![Page 1: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/1.jpg)
OVERVIEW OF SHAMS MA’AN 52.5 MWAC
SOLAR PV PLANT IN JORDAN
![Page 2: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/2.jpg)
FS ME INSTALLATIONS
![Page 3: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/3.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
3
Name Watania
Size 800kWdc Diesel Hybrid (Microgrid) PV Power Plant
FS Scope EPCM
Status
Year
Complete
2015
LEADING MIDDLE EAST PV TECHNOLOGY: 350MWDC OF EXECUTED CONTRACTS
Name Sheikh Mohammed Solar Park – Phase I
Phase II
Size 13MWac 260MWdc
FS Scope EPC, O&M Module Supply
Status
Year
Complete
2013
Complete
2017
Name Masdar City PV Plant
Size 5MWdc
FS Scope Module Supply
Status
Year
Complete
2009
Name Shams Ma’an
Size 52.5MWac
FS Scope EPC, O&M
Status
Year
Complete
2016Name SADAFCO Log. Center
Size 300kWac Diesel Hybrid
FS Scope Equipment Supply
Status
Year
Complete
2016
Regional HQ
![Page 4: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/4.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
4Field condition efficiency is an approximate normalization for energy yield performance in Dubai on tracker
LAB VS FIELD CONDITIONS
Lab Condition (STC)
First Solar CdTe Efficiency 16.5%
mc-Si Efficiency 16.5%
Cell Temp 25°C
Energy Gain 0%
15.5%
13.86%
65°C
+6% for CdTe
Field Condition (Energy Normalized)
![Page 5: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/5.jpg)
© Copyright 2013, First Solar, Inc.
![Page 6: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/6.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
6
PROJECT LOCATION
Solar Data for Shams Ma’an – Long-Term Mean
Global Horizontal Irradiance 2302 kWh/m2/yrDiffuse Irradiance 593 kWh/m2/yrWind Speed 3.38 m/sAir Temperature 17.6 ̊CRelative Humidity 44.0%
Precipitable Water 1.13 cm
The southern region representing Ma’an and Aqaba area, which has the highest solar insolation in the country and has the lowest values of diffuse irradiance. The annual average daily global irradiance is between 6-7 kWh/m2
- Source: NERC
![Page 7: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/7.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
7
Shams Ma’an 52.5 MWac tracker PV power plant
![Page 8: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/8.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
8
LOT PLAN FOR ROUND ONE: 163 MWAC / 190 MWDC
![Page 9: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/9.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
9
KEY PLAYERS
Off-taker MEMR/NEPCO
Land LessorMa’an Development Company
Project CompanyShams Ma’an Power Generation PSC
Project DeveloperKawar / First Solar / DGE / Nebras Power
Technology Provider /EPC / O&M Contractor
First Solar
Investors DGE / QEWC
![Page 10: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/10.jpg)
© Copyright 2013, First Solar, Inc.
![Page 11: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/11.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
11
SITE LAYOUT
![Page 12: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/12.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
12
SITE LAYOUT – ARRAY DETAILS
![Page 13: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/13.jpg)
© Copyright 2013, First Solar, Inc.
![Page 14: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/14.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
14
PROJECT SCHEDULE
![Page 15: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/15.jpg)
© Copyright 2013, First Solar, Inc.
![Page 16: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/16.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
16
Survey. Grading. Road Works. Storm water Channel. Fence Works. Material delivery. Structural installations for tracker systems. Module Installation. Trenching and under ground cabling works. Above ground cable works. Combiner Boxes and Tracker Controllers installations. Instrumentations. PCS installations. PVCS installation including Capacitor Bank and Statcom. Operation and Maintenance building work. Testing, Commissioning and performance testing Final handover to client.
Project Construction Phases
![Page 17: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/17.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
17
Original Site Condition
![Page 18: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/18.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
18
Site Preparation
![Page 19: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/19.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
19
Storm Water Channel Works
![Page 20: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/20.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
20
Post Ramming
![Page 21: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/21.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
21
Bearing installations: (4 bearing for a single table tracker)
![Page 22: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/22.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
22
Torque tubes and actuator assembly
![Page 23: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/23.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
23
PV Modules
![Page 24: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/24.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
24
PCSs Installations (34nos.)
The Power Conversion Stations convert DC voltage to LV AC voltage by inverters and LV AC voltage will be raised up to 33kV by transformer and looped with other PCSs by Ring Main Units
![Page 25: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/25.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
25
SCADA Screen Shot shows the plant output
![Page 26: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/26.jpg)
SOILING AND CLEANING
![Page 27: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/27.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
27
SOILING MONITORING STATION
Two Reference Modules:
VUWUn‐Washed
Washed
I
V
ISC
VOC
VW
AUW
AW
Daily Soiling Level
Dat
a Fi
lterin
g
Washed
Un‐washed
Un‐washedWashed
MET00
IVB13IVB02
Short‐circuited Modules:
RS
RS
÷ RS
÷ RS
![Page 28: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/28.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
28
LOCATION OF SOILING STATIONS
![Page 29: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/29.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
29
• FS modules are frameless and maintain less soiling comparatively with the framed modules.• Since the Ma’an area is a low-cost labor market with a low water availability, cleaning with
Manual Dry Brush Trolley (MDBT) is more appropriate.
MODULE DRY CLEANING
![Page 30: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/30.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
30
SOILING SHAMS MAAN
![Page 31: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/31.jpg)
REAL LIFE PLANT PERFORMANCE
![Page 32: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/32.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
32
OVERALL PLANT PERFORMANCE
Average Performance Ratio: 80.86%Average Effective Availability 99.59%Average Energy over performance: 2.60%
![Page 33: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/33.jpg)
LESSONS LEARNED
![Page 34: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/34.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
34
• First Solar participated in providing and supporting local communities with jobs to increase employment
• First Solar Participating in CSR activities in Ma’an area along with Client SMPG
Local Karate Club sponsorship Local orphanage Center Outdoor Park and Playground Area Hiring Technician from local community College
CSR IS VERY CRUCIAL FOR LOCAL COMMUNITY
![Page 35: OVERVIEW OF SHAMS MA’AN 52.5 MWAC SOLAR PV PLANT IN … · 2018. 8. 28. · (Microgrid) PV Power Plant FS Scope EPCM Status Year Complete 2015 LEADING MIDDLE EAST PV TECHNOLOGY:](https://reader031.vdocuments.site/reader031/viewer/2022012008/61249f18afb7d75aaa4e636f/html5/thumbnails/35.jpg)
© C
opyr
igh
t Fi
rst
Sol
ar,
Inc.
S
epte
mb
er 2
01
7
35
APPROVAL OF GRID IMPACT STUDIES
• Conservative approach by NEPCO on grid code compliance
• Emphasis on statcoms though not needed
• Plant included 68 inverters, Post, Tracking system, Torque Tubes,Bearings, Combiner Boxes, Transformers, Substation equipment,Capacitor Banks and STATCOM
• The Plant is connected to 33/132 kV NEPCO substation through 3nos. of 33kV feeders