OSHA Cranes & Derrick OSHA Cranes & Derrick ReviewReview
Subpart CCSubpart CCJohn FrowdJohn FrowdCompliance Assistance SpecialistCompliance Assistance SpecialistUnited States Dept. of Labor-OSHAUnited States Dept. of Labor-OSHAManhattan Area OfficeManhattan Area Office(212)337-2008(212)[email protected]@dol.gov
ASSE Meeting
![Page 3: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/3.jpg)
Learning ObjectivesLearning Objectives
• Review highlights of the new crane and derricks Review highlights of the new crane and derricks standardstandard
• Identify crane operator qualification and Identify crane operator qualification and certification requirements certification requirements
• Identify types and frequency of inspections for Identify types and frequency of inspections for overhead cranesoverhead cranes
• Identify supplemental requirements for tower Identify supplemental requirements for tower cranescranes
3
![Page 4: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/4.jpg)
Topics to be Covered
• New Standard• Scope• Ground Conditions• Assembly/Disassembly• Power Line Safety• Inspections• Rigging • Signals• Operator Qualification/Certification• Tower Cranes (supplemental requirements)
4
![Page 5: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/5.jpg)
Cranes and Derricks
5
Effective Date - November 8,
2010
![Page 6: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/6.jpg)
Important Dates
• Released – July 28, 2010• Published – August 9, 2010• Effective – November 8, 2010
– Qualification of riggers
• Phased in over four years – August 9, 2014– Certification of operators phased in over four
years (except for State and local licensing)
6
![Page 7: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/7.jpg)
Highlights
• Scope• Definitions• Ground Conditions• Assembly/Disassembly• Power Line Safety• Inspections• Wire Rope• Safety Devices• Operational Aids• Operation• Authority To Stop• Signals• Fall Protection• Work Area Control• Keeping Clear Of The Load• Free Fall/ Controlled Load Lowering• Operator Qualification and
Certification
7
• Signal Person Qualifications• Qualifications of Maintenance and Repair
Workers• Training
• Hoisting Personnel• Multiple Crane/Derrick Lifts
• Design, Construction and Testing• Equipment Modification
• Tower Cranes• Derricks
• Floating Cranes & Land Cranes on Barges• Overhead and Gantry Cranes
• Dedicated Pile Drivers• Sideboom Cranes
• Requirements for Equipment w/ Capacity of 2000 lbs and Less
![Page 8: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/8.jpg)
Subpart CC is Substantial
• 1075 pages (with preamble)
• 275,633 words
• 1,517,395 characters
• 14,478 paragraphs
• 36,405 lines
8
![Page 9: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/9.jpg)
What is Covered?
• Functional Description– Can hoist – Lower – Horizontally move a
suspended load
• Long List of Examples
9
![Page 10: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/10.jpg)
Scope
Specific ExclusionsBackhoes and forklifts
Limited Requirements for:Capacity: 2000 pounds or lessDedicated pile driversOverhead and gantry cranesSide-boom tractors
Supplemental Requirements for:Tower cranesDerricksFloating cranes & land cranes
on barges10
![Page 11: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/11.jpg)
Ground Conditions
11
![Page 12: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/12.jpg)
Ground Conditions
• Controlling Employer To Inform User and Equipment Operator of Known Underground Hazards (voids, utilities, etc.)
12
![Page 13: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/13.jpg)
Assembly/Disassembly
13
![Page 14: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/14.jpg)
Assembly/Disassembly
• Two Options:– Manufacturer
procedures or – Employer procedures
(criteria requirements)
14
![Page 15: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/15.jpg)
Assembly/Disassembly
• Assembly/Disassembly Supervisor – Must be a competent and qualified person
• Assembly/Disassembly Supervisor Must Understand Procedures and:– Review procedures (unless they’ve used them before) – Check that crew members understand their tasks and
hazards– Follow manufacturer’s prohibitions– All rigging work is by a Qualified Rigger– When using outriggers, fully extended or deployed per the load chart
15
![Page 16: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/16.jpg)
Power Lines
16
![Page 17: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/17.jpg)
17
Could you get within 20 feet of a
power line?YES NO
Option #1 Deenergize & Ground Encroachment
Prevention Measures
Option #3Ask Utility for Voltage
and Use Table A
(with minimum
clearance distance)
Option #220-foot
Clearance
No Further Action
• Planning Meeting• If Tag Lines are Used, They Must be Nonconductive• Elevated Warning Lines, Barricades, or Line of Signs
PLUS (Choose One):
• Proximity Alarm, Spotter, Warning Device, Range Limiter, or Insulating Link
![Page 18: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/18.jpg)
Operator Qualification/Certification
18
![Page 19: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/19.jpg)
Operator Qualification and Certification - 4 Options
OPTION 1OPTION 1: Accredited Testing OrganizationOPTION 2OPTION 2:
Employer Qualification ProgramOPTION 3OPTION 3:
U.S. MilitaryOPTION 4OPTION 4:
State/Local Government License
19
![Page 20: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/20.jpg)
Operator Qualification and Certification (cont’d)
20
• OPTION 1: Accredited
Testing Organization
• OPTION 2: Employer Qualification Program
• OPTION 3: U.S. Military
• OPTION 4: State/Local Gov License
• Knowledge (Written Test):– Controls/performance
characteristics– Calculate capacity (with or
without calculator)– Preventing power line
contact– Ground support– Read and locate info in
operating manual– Appendix C subjects
• Practical Test
TestingTesting Criteria Criteria
![Page 21: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/21.jpg)
Signaling
21
![Page 22: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/22.jpg)
Signals
• Signal Person - When Required:
– Point of operation not in full view of operator
– View of direction of travel is obstructed
– Site specific safety concerns
• Signal Types:
– Hand, voice, audible or “new”
– Only time an operator can use a cell phone while lifting
22
![Page 23: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/23.jpg)
Signals (cont’d)
• Signal Person Qualifications
3rd Party Qualified Evaluator
Yes Yes
Employer Qualified Evaluator
Yes No
23
Qualified How Documentation Portable
![Page 24: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/24.jpg)
Inspections
Modified or Repaired/ Adjusted
Qualified
Post-assembly Qualified
Shift Competent
Monthly Competent
Annual Qualified
24
Type of Inspection:Type of Inspection: Who Inspects: Who Inspects:
![Page 25: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/25.jpg)
Inspections
• Shift = Visual Inspection for Apparent Deficiencies
• Monthly = Documented Shift Inspection
• Annual = Comprehensive, Every 12 Months
25
![Page 26: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/26.jpg)
Fall Protection
• Part CC has its Own Fall Protection Requirements
• Training Requirement Ties Back to Subpart M
• Subpart M Reference to Anchor Points
26
![Page 27: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/27.jpg)
Wire Rope Inspections
• Daily – No Documentation
• Monthly – Documented
• Annual – Documented
• Category I, II or III Deficiencies
27
![Page 28: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/28.jpg)
Tower Cranes
28
![Page 29: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/29.jpg)
Highlights of SHighlights of Supplementalupplemental Tower Crane RequirementsTower Crane Requirements
Foundations & Structural SupportsDesign & inspection
Plumb ToleranceSpecification & verification
Climbing ProceduresHost structure strength verificationWind
Post-erection Load TestMonthly Inspection: Tower mast bolts, upper-most tie-in,
braces, floor supports, floor wedges
29
![Page 30: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/30.jpg)
Required Documentation
• Monthly and Annual Inspection Reports for:– Cranes– Wire rope– Signal person training– Tower crane foundation/support design
30
![Page 31: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/31.jpg)
Summary
Ground ConditionsGround ConditionsAssembly/DisassemblyAssembly/DisassemblyPower Line SafetyPower Line SafetyInspectionsInspectionsRiggingRiggingSignalingSignalingOperator Qualification/CertificationOperator Qualification/CertificationTower Cranes (Supplemental Requirements)Tower Cranes (Supplemental Requirements)
31
![Page 32: OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008](https://reader036.vdocuments.site/reader036/viewer/2022062517/56649ed35503460f94be2bcf/html5/thumbnails/32.jpg)
ResourcesResources
Cranes and Derricks in Construction Final Rulehttp://www.osha.gov/cranes-derricks/index.html
Associated Training Service Networkhttp://www.operator-school.com/
National Commission for the Certification of Crane Operatorshttp://www.nccco.org/
National Association of Heavy Equipment Training Schoolshttp://www.heavy-equipment-school.com/
North American Crane Bureau Grouphttp://www.cranesafe.com/history.htm
California Crane Schoolhttp://www.californiacraneschool.com/
32