![Page 1: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/1.jpg)
1
Planning Board Work Session #7 November 29, 2018
![Page 2: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/2.jpg)
• Transportation analysis completed in support of the plan
• Intersection analysis
• Mitigation strategies to address vehicular delay
• Planned interchange at Veirs Mill Road and Randolph Road
• Refinements to transportation recommendations
• Receive final guidance from Planning Board on transportation recommendations
2
WORK SESSION #7: OVERVIEW
![Page 3: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/3.jpg)
3
![Page 4: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/4.jpg)
4
![Page 5: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/5.jpg)
5
Transform Veirs Mill Road to a Complete Street
VEIRS MILL CORRIDOR MASTER PLAN - VISION
![Page 6: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/6.jpg)
6
TRANSPORTATION ANALYSIS
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(9
4
6
7
8
3
2
1
5 10
Veirs Mill Corridor Master Plan
!( Intersections
Master Plan Boundary
Street Centerlines
Glenmont MSPA
Wheaton CBD Policy Area
Kensington/Wheaton Policy Area
White Flint MSPA
North Bethesda Policy Area
Aspen Hill Policy Area
Rockville City PolicyArea
Rockville Town Center MSPA
TwinBrook MSPA
0 0.45 0.9 1.35 1.80.225Miles
![Page 7: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/7.jpg)
7
![Page 8: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/8.jpg)
8
LOCAL AREA TRANSPORTATION REVIEW GUIDELINES - POLICY AREAS
Metro Station Policy AreasPlanned Premium Transit Service
Lower Density Residential Neighborhoods
Veirs Mill Corridor Master Plan Boundary
![Page 9: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/9.jpg)
9
INTERSECTION CONGESTION STANDARDS
HCM Volume-to-Capacity
Equivalent
Policy Area HCM Average Vehicle Delay Standard
(seconds / vehicle)
0.92 Aspen Hill 59
0.94 Rockville City 63
0.97 North Bethesda 71
1.0 Kensington/Wheaton 80
1.13 Rockville Town Center 120
1.13 Wheaton CBD 120
1.13 Twinbrook 120
• 2016-2020 Subdivision Standing Policy Intersection Congestion Standards
• Applies delay-based Highway Capacity Manual (HCM) methodology to intersections
![Page 10: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/10.jpg)
• 2040 Veirs Mill Corridor Master Plan Scenario
• Existing development, pipeline development and development anticipated based on zoning recommendations
• Incorporates expanded BRT lines based on Constrained Long Range Plan
• Transportation recommendations including:
• Bus Rapid Transit in dedicated, curb-running lanes;
• Two travel-lanes in each direction;
• 35 miles per hour target speed;
• Reducing left-turn lanes to a single lane, where feasible; and
• Eliminating channelized right-turn lanes
10
TRANSPORTATION ANALYSIS - ASSUMPTIONS
![Page 11: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/11.jpg)
11
12
3
4
5
6
10
9
78
VEIRS MILL CORRIDOR MASTER PLAN - INTERSECTIONS
![Page 12: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/12.jpg)
12
VEIRS MILL CORRIDOR MASTER PLAN – 2016 EXISTING CONDITIONS
3
5
6
10
3. Veirs Mill Road and Twinbrook Parkway5. Veirs Mill Road and Randolph Road6. Veirs Mill Road and Connecticut Avenue10. Randolph Road and Connecticut Avenue
![Page 13: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/13.jpg)
13
2040 NO-BUILD CONDITIONS
3
5
6
10
3. Veirs Mill Road and Twinbrook Parkway5. Veirs Mill Road and Randolph Road6. Veirs Mill Road and Connecticut Avenue10. Randolph Road and Connecticut Avenue
![Page 14: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/14.jpg)
14
VEIRS MILL CORRIDOR MASTER PLAN – 2040 NO MITIGATION
3
5
6
10
3. Veirs Mill Road and Twinbrook Parkway5. Veirs Mill Road and Randolph Road6. Veirs Mill Road and Connecticut Avenue10. Randolph Road and Connecticut Avenue
![Page 15: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/15.jpg)
15
VEIRS MILL CORRIDOR MASTER PLAN – 2040 MITIGATION (100 SECOND)
3
5
6
10
3. Veirs Mill Road and Twinbrook Parkway5. Veirs Mill Road and Randolph Road6. Veirs Mill Road and Connecticut Avenue10. Randolph Road and Connecticut Avenue
![Page 16: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/16.jpg)
16
TRANSPORTATION ANALYSIS RESULTS
0
50
100
150
200
250
3 5 6 10
MORNING PEAK HOUR
Existing Conditions AM AM Delay 2040 No Build AM AM Delay Master Plan AM - No Mitigation AM Delay Master Plan AM - Mitigation AM Delay
Master Plan (2040) - Mitigation
Master Plan (2040) – No Mitigation
Existing Conditions (2016)
No-Build (2040)
Proposed Delay Standard
RANDOLPH ROADCONNECTICUT AVENUE
VEIRS MILL ROADTWINBROOK PARKWAY
VEIRS MILL ROADRANDOLPH ROAD
VEIRS MILL ROADCONNECTICUT AVENUE
Seco
nd
s
![Page 17: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/17.jpg)
17
0
50
100
150
200
250
3 5 6 10
EVENING PEAK HOUR
Existing Conditions PM PM Delay 2040 No Build PM PM Delay Master Plan PM - No Mitigation PM Delay Master Plan PM - Mitigation PM Delay
TRANSPORTATION ANALYSIS RESULTS
Master Plan (2040) - Mitigation
Master Plan (2040) – No Mitigation
Existing Conditions (2016)
No-Build (2040)
Proposed Delay Standard
RANDOLPH ROADCONNECTICUT AVENUE
VEIRS MILL ROADTWINBROOK PARKWAY
VEIRS MILL ROADRANDOLPH ROAD
VEIRS MILL ROADCONNECTICUT AVENUE
Seco
nd
s
![Page 18: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/18.jpg)
18
VEIRS MILL ROAD AND RANDOLPH ROAD – PLANNED INTERCHANGE
• Public Hearing Draft Recommendation (Page 52):
• Eliminate the proposed interchange at Veirs Mill and Randolph Roads from the Master Plan of Highways and Transitways. This proposed interchange would inhibit pedestrian, bicycle and transit accessibility.
• Public Testimony
• Requested that the proposed interchange remain.
![Page 19: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/19.jpg)
19
• Inconsistent with walkable, transit-oriented environment and Vision Zero at this location.
• Potential impacts to private property, including commercial centers.
• Not required to meet 100 second congestion standard.
VEIRS MILL ROAD AND RANDOLPH ROAD – PLANNED INTERCHANGE
![Page 20: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/20.jpg)
20
RECOMMENDATIONS TO IMPROVE CONNECTIVITY
• Suggested revisions to Pedestrian Network Recommendations:
• NEW RECOMMENDATION: Provide adequate landscape buffers between the sidewalk and the curb with the installation of all new sidewalks on Veirs Mill Road and intersecting streets. For example, improved landscape buffers are needed on Veirs Mill Road, Connecticut Avenue, Randolph Road and Twinbrook Parkway.
![Page 21: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/21.jpg)
21
RECOMMENDATIONS TO IMPROVE CONNECTIVITY
• REVISED RECOMMENDATION: Introduce additional protected crossings at the following locations that eliminate conflicts and have high rates of compliance. The first recommended step is a traffic control device, including a full traffic signal, hybrid pedestrian beacon or similar device, but other changes such as red-light enforcement may be needed. These locations are listed in order of priority, following the Matthew Henson Trail Crossing:
• Veirs Mill Road and Andrew Street
• Veirs Mill Road and Norris Drive
• Veirs Mill Road and Arbutus Avenue
• Veirs Mill Road and Galt Avenue
• Veirs Mill Road and Bushey Drive
• Veirs Mill Road and Pendleton Drive
• Twinbrook Parkway and Halpine Road
• Twinbrook Parkway and Vandegrift Avenue
• Veirs Mill Road and Havard Street
![Page 22: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/22.jpg)
• Work Session #8 – December 13
• Work Session #9 – December 20 - Planning Board Draft
22
NEXT STEPS
![Page 23: Planning Board Work Session #7€¦ · 29-11-2018 · • Receive final guidance from Planning Board on transportation recommendations 2 WORK SESSION #7: OVERVIEW . 3. 4. 5 Transform](https://reader033.vdocuments.site/reader033/viewer/2022050502/5f94cd51653cc565956715ea/html5/thumbnails/23.jpg)
23