![Page 1: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/1.jpg)
Office of OperationsOffice of Operations
2010 Fall Conference2010 Fall Conference
Contract MonitoringContract Monitoring
Elizabeth BogdanowiczJoseph Morrissey, MBA, CGAP
Roslyn Watrobski, CFE, CIA, CGAP
![Page 2: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/2.jpg)
AgendaAgenda
Monitoring Discussion
Six Step Monitoring Process
Case Study
![Page 3: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/3.jpg)
Why Monitoring is NecessaryWhy Monitoring is Necessary Program missions Millions in State spending Risks
Health & safety Goal achievement Dollars Reputation
Fraud Errors
![Page 4: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/4.jpg)
MonitoringMonitoring
Ongoing activities, special evaluations or a combination of both used to ensure that controls are operating as intended.
![Page 5: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/5.jpg)
Benefits of MonitoringBenefits of MonitoringReduces risk of fraud, waste and
abuse
Increases employees’ knowledgeSets payee’s expectations
Get what was intended
Provides basis for payment
![Page 6: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/6.jpg)
Who Should Monitor?Who Should Monitor?Program staff Fiscal staff in procurement,
payment, etc.
Independent monitors and consultants
Internal auditorsExternal auditors
![Page 7: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/7.jpg)
When to MonitorWhen to MonitorTiming
Beginning?End?During?
ExtentHow much monitoring should you
do?
![Page 8: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/8.jpg)
Monitoring ChallengesMonitoring Challenges
![Page 9: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/9.jpg)
Things that Help or HinderThings that Help or Hinder
Management support
Vendor relationships
Differing priorities
Vendor, program and audit
![Page 10: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/10.jpg)
Things that Help or HinderThings that Help or HinderResources
Data
Tools
Staffing
![Page 11: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/11.jpg)
Things that Help or HinderThings that Help or Hinder
Knowledge, skills and abilitiesEmbraces role as monitorUnderstands contract termsAdept at conflict managementExercises professional skepticismObtains useful information
![Page 12: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/12.jpg)
Things that Help or HinderThings that Help or Hinder
Contract Terms
![Page 13: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/13.jpg)
Contract TermsContract Terms
SMARTSpecificMeasurableAchievableRelevantTime-bound
![Page 14: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/14.jpg)
Contract TermsContract TermsClear, Detailed and Easily
Understood
Deliverables
Description
Benchmarks
Location
![Page 15: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/15.jpg)
Contract TermsContract TermsPerformance measures
Quantities
Timing
ExpertiseLicensesDegreesTest results
![Page 16: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/16.jpg)
Contract TermsContract TermsPayment provisions
Payment triggers
Invoice formats
Description of deliverable
Services
Time and attendance records Installation dates
![Page 17: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/17.jpg)
Contract TermsContract TermsReporting
Requirements
WhatElectronic/paper
When
Records retention
![Page 18: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/18.jpg)
Contract TermsContract Terms
Right to audit
Specific monitoring in contract language
Penalties for non-compliance
![Page 19: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/19.jpg)
Monitoring ProcessMonitoring ProcessSix-step Process:
1. Identify contracts to monitor
2. Understand contract requirements
3. Identify risks
4. Prioritize risks
5. Design monitoring activities
6. Follow up
![Page 20: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/20.jpg)
Step 1. Identify ContractsStep 1. Identify Contracts
What data do you have available?
What data do your sister agencies have available?
What data does OSC have available?
How can it help you identify risky contracts?
![Page 21: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/21.jpg)
RisksRisks
Health and Safety
Goal Achievement
Dollars
Reputation
![Page 22: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/22.jpg)
Risks – Data AnalysisRisks – Data Analysis
# Contracts with same payee
$ Contracts with same payee
% $ v time expended
Start date (old) Start date (new)
High $ contract Low $ contract Location Contract
description Contract
category code
![Page 23: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/23.jpg)
Step 2. Understand RequirementsStep 2. Understand Requirements
Contract termsPurchase order details Laws, rules and regulationsGuidelines Intuition?Conversation?
![Page 24: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/24.jpg)
Understand RequirementsUnderstand Requirements
Ask this:
Would I know how to verify whether something has occurred based on how the contract term is written?
![Page 25: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/25.jpg)
ExampleExample
The vendor shall submit a properly executed application for payment, together with appropriate backup supporting the amount billed.
![Page 26: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/26.jpg)
Better ExampleBetter Example
The vendor shall submit an electronic invoice for payment each month, detailing the names, titles, hourly rates, and hours worked for each consultant working during the previous month. The vendor shall also attach certified payroll records relating to the services on each invoice.
![Page 27: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/27.jpg)
Understand RequirementsUnderstand Requirements
Programmatic
Fiscal
![Page 28: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/28.jpg)
Programmatic RequirementProgrammatic Requirement
Contract Term
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
![Page 29: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/29.jpg)
Fiscal RequirementFiscal Requirement
Contract Term
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
![Page 30: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/30.jpg)
Step 3. Identify RisksStep 3. Identify Risks
Programmatic
What can prevent goal accomplishment?
Fiscal
How can the payee get money they didn’t earn?
![Page 31: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/31.jpg)
Identify RisksIdentify Risks
![Page 32: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/32.jpg)
![Page 33: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/33.jpg)
Some Key WordsSome Key Words
BribeConspiracy to
defraud Fraud FraudulentEmbezzle
False instrument
KickbackVendor namesProgram
names
![Page 34: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/34.jpg)
Programmatic MonitoringProgrammatic Monitoring
Contract TermWhat can go wrong programmatically?
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
![Page 35: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/35.jpg)
Programmatic MonitoringProgrammatic Monitoring
Contract TermWhat can go wrong programmatically?
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not perform tests according to NFPA 72.
![Page 36: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/36.jpg)
Fiscal MonitoringFiscal Monitoring
Contract TermWhat can go wrong fiscally?
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
![Page 37: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/37.jpg)
Fiscal MonitoringFiscal Monitoring
Contract TermWhat can go wrong fiscally?
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not use at least 2 service technicians per test, but could charge for 2 or more.
![Page 38: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/38.jpg)
Step 4. Prioritize RisksStep 4. Prioritize Risks
IIArea of
Minimal Concern
IIIArea of
Moderate Concern
IVArea of
Most Concern
IArea of
Least Concern
HIGH
LOW
Impact
Lik
elihood
LOW HIGH
![Page 39: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/39.jpg)
Prioritize RisksPrioritize Risks
Avoid the risk
Accept the risk
Manage the risk
![Page 40: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/40.jpg)
Step 5. Design MonitoringStep 5. Design Monitoring Activities Activities
Describe the activity
Who’s going to do it?
How are they going to document it?
What are they going to do with the documentation?
![Page 41: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/41.jpg)
How will they do it?How will they do it?ObservationAnalysis Independent / outside oversightSurprise visitAudit of vendor recordsComparison to industry
standards
![Page 42: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/42.jpg)
Programmatic MonitoringProgrammatic Monitoring
Contract TermWhat can go wrong programmatically?
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not perform tests according to NFPA 72.
![Page 43: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/43.jpg)
Programmatic MonitoringProgrammatic Monitoring
Contract TermWhat can go wrong programmatically?
How agency can monitor
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not perform tests according to NFPA 72.
![Page 44: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/44.jpg)
Programmatic MonitoringProgrammatic Monitoring
Contract TermWhat can go wrong programmatically?
How agency can monitor
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not perform tests according to NFPA 72.
At the contract start date, the Director of Facilities Planning will compare technicians’ documentation to the NFPA 72 requirements. If the technicians documentation does not conform with NFPA 72, require Vendor to correct documentation, or provide a compliant form for technicians to use.
![Page 45: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/45.jpg)
Programmatic MonitoringProgrammatic Monitoring
Contract TermWhat can go wrong programmatically?
How agency can monitor
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not perform tests according to NFPA 72.
Require technicians to forward test results to the Director of Facilities Planning at the end of each test. Review for compliance with NFPA 72 standards. If not in compliance, contact Vendor to resolve.
![Page 46: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/46.jpg)
Fiscal MonitoringFiscal Monitoring
Contract TermWhat can go wrong fiscally?
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not use at least 2 service technicians per test, but could charge for 2 or more.
![Page 47: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/47.jpg)
Fiscal MonitoringFiscal Monitoring
Contract TermWhat can go wrong fiscally?
How agency can monitor
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not use at least 2 service technicians per test, but could charge for 2 or more.
![Page 48: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/48.jpg)
Fiscal MonitoringFiscal Monitoring
Contract TermWhat can go wrong fiscally?
How agency can monitor
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not use at least 2 service technicians per test, but could charge for 2 or more.
Require technicians to sign in and sign out with Director of Facilities Planning on each day the technicians test fire alarm control panels and peripheral devises. Send sign-in sheets to Accounts Payable.
![Page 49: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/49.jpg)
Fiscal MonitoringFiscal Monitoring
Contract TermWhat can go wrong fiscally?
How agency can monitor
For every test, at least 2 service technicians will test all fire alarm control panels and peripheral devices according to NFPA 72. Vendor shall complete and submit all documentation and records.
Vendor may not use at least 2 service technicians per test, but could charge for 2 or more.
At least twice a month, a staff person from Facilities Planning shall observe and count the technicians who are performing the testing. This staff person shall report the count to Accounts Payable.
![Page 50: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/50.jpg)
Step 6. Follow Up on ProblemsStep 6. Follow Up on Problems
Corrective action
Withhold payment
Terminate contract
Other?
![Page 51: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/51.jpg)
How do you monitor?How do you monitor?
Participant discussion
Best Practices
![Page 52: Office of Operations 2010 Fall Conference Contract Monitoring Elizabeth Bogdanowicz Joseph Morrissey, MBA, CGAP Roslyn Watrobski, CFE, CIA, CGAP](https://reader038.vdocuments.site/reader038/viewer/2022103022/56649cdf5503460f949a88a1/html5/thumbnails/52.jpg)
Contact InformationContact Information
Elizabeth Bogdanowicz [email protected], 518-486-3019
Joseph Morrissey, MBA, [email protected], 518-474-3025
Roslyn Watrobski, CFE, CIA, [email protected], 518-402-4228