Pengenalan Sistem Elektrik,
Instalasi dan Hazardous Areapada MODU (Mobile OffshoreDrilling Unit)
Oleh:
Pandhu A. Lakshana
Materi Tambahan untuk Kelas COGII IKBAL M. YOS Batam
Dengan Menggunakan Rujukan ABS RulesUntuk MODU
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
2/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
3/94
Turbine Generator
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
4/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
5/94
Main Switchboard - HV
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
6/94
LV Switchboard
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
7/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
8/94
HV and LV Switchboards
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
9/94
HV and LV SwitchboardsA High Voltage Electrical system is defined as a system havingnominal voltage (phase to phase) exceeding 1 kV, but not to
exceed 15 kV. Onshore electrical classifications would considerthis as Medium Voltage
The selection of a high voltage system for ship service dependsfrom several factors and is in particular dictated by the required
generator outputs.
In general:
Low voltage system is suitable when the nominal output of eachgenerator is below 8000 kWHigh voltage system is suitable when the nominal output of eachgenerator is over 10000 kWBoth systems are suitable when the nominal output of each generator
is between 8000 and 10000 kW
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
10/94
SAFETY FEATURE IN HV
SYSTEMHV switchgear & control-gear assemblies
Item LV Switchgear HV Switchgear
IP Degree forControl Room
IP22 IP32
Circuit Breaker orDisconnecting
Switch
Plug-in type isallowable
(Non-Withdrawable)
To be Withdrawable
MechanicalLocking Facility Not Applicable Applicable
Shutter forCircuit Breaker
Not Applicable Applicable
Comparison between LV and HV switchgear:
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
11/94
SAFETY FEATURE IN HV
SYSTEMHV switchgear & control-gear assemblies (Contd
Comparison between LV and HV switchgear:Item LV Switchgear HV Switchgear
Earthing andShort Circuiting
FacilityNot Applicable Applicable
Earth FaultDetection
Not Applicable Applicable
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
12/94
(a) Runs of cables:
Not to run through accommodation space
(b) Segregation of cables:
Segregation of HV cables operating at different voltageratings each other
Not to install HV cables inthesame cable tray for LV cables
SAFETY FEATURE IN HV SYSTEM
HV Cable installation
(c) Marking of cables:
Marking for Identification
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
13/94
Single Line Diagram
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
14/94
Single Line DiagramQuestions
- What is the difference between a Bus transfer feederand a Bus tie?
- Bus transfer feeder has 2 circuit breakers
connected and both switchboards are physicallysegregated by fire proof wall or partition
Bus transfer feeder connects 2 switchboardsseparated by Fire-proof wall / partition
Bus tie exists in the same cubical/ room
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
15/94
Single Line Diagram
1. Only G1 CB trip
2. TB will trip, followed by G1 CB
3. Only CB of feeder will trip4. TB will trip, followed by G2 CB
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
16/94
Single Line Diagram
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
17/94
Single Line Diagram
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
18/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
19/94
Single Line Diagram
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
20/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
21/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
22/94
Single Line Diagram 3 split
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
23/94
Single Line Diagram
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
24/94
Single Line DiagramDiscussion
- How many thruster will be lost if Main SWBD 1 fails ?- Only one thruster
- If the SWBD 1 and SWBD 2 run in single bus andassuming no protection scheme on the SWBD, then a
short circuit is occurred on the bus, how manythrusters will be lost ?
- Three thrusters
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
25/94
Single Line Diagram
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
26/94
Single Line DiagramDiscussion
- From where the Switchboard HS1 is getting the supply ?
- Main Generator 1 and Main Generator 2
- Do the both GS on each Main Switchboard (HS1, HS2, HS3)required to run together ?
- No, bus tie feeders between switchboards can be closed to
make synchronization between generators and share theload
- What is the bus bar rating for Main Switchboard ?
- 11KV, 2000A, 60Hz, 31.5KA, 1 sec
- Compare to the incomer breaker, which one is bigger ? Why ?- Incomer breaker 1250A, bus bar rating is bigger. If there is aovercurrent exceeds the breaker rating, it is still safe for thebus bar because the nominal current rating is bigger than itsincomer
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
27/94
Single Line DiagramDiscussion
- From Where Emergency Switchboard is getting the main supply?
- From Bus A and Bus C 690V Switchgears
- If the Main Switchboard HS1 is lost, can the vessel still perform
drilling operation ?- Yes, because drilling switchgears have three (3) independent
bus sections with NORMALLY OPEN breaker between thesections and each having supply from each 11KV MainSwitchgear sections via transformer feeders
- If there is a fire on Main Switchboard Room HS2. What will behappen on other SWBD (HS1 and HS3) ?
- Not affected. A60 partition bulkhead between switchgears areavailable and bus tie feeders between switchgears are
NORMALLY OPEN during normal operation
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
28/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
29/94
Single Line DiagramDiscussion
- If all Main switchboard run in 4 splits mode, andSWBD MV2 is lost. Can the vessel perform drillingusing No.1 Drilling Drive Switchboard ?
- Can, interlock mechanism on the No.1 drilling drive
switchboard incoming breaker will be opened andclosed the breaker on No.2 drilling driveswitchboard. At the same time bus tie feederbetween the switchboards are closed
- If the Main Distribution & MCC LV3 is lost due to shortcircuit on the bus bar, can the operator operate theDrilling MCC2 ?
- No
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
30/94
Hazardous Areas
Zone 0 in which an explosive air mixture iscontinuously present or present for long periods.
Zone 1 in which an explosive air mixture is likely tooccur in normal operation.
Zone 2 in which an explosive air mixture is not likelyto occur in normal operation and if occurs will existonly for a short period.
Non.HA none of the above.
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
31/94
Hazardous Areas Enclosed Areas -a space bounded by decks
and bulkheads which may or may not havedoors, windows or other similar openings.
Semi Enclosed Locations - a location where adispersion of gas may not occur due to thepresence of structure.
Open Areas
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
32/94
Hazardous AreasHazardous Areas Zone 0 Include: i) The internal spaces of closed tanks and pipes of the mud circulating system between the
welland the final degassing discharge, e.g., escape gas outlets,
ii) The internal spaces of closed pipes and tanks for oil and gas products, iii) Other spaces in which an oil-gas mixture is present, continuously or for long periods.
Hazardous Areas Zone 1 Include: i) Enclosed spaces containing any part of the mud circulating system that has an opening
into the spaces and is between the well and the final degassing discharge.
ii) Outdoor or semi-enclosed locations within 1.5 m (5 ft.) from the following: openings toequipment which is part of the mud system); any ventilation outlets from Zone 1 spaces;and any access to Zone 1 spaces.
iii) Pits, ducts or similar structures in locations which otherwise would be Zone 2 but whichare arranged so the dispersion of gas may not occur.
iv) Enclosed spaces or semi-enclosed locations that are below the drill floor and contain apossible source of release of gas such as the top of a drilling nipple.
v) Enclosed spaces that are on the drill floor and which are not separated by a solid floorfrom the spaces
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
33/94
Hazardous Areas Zone 2 Include: i) Enclosed spaces which contain open sections of the mud circulating system from the
final degassing discharge to the mud pump suction connection at the mud pit.
ii) Outdoors locations within the boundaries of the drilling derrick up to a height of 3 m (10ft.) above the drill floor
iii) To the extent of their enclosure, semi-enclosed locations that are on the drill floor andwhich are not separated by a solid floor from the spaces).
iv) Semi-enclosed derricks to the extent of their enclosures above the drill floor or to aheight of 3 m (10 ft.) above the drill floor, whichever is greater.
v) Semi-enclosed locations below and contiguous with the drill floor and to the boundaries
of the derrick or to the extent of any enclosure which is liable to trap gases. vi) Outdoor locations below the drill floor and within a radius of 3 m (10 ft.) from a possible
source of release gas such as the top of a drilling nipple.
vii) The areas 1.5 m (5 ft.) beyond the Zone 1 areas specified in 4-1-3/3.3ii) and beyond thesemienclosed locations specified in 4-1-3/3.3iv).
viii) Outdoor locations within 1.5 m (5 ft.) of the boundaries of any ventilation outlet fromZone 2 spaces, or any access to Zone 2 spaces, except where 4-1-3/5.3 applies.
ix) (1995) Air lock spaces between Zone 1 and nonhazardous space, in accordance with 4-1-3/5.5i).
Paint Store is considered Hazardous Area
Hazardous Areas
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
34/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
35/94
Hazardous AreasTypical equipment in Zone 0 and 1 Explosion proof: the enclosure withstands and explosion
inside and prevents propagation. Intrinsically safe ia & ib: an intrinsically safe barrier is
installed in a safe area to avoid sparks by limiting theenergy to the circuit in the hazardous area.
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
36/94
Hazardous Areas Two Different Standards:
International Electrotechnical Commission
(IEC Series 79): Zone 0, 1, 2 National Electric Code (NEC Art 500):
Class I Div1, Div 2
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
37/94
Class I Div 1: locations in which ignitable
concentration of flammable gas or vapors mayexit under normal operating conditions or suchconcentrations may exits frequently due torepairs, maintenance or leakage.
Class I Div 2: locations in which ignitableconcentration of flammable gas or vapors would
occur only as result of accident or breakdown ofsystems, or in which concentrations are normallyprevented by mechanical or natural ventilation.
Hazardous Areas
H d A
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
38/94
Surveyor/ Inspector:
Equipment nameplate shows suitability foruse in hazardous area.
Hazardous Areas
What spaces are classified as
HAZARDOUS AREAS in a MODU? ForABS Rule
Drill Floor
Shale Shaker, Degasser, Desander, Desilter
Mud Tanks or Mud Pits
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
39/94
Hazardous Areas What to look for in a nameplate on
equipment installed in hazardous area The Testing Labs name: CSA, UL or others
The Certificate No.
The Hazardous Area Marking
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
40/94
Hazardous Areas .
Cert No.Testing Labs Name
Hazardous
Area
Marking
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
41/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
42/94
Hazardous AreasWhats wrong with this nameplate?
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
43/94
Hazardous Areas Nameplate IEC
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
44/94
Hazardous Areas
However:
Zone 2 equipment Class I Div 2
Zone 1 equipment Zone 0 equipment Class I Div 1
There is NO equivalency between
Zone and Division!!!
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
45/94
Hazardous Areas If an enclosure or room installed in hazardousareas, but equipment inside not been certified and
the box itself is not explosion-proof.
Purged Pressurized System.
positive pressure in relation to the surroundedatmosphere. (NPA 496 or IEC 79-2).e.g: drillersconsole.
Solution
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
46/94
Hazardous Areas Ventilation is Hazardous Areas Ventilation inlets and outlets - Ventilation inlets be located in
nonhazardous areas. and completely separate from that for
nonhazardous areas. More critical less pressure flow from less to more
Number of air changes required for enclosed mud pits - Every twominutes.
Ducts passing though hazardous zones - Under pressure in to lesshazardous areas and at overpressure to more hazardous areas are to be rigidly constructed to avoid air leaks. Ventilation of non Harzardous zones - to be located in nonhazardous
area and overpressure in relation to the hazardous area.
Self closing doors are required between nonhazardous and hazardouszones
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
47/94
Hazardous Areas
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
48/94
Hazardous Areas
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
49/94
Hazardous Areas
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
50/94
Hazardous Areas Boilers and engines
Exhaust outlets outside the Hazardous area andfitted with non sparking devices
Air intakes at least 03 meters form Hazardousareas
Can not be installed in Zone 0
Can be installed in Zone 1 and 2 under specialconsideration
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
51/94
Hazardous Areas All jacking or other elevating systems are to be
constructed and installed in accordance with
approved plans.
Jacking Trial - the completed hull up to the
limit of designed travel and then down again
Instrumentation - the controls for elevatingoperations.
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
52/94
Hazardous AreasSpecial Considerations.
Electrical equipment in exterior locations andoperable after total shutdown needCERTIFICATION (at least Class I Div 2)
although may not be installed in a hazardousareas.
Rational: after a blow out, gas may present
throughout the platform, and the equipmentoperable is to be safe with presence of gas.
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
53/94
Special Considerations
Brushless motors (and other similar
equipment) can be installed in Class I Div2(NEC 501.8B) with no hazardous areacertification, i.e. squirrel cage motors.
Requirement: Nameplate is to show the max surface T
(C) for the space heater. The exposed surface of thespace heater is not to be above 80 % of the ignition T(C) of the gas involved
Hazardous Areas
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
54/94
Hazardous Area Case Study I In the drawing the area below the Drillfloor is
shown as totally enclosed with hazardousarea defined as Zone 2.
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
55/94
Hazardous Area Case Study I As per ABS rules: Zone 1: Enclosed spaces or
semi-enclosed locations that are below thedrillfloor and contain possible source of releaseof gas such as the top of a drilling nipple.(Assumption - not adequately ventilated)
As per ABS rules : Zone 2: Semi-enclosedlocations below the drillfloor which are liable totrap gases. (Assumption not adequatelyventilated)
Hazardous Area Case Study I
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
56/94
Hazardous Area Case Study I
Hazardous Area Case Study I
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
57/94
Hazardous Area Case Study I
Hazardous Area Case Study I
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
58/94
y
Hazardous Area Case Study I
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
59/94
Adequately Ventilated ?
Why ?
y
Hazardous Area Case Study I
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
60/94
API 505 6.6.2.4.7 partially enclosed area
are considered adequately ventilated:a)a building or area having a roof or ceiling withwalls comprising 50% or less vertical wall area
than the total wall area possible is consideredto be adequately ventilated (regardless of thetype of floor).
b)A building or area is considered to beadequately ventilated provided it has neither afloor (for example, the floor is grating) nor a
roof or ceiling.
y
Hazardous Area Case Study II
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
61/94
Drillers Cabin modification:
Previously it was a shelter with the controls.
The client has added walls and roof to theshelter, including A/C system and ergonomiccontrols.
The new drillers cabin has been rated as
non-hazardous location.
The floor has some cables penetrations.
Hazardous Area Case Study II
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
62/94
What do we have to check?
Hazardous Area Case Study II
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
63/94
Hazardous Area Case Study II
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
64/94
Acceptable ?
Hazardous Area Case Study II
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
65/94
What do we have to check?
Driller's Cabin Door Opening From Non-hazardous Location Towards aHazardous Location
1) The Driller's Cabin will be pressurized in accordance to NFPA 496(Chapter 5) or equivalent standard so that the interior of the Driller'sCabin is a non-hazardous location. NFPA 496 (Chapter 5.4) requiresthat the pressurization system is capable of maintaining a positivepressure of 25 Pa (0.1 in. water) with all openings closed and tomaintain a minimum outward air velocity of 60fpm (0.305m/sec) when
all openings are open. An alarm is to be fitted for low pressure in thecabin.
2) It is to be demonstrated that the door remains gas tight afterclosing on its own.
3) For units where ABS is issuing the MODU Code certificate thegovernment administration agreement is required.
Hazardous Area Case Study III
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
66/94
Enclosed spaces containing any part of the mudcirculating system are considered Hazardous areas asper ABS MODU Rules.
However Mud laboratories on mobile offshore drilling rigsare not considered Hazardous spaces.
Why ?
Mud laboratories
Hazardous Area Case Study III
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
67/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
68/94
Drilling Mud System
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
69/94
Hazardous Area Case Study III
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
70/94
Why ?
1) The mud laboratory has no direct piping connection to the mudcirculating system.
2) A mechanical ventilation system providing at least six (6) air changesper hour is provided to the mud laboratory.
3) Mud samples taken for analysis are to be taken after the muddegassing process.
4) Mud samples are not to be stored in the mud laboratory.
5) Proper precautions (e.g., warning notice) are to be taken to insure thatthe ventilation system of the mud lab is always on when mud sampleanalysis is underway.
Exercise
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
71/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
72/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
73/94
Electrical Installations LARGE: battery charger above 2Kw. Battery room:
The room is to have natural or mechanicalventilation, capable of changing the airevery 2 min or alternatively, to maintain the
gas level below the lower explosive limit(LEL).
Exhaust vent at the top of the room, and
the inlet vents near the floor.Trays for batteries are to be chocked withwood strips and each tray is to be fittedwith nonabsorbent insulating supports
HAZARDOUSAREA OR NOT
HAZADOUSAREA ?
It is classifiedas HAZARDOUS
AREA
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
74/94
Special attention to UPS installed in
Air Conditioned Control Room. UPS must be certified for use in a control
room.
Hydrogen emission can add to beconsidered Hazardous Area.
Electrical Installations
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
75/94
Electrical InstallationsSwitchboard Are to be located in a dry place so as to provide a clear working
space at the front of the switchboard and a clearance at the
rear
Safety-type Panels Dead front type panels are to be used where voltage to earth is
in excess of 50 volts DC / 50 volts AC Disconnecting Arrangements The disconnecting device is to be externally operated. If the disconnecting device is not within sight of both motor
and controller, or if it is consider far (based on class/regulation) from either, it is to be arranged for locking in theopen position.
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
76/94
Electrical Installations Receptacles and Plugs of Different Ratings
Receptacles and plugs of different electricalratings are not to be interchangeable so 110
V can not fit 230 V
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
77/94
Electrical InstallationsArmored cable: (zone 1).Bronze, tinned copper or aluminum braid,sometimes between the inner jacket and the outer sheath.
Rational: Protection against mechanical and physical damage.
Armored Cable
Armor
Sheath
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
78/94
Electrical Installations
Armored cable must be grounded at each end.
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
79/94
Electrical Installations
Armored cable must be grounded at each end.
Question : If the armored cable is notgrounded at each end, so what ???
Electrical Installations
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
80/94
What happens if the armor is damaged?
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
81/94
Electrical Installations
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
82/94
Electrical Installations
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
83/94
Need to be replaced ?
Why ?
How about if it installed in Hazardous Area ?
Electrical Installations
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
84/94
Deck and Bulkhead Penetrations
Where cables pass through watertight, firetight or smoke-tightbulkheads or decks, the penetrations are to be made through the
use of approved stuffing tubes, transit devices or pourablematerials which will maintain the watertight, firetight or smoke-tight integrity of the bulkheads or decks
When cables pass through non-watertight bulkheads where thebearing surface is less than 6.4 mm (0.25 in.), the holes are to befitted with bushings having rounded edges and a bearing surfacefor the cable of at least 6.4 mm(0.25 in.) in length.
Where cables pass through deck beams or similar structural partscare is to be taken to eliminate sharp edges.
Where cable conduit pipe or equivalent is carried through decks orbulkheads, arrangements are to be made to maintain the integrityof the water or gas tightness of the structure.
Cables are not to pass through a collision bulkhead.
Electrical Installations
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
85/94
High Voltage Cable Installation
In accommodation in enclosed transit system
Continuous (grounded) metal sheath or armour orcasing
Not to be in the same cable bunch, duct, pipe or boxas LV circuits
Separate junction boxes are to be used for each ofthe rated voltage levels exceeding 1 kV.
Same cable tray ok for different HV cables; but
observe clearance distances for the higher one
Electrical Installations
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
86/94
Apply DC voltage:1.6(2.5Uo +2kV) for cables 1kV < Uo =3.6kV
For 15 minutes Dont forget to discharge the cable
Repeat insulation resistant test
Alternatively a full voltage test for 24 hours couldbe accepted if advised by cable manufacturer
Test After Installation and after insulation resistanttesting
Electrical Installations
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
87/94
Operation After Shutdown
The following services are to be operable after an emergency shutdown:
Emergency lighting for half an hour
General alarm
Blow-out preventer control system
Public address system
Distress and safety radiocommunications
Note - Exterior locations - Zone 2 .
Fire Detection
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
88/94
Early detection of fire is essential if fire damage is to be minimized
Fires may be detected by personnel observation or by automaticdevices
Where does ABS require fire detectors in a MODU?
Unmanned Machinery Space
Service Spaces Accommodation Spaces Smoke Detectors
Flame detectors
are to be used inaddition of otherfire detectors.
Flame detectors even
though are fast detectors,
they may give false alarms.
Rational
Gas Detection
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
89/94
Gas indication panels areto be located at the drill floor
and control room.
Audible & visual alarm Location & concentration of gas
Where does ABS require GAS detectors in a MODU?
Cellar Deck
Drill Floor
Mud Pit Area
Shale Shaker Area
Other enclosed spaces containing open componentsof the mud circulation system
Gas Detectors in Production
F iliti
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
90/94
FacilitiesFacilities Guide
Gas Detectors to be provided at fresh air inlets tonon-classified areas
Gas detectors is not required but recommended in
process areas Facility shutdown is required at high gas detection
If no gas detectors in- the process area, the
shutdown will be based on the gas detection atfresh air inlets
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
91/94
Fire Detection Case Study
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
92/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
93/94
-
8/11/2019 Pengenalan Sistem Elektrik Rev (2)
94/94
Questions