STATEMENT SHOWING ACHIEVMENTS OF TELECOM UNIT OF MURI FORTHE MONTH OF OCTOBER 2010.
1. At MURI to RMT UTS Channel 64kbps shifted from Ericssion MUX toWebfil MUX & also 64kbps modem shifted from M/W/Muri to TR/Muri
during this month.
2. At central panel 02 Nos. of new Railway Telephone connection provided(87452 & 87304) on 05.10.10.
3. 6qd cable laid & back filling completed between JAA-THO (1Km) forpatching work on dated 12.10.10.
4. 6qd cable laid & back filling completed between THO-MURI(1Km) forpatching work on dated 13.10.10.
5. PA system installed at the following station:-
a. BLNG on dated 20.10.10.b. HRBR on dated 21.10.10.c. MAEL on dated 22.10.10.d. JHMR on dated 23.10.10.e. TRAN on dated 24.10.10.f. HSNL on dated 25.10.10.
g. JAA on dated 25.10.10 (JAA PA. System again newly installed dueto very poor wiring existed there, existing horns were not properlymatched and the repaired amplifier was not working properly).
6. Emergency sockets repairing at the following kms :-
a. GRE-HRBR = 02nos at km.no.381/23&376/31 on dated 22.10.10.
b. JAA-KSX =01no at km.no.374/15 on dated 20.10.10.
c. JHMR-LTMD =01no at km.no.313/4 on dated 20.10.10.d. SSIA-TRAN =01no at km.no.339/14 on dated 21.10.10.e. GDBR-CNI =03no at km.no.287/14,289/7&287/7 on dated
25.10.10.
Copy to Sr. DSTE/RNC & ADSTE/MURI information please.
SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
2/18
STATEMENT SHOWING THE PERFORMANCE OF AUTO ANNOUNCEMENTFOR THE MONTH OF OCTOBER 2010.
SL.N
O.
Name of the
circuit
IN RIG
HT
REMARKS
DATE TIME
DATE TIME
01 Autoannouncement
No failurereported.
Copy to Sr. DSTE/RNC & ADSTE/MURI information please.
SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
3/18
STATEMENT SHOWING THE PERFORMANCE OF BLOCK CIRCUIT FOR THEMONTH OF OCTOBER 2010.
SL.No.
Name ofthe circuit
IN RIGHT REMARKS
DATE TIME
DATE TIME
01 MURI-BLNG 27.09.10
00.00
27.09.10
11.20
Due to 60Mtrs switchboard cable cut &damaged at km.no.360/7-9.
02 THIO-JAA 29.09.10
17.51
30.09.10
09.25
Due to 4qd cable cut &damaged at km. no.363/8.
03 MURI-BLNG 12.10.10
22.15
19.10.10
00.50
160mtrs switch boardcable cut.
04 RMT-BRKA 15.10.10
07.00
15.10.10
14.45
Due to cable cut.
Copy to Sr. DSTE/RNC & ADSTE/MURI information please.
SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
4/18
STATEMENT SHOWING THE PERFORMANCE OF FOIS (TMS, RMS, CMS)FOR THE MONTH OF OCTOBER 2010.
SL.No.
Name of thecircuit
IN RIGHT REMARKSDATE TIM
E
DATE TIM
E01 MURI/LOCO
CMS02.10.10
02.15
03.10.10
12.00
Modem shifted fromMURI/VHF to MURI/TR.
02 MURI/LOCOCMS
10.10.10
16.20
10.10.10
17.15
Modem reset.
Copy to Sr. DSTE/RNC & ADSTE/MURI for information please.
SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
5/18
STATEMENT SHOWING THE PERFORMANCE OF OFC MUX FOR THEMONTH OF OCTOBER 2010.
SL.No.
Name of thestation
IN RIGHT REMARKS
DATE TIME
DATE TIME
01 GRE MUX 08.10.10
13.38
08.10.10
18.40
110Mtrs OFCCable joint atkm. no. 384/7-8
02 JAA MUX 25.10.10
08.00
25.10.10
08.15
Webfil muxreset.
Copy to Sr. DSTE/RNC & ADSTE/MURI for information please.
SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
6/18
STATEMENT SHOWING THE PERFPORMANCE OF 25W VHFCOMMUNICATION FOR THE MONTH OF OCTOBER 2010.
SL.NO.
Name of thestation
IN
RIGHT REMARKS
DAT
E
TIM
E
DAT
E
TIME
01. 25 Watt VHFSET
No failure during thismonth.
Copy to Sr. DSTE/RNC & ADSTE/MURI information please.
SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
7/18
STATEMENT SHOWING THE PERFORMANCE OF GATE PHONES FOR THEMONTH OF OCTOBER 2010.
SL.NO.
Name of the Gate& km. no.
IN RIGHT
REMARKS
DATE TIME
DATE TIME
01 Kushi gate atkm.no.3443/6between ILU-TRAN
No failure reported.
02 Pacharu gate at km.no. 365/11 betweenBLNG-SND
No failure reported.
03 Shukla gate at km.no. 369/8 betweenBLNG-HRBR
No failure reported.
04 Noadih gate at km.no. 370/15 betweenBLNG-HRBR
No failure reported.
05 JHMR-GDBR Gate atKm.No.301/7
No failure reported.
06 BRKP-GRE Gate atKm.No.390/15
No failure reported.
07 JAA-KSX Gate atkm.no.368/3
No failure reported.
Copy to Sr. DSTE/RNC & ADSTE/MURI information please. SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
8/18
STATEMENT SHOWING THE PERFORMANCE OF P.A.SYSTEM FOR THEMONTH OF OCTOBER 2010
SL.NO.
Name of thecircuit
IN RIGHT REMARKS.DATE TIM
EDATE TIM
E
01 THO-PASYSTEM
No failurereport.
02 JAA-PA SYSTEM 17.10.1020.10.1024.10.10
13.0007.0009.00
19.10.1023.10.1025.10.10
18.4511.3018.20
AmplifierDefective.Amplifierdefective.Amplifierdefective.
03 MURI-DY.SS PASYSTEM
AmplifierDefective.
04 GRE-PA SYSTEM 22.09.10
13.10
02.10.10
13.00
AmplifierDefective.
05 BRKP-PASYSTEM
No failurereport.
06 RMT-PASYSTEM
No failurereport.
07 SSIA-PASYSTEM
No failurereport.
08 TUL-PA SYSTEM No failurereport.
09 LTMD-PASYSTEM
27.09.10
05.30
28.09.10
10.30
Line wire break.
10 GDBR-PA
SYSTEM
No failure
report.
Copy to Sr. DSTE/RNC & ADSTE/MURI for information please.
SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
9/18
STATEMENT SHOWING THE PERFORMANCE OF CONTROL PHONES FORTHE MONTH OF OCTOBER 2010.
SL.NO
Name of thecircuit
IN RIGHT Remarks.
DATE TIM
E
DATE TIME
01 TPC.BRKA/TSS 13.10.06
22.00
0+5+0 cabledefective.
02 TPC/TC.RWP 13.11.07
12.00
4 QD cable faulty.
03 KSX CNL atMURI/N/O/Cabin
26.09.10
08.00
26.09.10
21.30 DTMF cardchanged.
04 KSX CNL at KSX 27.09.10
11.00
07.09.10
12.00 Telephonechanged.
04 BRKA CNL at BRKA 20.09.10
16.15
28.09.10
17.30 Buzzer changed.
05 KSX CNL at KSX 28.09.1
0
14.2
0
28.09.1
0
16.30 DTMF card TX
wire break.06 RC at TRAN/SSP 28.09.1
017.00
29.09.10
10.10 RC equipmentfaulty.
07 MURI/TSS/RC 28.09.10
17.30
28.09.10
19.30 Cable Pairchanged.
08 RC at TRAN/SSP 24.09.10
16.30
01.10.10
12.00 RC equipmentfaulty.
09 KSX CNL atMURI/N/O/Cabin
01.10.10
06.40
01.10.10
15.30 DTMF cardchanged.
10 KSX CNL at KSX 01.10.10
20.50
01.10.10
22.25 TX gainadjustment.
11 RC at TRAN/SSP 23.09.1
0
11.4
0
02.10.1
0
13.00 Cable Pair
changed.12 KSX CNL at KSX 02.10.1
017.00
03.10.10
01.00 Telephone & cardchanged.
13 KSX CNL at THO 03.10.10
06.30
03.10.10
01.00 Card changed.
14 RC at BRKP/TSS 03.10.10
17.30
03.10.10
23.45 Automaticallyright.
15 TPC CNL at BRKA 19.09.10
12.05
04.10.10
23.00 Cable Pairchanged.
16 BRKA CNL at ILU 04.10.10
16.20
05.10.10
21.25 DTMF Card wirebreak.
17 BRKA CNL atMURI/LOCO
01.10.10
14.00
07.10.10
15.30 Charger changed.
18 TPC CNL atMURI/TSS
18.09.10
10.00
08.10.10
09.30 Cable defective.
19 KSX CNL atMURI/ENQ
29.09.10
11.30
08.10.10
17.00 Card changed.
20 TPC CNL atMURI/TSS
09.10.10
11.35
39.10.10
13.00 Wire loose.
21 RC at MURI/TSS 09.10.1 15.0 09.10.1 18.00 RC equipment
-
7/31/2019 Pcdo Fo Achivments
10/18
0 0 0 faulty.22 BRKA CNL at BRKA 10.10.1
009.32
10.10.10
15.50 MUX Card reset.
23 BRKA CNL atMURI/LOCO
11.10.10
22.00
12.10.10
10.30 Fuse burnt.
24 RC at TUL/TSS 15.10.10
18.00
16.10.10
10.15 RC equipmentfaulty.
25 BRKA CNL at GDBR 18.10.10
17.00
19.10.10
12.00 Card changed.
26 KSX CNL at KSX 22.10.10
12.30
22.10.10
17.00 TX Gain adjust.
Copy to Sr. DSTE/RNC & ADSTE/MURI for information please.
SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
11/18
STATEMENT SHOWING THE PERFORMANCE OF RADIO PATCH AND E1PATCHING FOR THE MONTH OF OCTOBER 2010.
Sl.
No.
Name of the circuit Date of
testing
Reading
Recorded
Remarks/Tested by
DATE TME Testingpoint
Hatia
01 Hatia- RMT BSNL E1patch
21.10.10
08.00 Tested by Hatia/CNLTestroom-H.B.Singhand Muri Testroom-Nitu Devi found ok.
02 Hatia- KSX MW Radiopatch
13.10.10
10.10 Tested by Hatia/CNLTestroom-H.B.Singhand Muri Testroom-Nitu Devi found ok.
-do- 20.10.10
13.15 Tested by Hatia/CNLTestroom-H.B.Singhand Muri Testroom-Nitu Devi found ok.
03 Hatia- JAA E1Protection
21.10.10
08.15 Tested by Hatia/CNLTestroom-H.B.Singhand Muri Testroom-Nitu Devi found ok.
04 Hatia- CNI E1Protection
21.10.10
08.30 Tested by Hatia/CNLTestroom-H.B.Singhand Muri Testroom-Nitu Devi found ok.
05 Hatia- BRKA E1patch
21.10.10
09.00 Tested by Hatia/CNLTestroom-H.B.Singhand Muri Testroom-Nitu Devi found ok.
Copy to Sr. DSTE/RNC & ADSTE/MURI information please.SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
12/18
STATEMENT SHOWING THE PERFORMANCE OF AUTO TELEPHONES FORTHE MONTH OF OCTOBER 2010.
SL.NO
TELENOS.
IN RIGHT REMARKS
DATE TIME DATE TIME
01 87373 24.09.
10
11.2
0
26.09.1
0
09.00 O/H break.
02 87368 24.09.10
16.00
26.09.10
09.30 Cable pair changed.
03 87446 26.09.10
08.20
28.09.10
09.00 Wire break.
04 87363 28.09.10
08.00
28.09.10
09.10 Cable pair changed.
05 87406 29.09.10
07.00
04.10.10
21.0 MUX Problem.
06 87427 29.09.10
23.15
30.09.10
11.00 Noise.
07 87430 24.09.10
10.00
01.10.10
05.00 Hand cord changed.
08 87315 29.09.10
11.40
02.10.10
08.00 O/H break.
10 87352 02.10.10
06.30
02.10.10
08.45 Cable pair changed
11 87373 28.09.10
16.00
04.10.10
13.00 Wire break.
12 87465 02.10.10
09.30
04.10.10
10.20 Line cord changed.
13 87374 03.10.10
12.00
04.10.10
10.20 O/H break.
14 87404 04.10.10
13.30
04.10.10
17.25 Cable pair changed
15 87424 28.10.
10
11.0
0
05.10.1
0
11.00 Cable pair changed
16 87381 04.10.10
07.30
05.10.10
10.00 O/H break.
17 87333 05.10.10
06.20
05.10.10
10.00 Cable pair changed
18 87407 03.10.10
17.30
05.10.10
18.00 MUX Problem.
19 87466 04.10.10
16.20
05.10.10
21.25 Cable Burnt.
20 87315 06.10.10
09.40
06.10.10
17.00 Telephone Changed.
21 87333 06.10.10
10.00
06.10.10
15.00 Link short.
22 87476 04.10.10
09.30
07.10.10
10.30 O/H/ Break.
23 87390 07.10.10
13.00
07.10.10
17.00 CT.BOX wire break.
24 87341 05.10.10
18.45
08.10.10
08.40 Wire break
25 87350 07.10.10
09.40
08.10.10
09.00 O/H break.
27 87351 07.10. 09.4 08.10.1 09.10 Wire break
-
7/31/2019 Pcdo Fo Achivments
13/18
10 0 0
28 87323 27.09.10
16.00
09.10.10
11.30 Telephone Changed.
29 87324 09.10.10
10.10
12.10.10
08.30 Cable pair changed
30 87420 12.10.
10
10.0
0
12.10.1
0
13.00 Wire break
31 87373 12.10.10
10.00
13.10.10
09.20 Cable pair changed
32 87342 12.10.10
10.00
13.10.10
10.10 Cord changed.
33 87331 12.10.10
10.00
13.10.10
09.40 Telephone Changed.
34 87352 13.10.10
05.00
13.10.10
09.00 Wire Break.
35 87401 15.10.10
11.00
17.10.10
10.30 Telephone Changed.
36 87398 09.10.10
20.00
18.10.10
09.30 Wire Break.
37 87302 18.10.10
15.00
19.10.10
18.30 Cable pair changed.
38 87376 18.10.10
18.00
19.10.10
10.30 Cable pair changed.
39 87490 20.10.10
11.00
20.10.10
17.00 Wire Break.
40 87396 20.10.10
07.30
22.10.10
08.40 O/H/ Break.
41 87362 22.10.10
07.30
22.10.10
09.35 Wire Break.
42 87373 22.10.10
09.30
22.10.10
10.30 Cable pair changed.
43 87485 20.10.
10
113.
30
23.10.1
0
16.20 Wire Break.
44 87307 23.10.10
18.30
24.10.10
11.30 Wire Break.
Copy to Sr. DSTE/RNC & ADSTE/MURI for information please.SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
14/18
STATEMENT SHOWING THE POSITION OF BSNL PHONE UPTO 25TH OFTHE MONTH OF OCTOBER 2010.
SL.NO.
Name of theBSNL phone
IN RIGHT Remarks
DATE TIME DATE
TIME
01 RMT Working properly.02 MAEL Working properly.03 BRKP 24.07.1
019.30 Not Working .
04 GRE Working properly.05 HRBR 30.10.0
612.00 Very feeble signal &
disconnected due tonon payment.
06 BLNG 11.10.05
13.00 No signal at BLNGstation & disconnecteddue to non since
30.10.0607 MURI/SS Working properly.08 MURI/ENQ Working properly.091011
MURI T/ROOMMURI EXCH.IMURI EXCH.II
Working properly.Working Properly.Working Properly.
12 ADSTE/MURI Working properly.13 ILU Working properly.14 TRAN No BSNL connection.15 SSIA 16.06.1
015.00 Not Working,
16 TUL 01.04.1
0
14.00 Not Working due to
very week signal.17 LTMD Working properly.18 JHMR Working properly.19 GDBR Working properly.20 THO Nonpayment.21 JAA Working properly.
Copy to Sr. DSTE/RNC & ADSTE/MURI for information please.SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
15/18
STATEMENT SHOWING THE PERFORMANCE OF PRS/UTS FOR THEMONTH OF OCTOBER 2010.
Name of theStation
IN RIGHT REMARKS.DATE TIME DATE TIME
PRS/MURI No Failure Reported.1. NKM Link -DO-2. JAA Link -DO-
PRS/RMT No Failure Reported.1. RLY Link 09.10.
1009.30 09.10.
1017.00 RLY Link problem.
2. BSNLLink
-DO-
PRS/RWP No Failure Reported.1. BSNL
Link09.10.10
13.45 09.10.10
13.40 Link failure.
PRS/JAA No Failure Reported.
1. MURILink -DO-
2. KSX Link -DO-
PRS SSIA No Failure Reported.1. MURI
Link-DO-
2. TUL Link -DO-PRS TUL No Failure Reported.
1. MURILink
-DO-
2. SINI Link -DO-UTS/MURI 09.10.
10
04.20 09.10.
10
05.00 Modem reset.
1. NKM Link -DO-2. JAA Link -DO-
UTS/RMT No Failure Reported.
1. RLY Link -DO-2. BSNL
Link02.10.10
17.30 02.10.10
23.00 BSNL Link failure.
UTS/JAA No Failure Reported.1. MURI
Link-DO-
2. KSX Link -DO-
UTS/SSIA No failure reported.1. Muri Link 17.10.
1022.35 17.10.
1023.10 Modem reset.
2. TUL Link -DO-UTS/TUL 28.09.
1016.00 29.09.
1008.00 Link problem.
1. SSIA Link -DO-
2. SINI Link -DO-
-
7/31/2019 Pcdo Fo Achivments
16/18
UTS/BLNG No failure reported.UTS/HSNL No failure reported.UTS/TRAN Modem reset.
Copy to Sr. DSTE/RNC & ADSTE/MURI for information please.SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
17/18
STATEMENT SHOWING THE EMERGENCY SOCKETS LYING DEFECTIVETILL 25TH OF THE MONTH OF OCTOBER 2010.
SL.NO.
Name ofthesection
Totalsocket
KM.NO.
IN REMARKS
DATE TIME
01 BRKP-GRE 08 388/16 21.09.10
21.50 Socket missing.
02 JHMR-LTMD
10 304/11 11.10.10
13.45 D/Cable cut.
03 JAA-KSX 13 374/15 20.10.10
16.00 Socket damage.
04 GRE-HRBR 09 381/1 24.10.10
14.30 NO LOOP.
-DO- 09 380/1 24.10.10
14.30 NO LOOP.
Copy to Sr. DSTE/RNC & ADSTE/MURI for information please.SE/T/MURI
-
7/31/2019 Pcdo Fo Achivments
18/18
STATEMENT SHOWING THE EMERGENCY SOCKETS TESTING REPORTFOR THE MONTH OF OCTOBER 2010.
SLNo.
Section TotalNo.
Date oftesting
Number ofsocket
tested
Numberof socketsmissing /
defective
Remarks
01 CNI-GDBR 09 23.10.10
09 02 Joint tested by H.D.Singh with TRD staff.
02 GDBR-JHMR
10 23.10.10
10 00 Joint tested by N.C.Mahato with TRDstaff.
03 JHMR-LTMD
10 11.10.10
10 02 Joint tested byRaman Lohra with
TRD staff.04 TUL-SSIA 07 11.10.1
007 00 Joint tested by P.C.
Sarkar with TRDstaff.
05 SSIA-TRAN 11 12.10.10
11 01 Joint tested byH.D.Singh with TRDstaff.
06 MURI-BLNG
10 14.10.10
10 00 Tested by R. Lohra.
-DO- 10 21.10.10
10 01 Joint tested by B.D.Muchi with TRD staff.
07 HRBR-GRE 09 14.10.10
09 03 Tested by B.D.Muchi.
-do- 09 24.10.10
09 02 Joint tested by P.C.Sarkar with TRD
staff.08 MAEL-RMT 13 21.10.10
02 00 Tested by A. Mura.
Copy to Sr. DSTE/RNC & ADSTE/MURI for information please.SE/T/MURI