg Efficiency XCBM to RHIC
Avg Bunch in RHIC (10^6 ions)
Bunches/Cycles Ring
18 Jan Physics Store 11489, 0.6 m * No cooling or rebucketing
![Page 16: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/16.jpg)
Future Topics
• 3rd integar studies update – M. Bai• Toward Smaller beta* - new quad triplets – D. Trbojevic
![Page 17: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/17.jpg)
Archive
![Page 18: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/18.jpg)
Through Dec 2009
BNL Energy Cost
$(20)
$-
$20
$40
$60
$80
$100
$120O
ct-0
0
Oct
-01
Oct
-02
Oct
-03
Oct
-04
Oct
-05
Oct
-06
Oct
-07
Oct
-08
Oct
-09
Oct
-10
$/M
Wh
rBilled Cost/MWhr
Without Balanced Billing
Balanced Billing Projection
RHIC ON
AGS SEB/FEB
NSRL
![Page 19: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/19.jpg)
Through 2/15/10
RHIC Cryo Operations FY06-10
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
-30 -10 10 30 50 70 90 110 130 150 170 190
Days since beginning of Run
MW
RHIC Cryo 06
RHIC Cryo 07
RHIC Cryo 08
RHIC Cryo 09
RHIC Cryo 10
![Page 20: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/20.jpg)
Through 2/15/10
RHIC Operations FY06-10
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
-30 -10 10 30 50 70 90 110 130 150 170 190
Days since beginning of Run
MW
CAD P ower 06
CAD P ower 07
CAD P ower 08
CAD P ower 09
CAD P ower 10
![Page 21: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/21.jpg)
Through 2/15/10
BNL Energy Use FY 2009-10
0
5
10
15
20
25
30
35
40
45
501-
Jul-
08
1-A
ug-0
8
1-S
ep-0
8
1-O
ct-0
8
1-N
ov-0
8
1-D
ec-0
8
1-Ja
n-09
1-F
eb-0
9
1-M
ar-0
9
1-A
pr-0
9
1-M
ay-0
9
1-Ju
n-09
1-Ju
l-09
1-A
ug-0
9
1-S
ep-0
9
1-O
ct-0
9
1-N
ov-0
9
1-D
ec-0
9
1-Ja
n-10
1-F
eb-1
0
1-M
ar-1
0
Date
Dai
ly A
vera
ge
Po
wer
(M
W)
RHIC Cryo RHIC other
AGS-Exp Booster
AGS-Mach Tandem
CAD Bldg less SMD NSRL
Site Base BNL Peak-Av
Site total not recorded after 30 Nov
![Page 22: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/22.jpg)
5 June 07 22
(w/o stochactic cooling)1.02 x 109 /bunch
0.97 x 109 /bunch
Run 7 Fill 8878 Injected Beam Statistics from ELOGBlue = 103 bunches 1.04x109/bunchYellow= 103 bunches 1.13x109/bunch
![Page 23: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/23.jpg)
5 June 07 23
Store 8849 (w/stochactic cooling)1.02 x 109 /bunch
0.97 x 109 /bunch
Run 7 Fill 8849 Injected Beam Statistics from ELOGBlue = 103 bunches 1.23x109/bunchYellow= 103 bunches 1.15x109/bunch
![Page 24: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/24.jpg)
5 June 07 24
Run7 AuAu ZDC rates with and without stochastic cooling, with equal initial Au ions/bunch in each ring
0
5,000
10,000
15,000
20,000
25,000
30,000
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00
Time (hours)
ZD
C (
Hz)
ZDC 25 May Store 8849 w/ stochastic cooling
ZDC 30 May Store 8878 w/o stochastic cooling
Poly. (ZDC 30 May Store 8878 w/o stochasticcooling)Poly. (ZDC 25 May Store 8849 w/ stochasticcooling)
Physics ON
Loss in 3 hrs= 3.1= 3.7
![Page 25: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/25.jpg)
Physics production or beam studies weekssNN (GeV) 25-cryoweek run 27-cryoweek run
200 10 1062.4 4 439 1.5 1.527 0 018 0 0
11.5 @ STAR 0 27.7 4 4
Beam studies @ 5 GeV and @ 0.67
0.5 0.5
Revised Run 10 Plan, Nov 25, 2009
![Page 26: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/26.jpg)
Run 10 Au-Au Goals11/19/09
• STAR– s = 200 GeV/n
• Luminosity Sampled/Delivered = 2/4 nb-1
• 250M Central Events• 300M Min-bias events
• PHENIX– s = 200 GeV/n
• Luminosity Recorded/Delivered = 1.4/>6 nb-1
• Minimum Goal: – Luminosity Recorded/Delivered = 1.1/3.9 nb-1
![Page 27: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/27.jpg)
![Page 28: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/28.jpg)
Run 7
Fill 8544
![Page 29: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/29.jpg)
BNL Energy Cost
$(20)
$-
$20
$40
$60
$80
$100
$120O
ct-0
0
Oct
-01
Oct
-02
Oct
-03
Oct
-04
Oct
-05
Oct
-06
Oct
-07
Oct
-08
Oct
-09
Oct
-10
$/M
Wh
rBilled Cost/MWhr
Without Balanced Billing
Balanced Billing Projection
RHIC ON
AGS SEB/FEB
NSRL
Through 30 Nov 09
![Page 30: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/30.jpg)
– Oct. 5, N2 scrubbing– Oct. 30, Temp. Control devices in and ready
(required for 45 K wave cooldown).– Nov. 2, 45 K wave begins.– Nov. 12, AGS Testing.– Nov. 12-13, APEX Workshop – Nov. 16, beam setup in Booster and AGS– Nov. 16-20, RHIC Dry Run – Nov 22, Beam extracted from AGS to W dump
Run 10 Setup
![Page 31: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/31.jpg)
Wednesday midnight
Thursday midnight
![Page 32: Possible Run 10 plan based on 25 Nov Revised Plan](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814511550346895db1d2a3/html5/thumbnails/32.jpg)
http://www.bnl.gov/cad/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldown to 45 deg K
RHIC Cryo Cooldown/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC STAR & PHENIX
RHIC Research with s = 200 GeV /n AuAu
RHIC Research with s = 8-62 GeV /n AuAu
Beam Studies at s = 5 GeV /n AuAu
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY10
Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
FY 2010
6 Jan 10
setup with beams in both rings As Run/Planned
Sep
concurrent with RHIC
ramp up luminosity
21 Sep
≥ 25 weeks
1 Dec
20 Nov
setup as required
10 weeks physics
End Date TBD
10 weeks
NSRL Schedule TBD
25 cryo weeks
25 Cryo Weeks