Joint OutputCase CaseType F1 F2 F3 M1 M2 M3
Text Text Text KN KN KN KN-m KN-m KN-m
1 DEAD LinStatic -0.907 0.144 29.469 -0.1055 -0.5805 0.0029
1 LIVE LinStatic -0.102 0.041 1.41 -0.0289 -0.1249 -0.0026
2 DEAD LinStatic 0.52 -0.272 24.907 0.1727 0.1126 -0.0063
2 LIVE LinStatic -0.033 0.178 1.307 -0.1499 -0.0915 -0.0034
3 DEAD LinStatic 6.307 2.139 77.127 -0.9329 2.9127 -0.0269
3 LIVE LinStatic -0.193 -0.211 4.262 0.0751 -0.1567 -0.0004646
4 DEAD LinStatic -5.782 2.13 125.642 -0.9707 -2.9811 -0.0046
4 LIVE LinStatic -0.045 -0.164 12.783 0.064 -0.0889 -0.0026
5 DEAD LinStatic 4.017 5.223 131.802 -2.2448 1.8375 0.0123
5 LIVE LinStatic -0.094 -0.232 13.654 0.0312 -0.1157 0.0028
6 DEAD LinStatic -4.705 5.346 86.474 -2.548 -2.4219 0.0175
6 LIVE LinStatic 0.012 -0.146 4.268 -0.22 -0.0653 0.0075
7 DEAD LinStatic 0.599 -0.479 79.871 0.1824 0.2063 -0.0135
7 LIVE LinStatic -0.184 0.129 6.658 -0.0584 -0.15 0.0024
8 DEAD LinStatic -0.704 -0.47 102.629 0.2102 -0.4382 -0.0105
8 LIVE LinStatic 0.088 0.114 17.054 -0.0366 -0.0199 0.0012
9 DEAD LinStatic 4.638 -3.542 132.399 1.5826 2.0277 -0.1845
9 LIVE LinStatic 0.166 0.416 21.789 -0.1937 -0.0138 -0.0497
10 DEAD LinStatic -4.617 -4.117 114.339 1.5427 -2.5051 -0.0148
10 LIVE LinStatic -0.063 0.283 7.832 -0.3528 -0.1294 -0.0017
11 DEAD LinStatic -0.065 1.111 57.268 -0.5207 -0.1369 -0.0017
11 LIVE LinStatic -0.097 -0.044 2.75 0.0346 -0.1204 0.0007537
12 DEAD LinStatic 1.739 2.215 106.19 -0.3554 0.7509 -0.002
12 LIVE LinStatic -0.132 -0.254 14.019 0.2752 -0.1384 -0.0014
13 DEAD LinStatic -2.487 -0.999 74.341 0.4376 -1.3157 0.0204
13 LIVE LinStatic -0.039 -0.167 13.014 0.1064 -0.0928 0.0053
14 DEAD LinStatic 4.647 -0.593 95.179 0.3083 2.347 0.0048
14 LIVE LinStatic 0.734 -0.601 12.485 0.2707 0.3447 0.0025
15 DEAD LinStatic -3.47 -0.407 66.641 -0.0344 -1.6466 -0.0546
15 LIVE LinStatic 0.197 0.381 2.133 -0.3649 0.0718 -0.0101
16 DEAD LinStatic -0.176 -2.509 30.584 1.0391 -0.2489 -0.0088
16 LIVE LinStatic -0.088 0.141 1.425 -0.027 -0.12 -0.0027
17 DEAD LinStatic 1.395 -3.19 67.905 1.9491 0.5228 0.0032
17 LIVE LinStatic -0.127 -0.022 5.09 0.1867 -0.1393 0.0003837
18 DEAD LinStatic 1.268 -0.231 87.419 0.1399 0.4686 0.0021
18 LIVE LinStatic -0.156 0.222 6.584 -0.0299 -0.1535 -0.0008506
19 DEAD LinStatic -2.217 -1.498 63.291 0.6974 -1.2244 0.1374
19 LIVE LinStatic 0.155 -0.064 1.788 0.0313 -0.00057 0.043
1703.782
TABLE: Joint Reactions
Joint OutputCase CaseType F1 F2 F3 M1 M2 M3
Text Text Text KN KN KN KN-m KN-m KN-m
1586 DEAD LinStatic 2.943 0.81 19.587 -0.4653 1.6316 -0.0116
1586 LIVE LinStatic 1.408 0.058 6.033 -0.019 0.7825 -0.0033
1587 DEAD LinStatic -1.547 -0.092 26.473 0.0646 -0.9425 0.0214
1587 LIVE LinStatic -0.765 -0.081 11.207 0.0578 -0.4634 0.0094
1588 DEAD LinStatic 0.359 0.002393 20.608 -0.0015 0.1616 0.0014
1588 LIVE LinStatic 0.175 -0.13 8.428 0.0729 0.0807 0.0028
1589 DEAD LinStatic -1.499 1.561 13.17 -0.798 -0.9048 -0.00071
1589 LIVE LinStatic -0.693 -0.00512 3.248 -0.00078 -0.4173 0.0031
1590 DEAD LinStatic -0.193 0.244 8.241 -0.1269 -0.1078 0.0238
1590 LIVE LinStatic -0.169 0.097 1.407 -0.0442 -0.0971 0.0099
1591 DEAD LinStatic -0.158 0.241 6.858 -0.1372 -0.0988 0.0097
1591 LIVE LinStatic 0.022 0.139 1.047 -0.0805 0.0148 0.0063
1592 DEAD LinStatic -0.913 -0.152 4.728 0.0976 -0.5783 -0.0096
1592 LIVE LinStatic -0.209 -0.052 0.129 0.0406 -0.1517 -0.0032
1593 DEAD LinStatic 1.104 -0.014 13.977 0.0117 0.5799 -0.0017
1593 LIVE LinStatic 0.317 0.006446 -0.141 0.0105 0.1508 0.000526
1594 DEAD LinStatic 0.39 -0.191 4.455 0.1075 0.2455 -0.0185
1594 LIVE LinStatic 0.04 0.019 0.049 -0.0122 0.0346 -0.0022
1595 DEAD LinStatic -0.332 -1 17.393 0.6603 -0.1695 -0.0088
1595 LIVE LinStatic -0.04 0.016 0.092 -0.0136 -0.0111 0.000208
1596 DEAD LinStatic 0.123 0.042 11.545 -0.0165 0.0552 -0.0086
1596 LIVE LinStatic 0.014 -0.017 -0.062 0.0209 -0.0046 -0.0042
1597 DEAD LinStatic -0.032 0.203 4.155 -0.0993 -0.0334 -0.0015
1597 LIVE LinStatic -0.044 -0.013 0.067 0.0207 -0.0374 -0.00028
1598 DEAD LinStatic -0.189 0.085 3.685 -0.038 -0.124 -0.0081
1598 LIVE LinStatic -0.026 -0.013 0.026 0.0187 -0.0275 -0.0043
1599 DEAD LinStatic 0.409 0.082 12.139 -0.0481 0.2892 0.0133
1599 LIVE LinStatic -0.164 0.004838 3.703 -0.004 -0.0864 0.0028
1600 DEAD LinStatic -0.537 -0.498 12.287 0.373 -0.2579 -0.0125
1600 LIVE LinStatic 0.12 0.002473 2.994 -0.006 0.0719 -9.2E-05
1601 DEAD LinStatic 0.221 -0.262 14.485 0.1656 0.1398 0.0016
1601 LIVE LinStatic 0.088 -0.013 6.952 0.0205 0.0509 0.000341
1602 DEAD LinStatic 0.448 -0.189 17.064 0.1175 0.2722 -0.0012
1602 LIVE LinStatic 0.181 -0.00529 7.94 0.014 0.1052 -0.0011
1603 DEAD LinStatic -0.947 -0.117 12.402 0.066 -0.5286 -0.0054
1603 LIVE LinStatic -0.391 -0.0043 3.415 0.0013 -0.2232 0.0057
1604 DEAD LinStatic 0.35 -0.754 11.593 0.4498 0.2132 -0.0231
1604 LIVE LinStatic 0.136 -0.00945 2.476 0.0147 0.0782 -0.0114
293.855
Peraturan dan Standar Perencanaan
1 Peraturan Perencanaan Tahan Gempa untuk Gedung SNI - PPTGIUG 2000
2 Tata Cara Perhitungan Struktur Beton Untuk Gedung SKSNI 02-2847-2002
3 Tata Cara Perencanaan Struktur Baja Untuk Bangunan Dengan Metode LRFD ITB-2000
4 Pedoman Pembebanan Indonesia untuk Gedung 1983
Referensi
1 Dewobroto, W., Aplikasi Rekayasa Konstruksi dengan SAP 2000, Elex Media Komputindo, Jakarta 2004
2
3 Kusuma, Gideon, Desain Struktur Rangka Beton Bertulang Di Daerah Rawan Gempa, Erlangga, Jakarta, 1993
4 Salmon, Charles.G. Struktur Baja Desain dan Perilaku 1 dan 2, Gramedia Pustaka Utama, 1996
5 Widodo, Respon Dinamik Struktur Elastik, UII Press, Yogyakarta, September 2001
Program Komputer
Bahan Struktur
1 Beton
Kuat beton yang disyaratkan , fcβ = 20 Mpa
Modulus Elastisitas beton = 21,019.04
2 Baja Tulangan
Tulangan di hitung menggunakan BJTP (polos) Γ 12 mm fy = 240 MPa
Tulangan begel menggunakan BJTP (polos) Γ 8 mm fy 240 Mpa
Asumsi yang Digunakan
1 Pemodelan struktur 3-D (space frame) dilakukan dengan program komputer
2 Efek P-delta diabaikan
3 Plat lantai dianggap sebagai diafragma sangat kaku pada bidangnya
Pembebanan
1 Beban pada Pelat
Pelat lantai
A Beban Hidup
Beban hidup (PPIβ83 tabel 3.1) : 250.00 kg/m2
B Beban Mati
Beban mati lantai bangunan:
Beton : 2,400.00 kg/m2
Keramik : 25.00 kg/m2
Spesi per cm tebal : 21.00 Kg/m2
Langit-langit dan penggantung 11.00 Kg/m2
Beban mati pada plat lantai :
- Beton : 1x1x0,12x2400 1 X 1 X 0.12 X 2400 : 288.00 Kg/m2
-Berat pasir tebal 5 cm 0.05 X 15 0.75 Kg/m2
-Keramik 1 X 1 X 25 25.00 Kg/m2
Wigroho, H. Y., Analisis dan Perancangan Struktur Frame menggunakan SAP 2000 versi 7.42, Andi Offset, Yogyakarta, Februari 1999
Program Komputer yang digunakan untuk analisis desain Beton dan Baja adalah SAP 2000 v. 14.1 dan Untuk pengolahan data dan
perhitungan desain manual menggunakan program excel.
Ec =4700 . ππβ²
- Spesi 3 cm 0.03 x 21 0.63 Kg/m2
Beban mati pada plat lantai 314.38 Kg/m2
2 Beban Akibat Dinding
- Beban bata (PPI'83 tabel 2.1) 250 Kg/m2
3 Beban Gempa
Wilayah Yogyakarta Situs SD (sedang)
Stori Tinggi (z) Berat (w)
2 9 293.855
1 5.5 1703.782
1997.637
I 1
R 3
T 0.50672
Cs 0.33333333
V 665.879
Ss (g) 1.255 ---> dari peta 1
S1 (g) 0.457 ---> dari peta 2
dari Tabel 4 Ss (g) Fa 1
SD
dari Tabel 5 S1 (g) Fv 1.543
SD
SMs Fa. Ss = 1 x 1.255 =
SM1 Fv . S1 = 1.543 x 0.457 = 0.705
SDs 2/3 . SMs = 0.667 x 1.255 = 0.837
SD1 2/3 . SM1 = 0.667 x 0.7052 = 0.470
Sa SD1/T = 0.47 / 0.5067 =
To 0,2 x SD1/SDs = 0.2 x 0.5619 =
Ts SD1/SDs = 0.47 / 0.8367 =
1,5Fa = 1 Fa = 0.667
SDo = 0.6 x Fa = 0.400
Cs Sds/(R/Ie) = 0.837 / 3 = 0.279
Vs Cs . W = 0.279 x ##### = 557.1
Dari Software Spectra (pu.go.id) didapat nilai
Variabel Nilai T (detik) SA (g)
PGA (g) 0.546 0 0.335
SS (g) 1255 T0 0.837
S1 (g) 0.457 TS 0.837
CRS 0.922 TS+0 0.710
CR1 0 TS+0.1 0.617
w*z2 Force
0.928
1.255
0.1124
0.562
23802.255
51539.4055
75341.6605
210.3673008
455.5116992
FPGA 1 0.837
FA 1 TS+0.2 0.545
FV 1.543 TS+0.3 0.489
PSA (g) 0.546 TS+0.4 0.443
SMS (g) 1.255 TS+0.5 0.404
SM1 (g) 0.705 0.837
SDS (g) 0.837 TS+0.6 0.372
SD1 (g) 0.47 TS+0.7 0.345
T0 (detik) 0.112 TS+0.8 0.321
TS (detik) 0.562 TS+0.9 0.301
TS+1 0.283
TS+1.1 0.267
TS+1.2 0.252
TS+1.3 0.240
TS+1.4 0.228
TS+1.5 0.217
TS+1.6 0.208
TS+1.7 0.199
TS+1.8 0.191
TS+1.9 0.183
TS+2 0.177
TS+2.1 0.170
TS+2.2 0.164
TS+2.3 0.159
TS+2.4 0.153
TS+2.5 0.149
TS+2.6 0.144
TS+2.7 0.140
TS+2.8 0.136
TS+2.9 0.132
TS+3 0.128
TS+3.1 0.125
TS+3.2 0.122
TS+3.3 0.119
4 0.117
Kombinasi Pembebanan
Semua Komponen Struktur dirancang memiliki kekuatan minimal sebesar kekuatan yang dihitung berdasarkan beban kombinasi berikut :
1 Kombinasi 1 1,4D
2 Kombinasi 2 1,2D + 1,6 L
3 Kombinasi 3 1,2D + 1,0L + 1,0Ex + 0,3Ey
4 Kombinasi 4 1,2D + 1,0L + 0,3Ex + 1,0Ey
dengan D = Dead
L = Live
Ex = Earth Quake arah x
Ey = Earth Quake arah y
Dimensi Frame
Balok B15X15 = 150 x 150 mm
B15X20 = 150 x 200 mm
B15X25 = 150 x 250 mm
B15X30 = 150 x 300 mm
B20X25 = 200 x 250 mm
B20X35 = 200 x 350 mm
B25x25 = 250 x 250 mm
B25X30 = 250 x 300 mm
B25X35 = 250 x 350 mm
B30X40 = 300 x 400 mm
Kolom K15X15 = 150 x 150 mm
K15X20 = 150 x 200 mm
K15X30 = 150 x 300 mm
K15x40 = 150 x 400 mm
Plat Lantai
Perencanaan Frame Bangunan
Perencanaan Balok
Berikut ini adalah hasil desain tulangan longitudinal maupun tulangan geser diperoleh data Dari concrete frame design SAP
2000, diambil contoh perhitungan desain balok 69 ukuran B20X35, dan untuk perhitungan desain balok lainnya
kami tabelkan
1 Daerah tumpuan
Dari sap 2000 diperoleh data luas tulangan untuk elemen tersebut :
a Tulangan longitudinal
Tulangan perlu bagian atas A = mm2
Digunakan A = 3Γ12 = 113 mm2 x 3 = 339.00
Cek A pakai > A perlu 339 > Ok
Tulangan perlu bagian bawah A = mm2
Digunakan A = 2Γ12 = 113 mm2 x 2 = 226.00
Cek A pakai > A perlu 226 > Ok
b Tulangan geser
Tulangan geser perlu A begel = mm2
Digunakan A = Γ8 - 200 = 251 mm2
Cek A pakai > A perlu 251 > Ok
1.26 > 0.287 Ok
2 Daerah Lapangan
Dari sap 2000 diperoleh data luas tulangan untuk elemen tersebut :
139.372
0.287
0.287
282.008
282.008
139.372
π΄π£
π
a Tulangan longitudinal
Tulangan perlu bagian atas A = mm2
Digunakan A = 2Γ12 = 113 mm2 x 2 = 226.00
Cek A pakai > A perlu 226 > OK
Tulangan perlu bagian bawah A = mm2
Digunakan A = 2Γ12 = 113 mm2 x 2 = 226.00
Cek A pakai > A perlu 226 > OK
b Tulangan geser
Tulangan geser perlu A begel = mm2
Digunakan A = Γ8 - 200 = 251 mm2
Cek A pakai > A perlu 251 > OK
1.26 > 0.287 OK
Perencanaan Kolom
1 Tulangan longitudinal
Berikut ini adalah hasil desain tulangan longitudinal maupun tulangan geser pada kolom diperoleh data Dari concrete
frame design SAP 2000, diambil contoh perhitungan desain kolom K15x40 ukuran 15x40, dan untuk perhitungan desain
kolom lainnya kami tabelkan
0.287
69.292
69.292
132.331
132.331
0.287
π΄π£
π
a Tulangan longitudinal
Tulangan perlu bagian atas A = mm2
Digunakan A = 8 Γ12 = 113 mm2 x 8 = 904.00
Cek A pakai > A perlu 904.0 > OK
b Tulangan geser
Tulangan geser perlu A begel = mm2
Digunakan A = Γ8 - 200 = 251 mm2
Cek A pakai > A perlu 251 > OK
1.26 > 1 OK
Perencanaan Pelat
Berikut ini adalah contoh perhitungan pelat tersebut
Beban Ultimit Qu =1,2Wd + 1,6Wl = 1.2 x 314.4 + 1.6 x 250.0 = 777.256 Kg/m2
7.77256 KN/m2
7.77E+06 N/mm2
Pelat 3.5 x 3
Sisi Terpendek Lx = 3 m 3.5 = 1.1667 3.85E+04
Sisi Terpanjang Ly = 3.5 m 3
Dari tabel 1.1 1.16666667 1.6
25 26.2 34
25 24.6 22
51 52.6 63
51 51.4 54
Sehingga Didapat Nilai Koofisien Momen Mlx = 44 Mltx = 44 Mly = 44 Mty = 44
600.000
600.000
1
1.000
π΄π£
π
πΏπ¦
πΏπ₯
Mlx = 0.001 x 7.77E+06 x 3 2 x 26.2 = 1.83E+06
Mly = 0.001 x 7.77E+06 x 3 2 x 24.6 = 1.72E+06
Mtx = 1.001 x 7.77E+06 x 3 3 x 52.6 = 3.68E+09
Mty = 2.001 x 7.77E+06 x 3 4 x 51.4 = 7.19E+09
Mtx = 0.5 x Mlx = 9.16E+05
Mty 0.5 x Mly = 8.60E+05
Perhitungan Tulangan Mlx =
b = 1000
Γtulangan = 10
dx =hpelat - pb - 0.5Γ = 120 - 20 - 5 = 95.00 mm
dy =hpelat - pb - Γ - 0.5Γ = 120 - 20 - 10 - 5 = 85.00 mm
fc' = 20 Mpa
fy = 240 Mpa
= 1.4 = 0.00583
240
= 0.85 20 0.85 0.043006
600 240
= 0.75 x 0.043 = 0.0322545
= = 2.29E+06
= = 0.253846
1000 95.00 2
= = 14.117647
0.85 20
= 0.00106571
Ο < Ο max --> digunakan tulangan tunggal
Ο < Ο min --> digunakan Οmin --> 0.005833333
As perlu Ο min . b . dx = 0.0058 x 1000 x 95.00 = 554.17 mm2
= = 7.053030303 buah
0.25 3.143 10 2 β 8.00 buah
Jarak tulangan S = 1000 = 125.00 mm
8.00
Dipakai tulangan Γ10 - 125
2290962.06
1.83E+06
0.8
240
600
240
554.1666667
ππππ =1,4
ππβ²
ππ =0,85 . ππβ²
ππ¦π½1
600
600 + ππ¦
ππππ₯ = 0.75 . ππ
π π =ππ
π . ππ₯2
ππ =ππ’
π
π =ππ¦
0.85 . ππβ²
π =1
π1 β 1 β
2. π. π π
ππ¦
ππ‘π’ππππππ =π΄π πππππ’
14 . π. π2
As ada = 0.25 x 3.143 x 10 2 1000 = 628.57 mm2
125
Asada > Asperlu OK
Perhitungan Tulangan Mly =
b = 1000
dy =hpelat - pb - Γ - 0.5Γ = 120 - 20 - 10 - 5 = 85.00 mm
fc' = 20 Mpa
fy = 240 Mpa
= 1.4 = 0.00583
240
= 0.85 20 0.85 0.043006
600 240
= 0.75 x 0.043 = 0.0322545
= = 2.15E+06
= = 0.297724
1000 85.00 2
= = 14.117647
0.85 20
= 0.00125157
Ο < Ο max --> digunakan tulangan tunggal
Ο < Ο min --> digunakan Οmin --> 0.005833333
As perlu Ο min . b . dy = 0.0058 x 1000 x 85.00 = 495.83 mm2
= = 6.310606061 buah
0.25 3.143 10 2 β 7.00 buah
Jarak tulangan S = 1000 = 142.86 mm
7.00
Dipakai tulangan Γ10 - 142
As ada = 0.25 x 3.143 x 10 2 1000 = 553.32 mm2
142
600
240
1.72E+06
0.8
2151055.98
240
495.8333333
0.25 . π . π2 .π
π
ππππ =1,4
ππβ²
ππ =0,85 . ππβ²
ππ¦π½1
600
600 + ππ¦
ππππ₯ = 0.75 . ππ
π π =ππ
π . ππ¦2
ππ =ππ’
π
π =ππ¦
0.85 . ππβ²
π =1
π1 β 1 β
2. π. π π
ππ¦
ππ‘π’ππππππ =π΄π πππππ’
14 . π. π2
0.25 . π . π2 .π
π
Asada > Asperlu OK
Perhitungan Tulangan Mtx =
b = 1000
dx =hpelat - pb - 0.5Γ = 120 - 20 - 5 = 95.00 mm
dy =hpelat - pb - Γ - 0.5Γ = 120 - 20 - 10 - 5 = 85.00 mm
fc' = 20 Mpa
fy = 240 Mpa
= 1.4 = 0.00583
240
= 0.85 20 0.85 0.043006
600 240
= 0.75 x 0.043 = 0.0322545
= = 1.15E+06
= = 0.126923
1000 95.00
= = 14.117647
0.85 20
= 0.00053084
Ο < Ο max --> digunakan tulangan tunggal
Ο < Ο min --> digunakan Οmin --> 0.005833333
As perlu Ο min . b . dx = 0.0058 x 1000 x 95.00 = 554.17 mm2
= = 7.053030303 buah
0.25 3.143 10 2 β 8.00 buah
Jarak tulangan S = 1000 = 125.00 mm
8.00
Dipakai tulangan Γ10 - 125
As ada = 0.25 x 3.143 x 10 2 1000 = 628.57 mm2
125
Asada > Asperlu OK
600
240
9.16E+05
0.8
1.15E+06
240
554.1666667
ππππ =1,4
ππβ²
ππ =0,85 . ππβ²
ππ¦π½1
600
600 + ππ¦
ππππ₯ = 0.75 . ππ
π π =ππ
π . ππ₯2
ππ =ππ’
π
π =ππ¦
0.85 . ππβ²
π =1
π1 β 1 β
2. π. π π
ππ¦
ππ‘π’ππππππ =π΄π πππππ’
14 . π. π2
0.25 . π . π2 .π
π
Perhitungan Tulangan Mly =
b = 1000
dy =hpelat - pb - Γ - 0.5Γ = 120 - 20 - 10 - 5 = 85.00 mm
fc' = 20 Mpa
fy = 240 Mpa
= 1.4 = 0.00583
240
= 0.85 20 0.85 0.043006
600 240
= 0.75 x 0.043 = 0.0322545
= = 1.08E+06
= = 0.148862
1000 85.00 2
= = 14.117647
0.85 20
= 0.00062300
Ο < Ο max --> digunakan tulangan tunggal
Ο < Ο min --> digunakan Οmin --> 0.005833333
As perlu Ο min . b . dy = 0.0058 x 1000 x 85.00 = 495.83 mm2
= = 6.310606061 buah
0.25 3.143 10 2 β 7.00 buah
Jarak tulangan S = 1000 = 142.86 mm
7.00
Dipakai tulangan Γ10 - 142
As ada = 0.25 x 3.143 x 10 2 1000 = 553.32 mm2
142
Asada > Asperlu OK
Kesimpulan
600
240
8.60E+05
0.8
1075527.99
240
495.8333333
Dari analisis hitungan tulangan pelat diatas kemudian dibandingkan dengan pelaksanaan di lapangan seperti pada Tabel 1. berikut : Tabel 1.
Hasil Hitungan Analisis Pelat
ππππ =1,4
ππβ²
ππ =0,85 . ππβ²
ππ¦π½1
600
600 + ππ¦
ππππ₯ = 0.75 . ππ
π π =ππ
π . ππ¦2
ππ =ππ’
π
π =ππ¦
0.85 . ππβ²
π =1
π1 β 1 β
2. π. π π
ππ¦
ππ‘π’ππππππ =π΄π πππππ’
14 . π. π2
0.25 . π . π2 .π
π
Hasil HitunganJenis Penulangan Pelaksanaan di Lapangan
Lapangan arah X Γ10 - 125 Γ10 - 125
Lapangan arah Y Γ10 - 142 Γ8 -75
Tumpuan arah X Γ10 - 125 Γ8 -75
Tumpuan arah Y Γ10 - 142 Γ8 -75