Port Authority -Development EngineeringPre-Contr
Item Project Description ' (bjective )asks
1 208 *+ Remove old unused condensing unit
.+ Install ne/ condensing to serve second floor
2 129
Rehabilitation of a!i"ational Aid# in the $in"#ton %arbour Pro&ure'ent of (arine )e&* +ar"e
Pro&ure'ent of teel Pile
n!ite tender# for &on#tru&tion and repair of bea&on #t
/on#tru&tion and Repair
3 26 3C) - 4round Improvement at Reclamation *rea R! Placement of e5isting fill 6P7ase I+
Placement of imported fill 6P7ase II+
0onitoring
Project8
P* 9: *ir-conditioning ;pgrade - 4round and Second
-
7/25/2019 Overall Pre-contract Report 2008-6-13
2/13
Port Authority -Development EngineeringPre-Contra
Item Project Description ' (bjective )asksProject8
3C) - 4round Improvement at Reclamation *rea R! cont?d Drains and Surc7arge 6P7ase III+
28 Customs *ccommodation at 3C) .ert7 !! Ware7ouse Wall and
-
7/25/2019 Overall Pre-contract Report 2008-6-13
3/13
Port Authority -Development EngineeringPre-Contract
Item Project Description ' (bjective )asksProject8
Customs *ccommodation at 3C) .ert7 !! Ware7ouse *P0)'
-
7/25/2019 Overall Pre-contract Report 2008-6-13
4/13
Port Authority -Development EngineeringPre-Con
Item Project Description ' (bjective )asksProject8
8 0.
-
7/25/2019 Overall Pre-contract Report 2008-6-13
5/13
Port Authority -Development EngineeringPre-C
Item Project Description ' (bjective )asksProject8
13 *+ Design of t7e structure
+Preparation of +ill of Guantitie#
1 0ontego .ay and ;se - 2EW S;.DI@ISI(2 Design
Construction
1 *+
-
7/25/2019 Overall Pre-contract Report 2008-6-13
6/13
Port Authority -Development EngineeringPre-Contract
PRBJ
PR-/BRA
PRBJ
-
7/25/2019 Overall Pre-contract Report 2008-6-13
7/13
Port Authority -Development EngineeringPre-Contract W
C
PRBJ/
PRBJ/
PRBJ/
PRBJ/
PRBJ/
PRBJ/
PRBJ/
-
7/25/2019 Overall Pre-contract Report 2008-6-13
8/13
Port Authority -Development EngineeringPre-Contract Wee
fo
Comm
PRBJ/
PRBJ/
PRBJ/
o /h
U ha# &o''en&ed o&&upan&y of the4uip'ent by he (in#try of %ealth pe#ub#tantially &o'plete ith telephone/onne&tion of the re#t roo'# re'ain alon" ith or*# for the pha#e /u#to'
-
7/25/2019 Overall Pre-contract Report 2008-6-13
9/13
Port Authority -Development EngineeringPre-Contrac
PRBJ
-
7/25/2019 Overall Pre-contract Report 2008-6-13
10/13
Port Authority -Development EngineeringPre-Contract
PR-/BRA
P%A
-
7/25/2019 Overall Pre-contract Report 2008-6-13
11/13
Item )asks
1 *+.+
C+ 1-)e&-06
2
31-(ay-0
6
811-Au"-06
911-Au"-06
1011-Au"-06
11
Project8
ProjectDescrip
tion '(bjecti
ve
)asksSc7edu
ledComple
tionDate6s+
(riginalProject
CompletionDate
RevisedProject
Completion Date
3C) -(ldStoresRenovat3C) -StraddleCarrier
Works73C) -E5it4ate3C) -Entrance 4ate(ldRail/ay.uildingPort*ntonio0arina -Port*ntonio
0arinaPort*ntonio0arina(c7oRios )-Pier
-
7/25/2019 Overall Pre-contract Report 2008-6-13
12/13
ender &an&elled due to the preli'inary e#ti'ated &o#t a# far in e5&e## of the bud"et
-
7/25/2019 Overall Pre-contract Report 2008-6-13
13/13
Comments