INSTALLATION INSTRUCTIONS V00029KP_01© Panduit Corp. 2017
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Dual Single
PEV12
PEV1296
PEVF12
PEVF1296
PED12B1
PED1296B1
PEV10
PEV1096
(Sold Separately)
PEVF10
PEVF1096
PED10B1
PED1096B1PEV8
PEV896
PEVF8
PEVF896
PED8B1
PED896B1PEV6
PEV696
PEVF6
PEVF696
PED6B1
PED696B1
[6.0]
(8.0)
*10.0*
12.0
20.31” = 19” RACK
24.31” = 23” RACK
TYP
1.25
TYP
4.75
TYP
3.00
16.00” = 19” RACK
20.00” = 23” RACK
TYP
[10.25]
(12.25)
*14.25*
16.25
10.75
TYP6.00
7.8” STD. MOUNTING
12.6” FULLY EXTENDED
10.7” FULLY EXTENDED
15.5” STD. MOUNTING
40% of
Capacity*
60% of
Capacity*
7.75
TYP
4.75
TYP 7.8” STD. MOUNTING
12.6” FULLY EXTENDED
10.7” FULLY EXTENDED
15.5” STD. MOUNTING
[24.8]
31.8
(37.8)
*43.8*
1.07
TYP
16.00”
TYP
23.2” to Inside Panel
of Manager[6.0]
(8.0)
*10.0*
12.0
[25.9]
32.9
(38.9)
*44.9*
7.8” STD. MOUNTING
12.6” FULLY EXTENDED
1.75 TYP
15.5” STD. MOUNTING
10.7” FULLY EXTENDED
40% of
Capacity*
60% of
Capacity*
(1) PATCHRUNNER High Capacity Vertical Cable Manager(6) 1/2-13 Hex Nuts (6) 1/2-13x1.0” Bolts(12) Washers for 1/2-13 bolts
PATCHRUNNER High Capacity Vertical Cable Manager
PART NUMBERS
LOCATION GUIDE: Standard and 6-inch Racks
CONTENTS
6” Vertical Manager dimension shown in brackets [...]8” Vertical Manager dimensions shown in parenthesis (...)10” Vertical Manager dimensions shown in asterisk *...*3” Standard
CEA Rack
6” Rack
For horizontal dimensions:6” Vertical Manager dimension shown in brackets [...]8” Vertical Manager dimensions shown in parenthesis (...)10” Vertical Manager dimensions shown in asterisk *...*
For vertical dimensions:23” Deep 4-Post Rack dimension shown in brackets [...]36” Deep 4-Post Rack dimensions shown in parenthesis (...)42” Deep 4-Post Rack dimensions shown in asterisk *...*
LOCATION GUIDE: 4-post Racks
*Reversible Total capacity of dual sided manager is split 60% and 40%.
Note: Single-sided managers have equivalent dimensions to the 60% capacity side of a Dual-sided manager.
*Reversible Total capacity of dual sided manager is split 60% and 40%.
Page 1 of 5
INSTALLATION INSTRUCTIONS V00029KP_01
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp Page 2 of 5
Door Bracket Base Installation
Install Door Bracket Base into cutout features on side panels using (2) #12-24 X 1/2" Screws.
Top of part
Bottom of part
#12-24 X 1/2" Screws
If material from Door Bracket Base cannot be touched or seen protruding through cutouts on inside of panel, then the Door Bracket is not properly engaged.
Note: When properly installed, Door Bracket Base will protrude through cutouts on inside of panel.
Panduit recommended mounting locations
Mounting of a PATCHRUNNER High Capacity Vertical Manager
Panduit recommends that the PATCHRUNNER High Capacity Vertical Manager be mounted such that the front face of the manager’s panels are 1.25” forward of the front face of the rack it is attached to. However, other holes on the side panel of the manager and the channels of the rack are available so that the manager may be moved forward to accommodate applications which require a larger bend radius requirement.
Other available holes for mounting
Standard Rack
6” Deep Steel Rack 4-Post Rack
Other available holes for mounting
Panduit recommended mounting locations
Door Bracket
Material visibleBrackets Engaged
Material not visibleBrackets not engaged
Door Bracket Base
INSTALLATION INSTRUCTIONS V00029KP_01
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 3 of 5
After the first rack is mounted to the floor with the appropriate hardware, Use Three 1/2-13x1.0” bolts (supplied with the vertical cable manager panels) to fasten the PATCHRUNNER High Capacity Vertical Cable Manager to the rack. Next, mount the second rack to the other side of the PATCHRUNNER High Capacity Vertical Cable Manager using the remaining 1/2-13x1.0” bolts. Then mount the second rack to the floor using the appropriate hardware.Note: Design is only intended to have PED*B1 doors to mount in front of the manager.
Mounting of a PATCHRUNNER High Capacity Vertical Manager on a 7 Ft. Tall 4-Post Rack
Bottom Mounting LocationDetail View
Mounting Locations(Near top, Near center, Near bottom)
NutWashers
Bolt
Note:Tighten bolts to 120 in-lbs.
Bottom Mounting LocationDetail View
(6” Steel Rack)
Mounting Locations(Near top, Near center,
Near bottom)
Nut Washers Bolt
After the first rack is mounted to the floor with the appropriate hardware, Use Three 1/2-13x1.0” bolts (supplied with the vertical cable manager panels) to fasten the PATCHRUNNER High Capacity Vertical Cable Manager to the rack. Next, mount the second rack to the other side of the PATCHRUNNER High Capacity Vertical Cable Manager using the remaining 1/2-13x1.0” bolts. Then mount the second rack to the floor using the appropriate hardware.
Center Mounting of a PATCHRUNNER 7Ft. Tall High Capacity Vertical Manager on Standard 7 Ft. Tall CEA Rack or 6”- 7Ft. Tall Steel Rack
Bottom Mounting LocationDetail View
(Standard CEA Rack)
Mounting Locations(Near top, Near center,
Near bottom)
Nut Washers Bolt
INSTALLATION INSTRUCTIONS V00029KP_01
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Washers
After the first 8 ft. tall rack is mounted to the floor with the appropriate hardware, Use Three 1/2-13x1.0” bolts (supplied with the vertical cable manager panels) to fasten the PATCHRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager to the rack. Next, mount the second 8 ft. tall rack to the other side of the PATCHRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager using the remaining 1/2-13x1.0” bolts. Then mount the second 8 ft. tall rack to the floor using the appropriate hardware.
Mounting of a PATCHRUNNER High Capacity Vertical Manager on a 8 Ft. Tall 4-Post Rack
Bottom Mounting LocationDetail View
Mounting Locations(Near top, Near center, Near bottom)
Nut Washers Bolt
Note:Tighten bolts to 120 in-lbs.
Bottom Mounting LocationDetail View
(6"- 8Ft Tall Steel Rack)
Mounting Locations(Near top, Near center,
Near bottom)
Nut Washers Bolt
After the first 8 ft. tall rack is mounted to the floor with the appropriate hardware, Use Three 1/2-13x1.0” bolts (supplied with the vertical cable manager panels) to fasten the PATCHRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager to the rack. Next, mount the second 8 ft. tall rack to the other side of the PATCHRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager using the remaining 1/2-13x1.0” bolts. Then mount the second 8 ft. tall rack to the floor using the appropriate hardware.
Center Mounting of a PATCHRUNNER 8 Ft. Tall High Capacity Vertical Manager on Standard 8 Ft. Tall CEA Rack or 6"- 8 Ft. Tall Steel Rack
Bottom Mounting LocationDetail View
(Standard 8 Ft. Tall CEA Rack)
Mounting Locations(Near top, Near center,
Near bottom)
Nut Bolt
Page 4 of 5
INSTALLATION INSTRUCTIONS V00029KP_01
For instuctions in Local Languagesand Technical Support:
www.panduit.com/resources/install_maintain.asp
E-mail:[email protected]
Fax:(708)444-6448www.panduit.com
Page 5 of 5
Equipment Mounting Instructions1. Mount appropriate cage nuts to cage nut holes provided in center mounting brackets. Mounting to the cage nut holes on the bottom of a center mounting bracket to the holes on the top of the center mounting bracket directly below will meet the correct mounting requirement for CEA equipment.2. Secure equipment using appropriate screws
Screws
Screws
Cage Nuts
Cage Nuts
Detail ViewCenter Mouning Bracket Multi-Layer Strain
Relief BarQuick Net Patch Panel
Note: For cleaning PANDUIT recommends using ‘SIMPLE GREEN’ all purpose cleaner (or local equivalent) and a lint free cloth
FINGER REMOVAL
Score Groove
Step 1:Starting with bottom fingers, align tabs on base of finger with keyholes on side panel of manager. The cable retainers on the finger will be pointed upward,
Finger flags
Apply outward pressure (from inside of manager) until plastic finger clicks into place.
Step 2:
Step 3:
Repeat Steps 1 and 2 on remaining fingers.
Outwardpressure
Removal/Replacement:Use a flat-head screwdriver to release snaps at locations shown and apply inward pres-sure until finger is removed.
Apply inward pressure at finger ends to remove finger.
Finger Installation
Snap locations