Transcript

B10SW

UP

B1

B1A

B10T

B10

B12

B18

B20

B10SE

UP

B25

B27

B21 B10E

B23

B23B B23A

B1EL

SHEET NO.

BLDG. TOTAL: WSU FILE NO.

NORTH

BLDG. NO.

GROSS SQUARE FEET REVISION DATES

FIL

E: \\fss0

01

\B

UIL

DIN

GS

\0

00

0 - P

ullm

an

\0

05

0\0

05

0\0

00

- R

-S

he

et\0

00

- S

pa

ce

R

-S

he

et\0

05

0_

R0

1.d

wg

PL

OT

D

AT

E: Ju

ne

0

5, 1

4 - 2

:1

9 P

M O

RIG

IN

AL

P

AP

ER

S

IZ

E: 1

1" x 1

7"

PACCAR ENVIRONMENTAL TECHNOLOGY

BUILDING

0050

0050_R01

8,007

R-1

BASEMENT

101,211 S.F.

12-09-2015

01-28-2016

-

-

-

-

0 12 24

SCALE: 1" =24'

NOTICE TO USERS

THIS REFERENCE FLOOR PLAN HAS BEEN COMPILED FROM

VARIOUS SOURCE DOCUMENTS AND METHODS. INTENDED

FOR REFERENCE ONLY, ITS ACCURACY OR COMPLETENESS

HAS NOT BEEN VERIFIED. INFORMATION IS APPROXIMATE

AND THEREFORE SHOULD BE FIELD VERIFIED AS NEEDED.

TOTAL 101,211

6,923MECH PENTHOUSE

20,979SECOND FLOOR

25,692FIRST FLOOR

8,007BASEMENT

BUILDING SQUARE FOOTAGE

19,814THIRD FLOOR

19,796FOURTH FLOOR

ROOF

LOWER

ROOF

LOWER

ROOF

DN

UP

400SW

DN

UP

40

0S

E

405

403 401

400W

407 409 411 415 417 419 423

425A

425B

425

427

400E

400N

400SS

400S

430

429

401EL

453 455

454 456 458 460452450448446444442440438436434

451

410T

41

4M

41

4W

414

400EC

408

400EL

OPEN TO

BELOW

400NW

411

DN

SHEET NO.

BLDG. TOTAL: WSU FILE NO.

NORTH

BLDG. NO.

GROSS SQUARE FEET REVISION DATES

FIL

E: \\fss0

01

\B

UIL

DIN

GS

\0

00

0 - P

ullm

an

\0

05

0\0

05

0\0

00

- R

-S

he

et\0

00

- S

pa

ce

R

-S

he

et\0

05

0_

R0

5.d

wg

PL

OT

D

AT

E: Ju

ne

0

5, 1

4 - 2

:1

9 P

M O

RIG

IN

AL

P

AP

ER

S

IZ

E: 1

1" x 1

7"

PACCAR ENVIRONMENTAL TECHNOLOGY

BUILDING

0050

0050_R05

19,796

R-5

FOURTH FLOOR

101,211 S.F.

12-09-2015

01-28-2016

-

-

-

-

0 12 24

SCALE: 1" =24'

NOTICE TO USERS

THIS REFERENCE FLOOR PLAN HAS BEEN COMPILED FROM

VARIOUS SOURCE DOCUMENTS AND METHODS. INTENDED

FOR REFERENCE ONLY, ITS ACCURACY OR COMPLETENESS

HAS NOT BEEN VERIFIED. INFORMATION IS APPROXIMATE

AND THEREFORE SHOULD BE FIELD VERIFIED AS NEEDED.

LOWER

ROOF

DN

UP

UP

UP

DN

ROOF

ROOF

ROOF

500

500SW

501EV

500SE

501EL

RAMP UP

SHEET NO.

BLDG. TOTAL: WSU FILE NO.

NORTH

BLDG. NO.

GROSS SQUARE FEET REVISION DATES

FIL

E: \\fss0

01

\B

UIL

DIN

GS

\0

00

0 - P

ullm

an

\0

05

0\0

05

0\0

00

- R

-S

he

et\0

00

- S

pa

ce

R

-S

he

et\0

05

0_

R0

6.d

wg

PL

OT

D

AT

E: Ju

ne

0

5, 1

4 - 2

:1

9 P

M O

RIG

IN

AL

P

AP

ER

S

IZ

E: 1

1" x 1

7"

PACCAR ENVIRONMENTAL TECHNOLOGY

BUILDING

50

0050_R06

6,923

R-6

MECHANICAL PENTHOUSE

101,211 S.F.

12-09-2015

-

-

-

-

-

0 12 24

SCALE: 1" =24'

NOTICE TO USERS

THIS REFERENCE FLOOR PLAN HAS BEEN COMPILED FROM

VARIOUS SOURCE DOCUMENTS AND METHODS. INTENDED

FOR REFERENCE ONLY, ITS ACCURACY OR COMPLETENESS

HAS NOT BEEN VERIFIED. INFORMATION IS APPROXIMATE

AND THEREFORE SHOULD BE FIELD VERIFIED AS NEEDED.


Top Related