Observations using cmpldw
WECC MVWG Meeting
June 2015
Eric Bakie
![Page 2: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/2.jpg)
2
Agenda
• Observations using cmpldw in seasonal studies
• Review of fault event data as compared to simulation data using motorw and cmpldw load representation
![Page 3: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/3.jpg)
3
Observations
• Idaho Power is observing significant load tripping in seasonal studies that include cmpldw representation
– 2015 Light Summer 50 MW (3-PH Fault at MPSN)
13 MW (SLG Fault at MPSN)
– 2015 Heavy Summer 286 MW (3-PH Faults at HMWY)
13 MW (SLG Faults at HMWY)
– 2015 Heavy Summer 195 MW (3-PH Faults at OBPR)
146 MW (3-PH Faults at ONTO)
3 MW (SLG Faults at OBPR)
• cmpldw motor trip pickup level and time delay model parameters appear to be very sensitive and may be too conservative
![Page 4: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/4.jpg)
4
Event #1
ABC Fault - Trip
Hemingway-Summer Lake 500kV (Trip)Midpoint-Hemingway 500kV (Trip)
Fault Location 110mi from Hemingway 500kV toward Burns 500kV on
Hemingway - Summer Lake 500kV Line
![Page 5: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/5.jpg)
5
3-Phase Fault – Trip 110mi from Hemingway 500kV toward Burns 500kV(HMWY-SMLK 500kV)
3PO
M4P
-2500
0
2500
-250
0
250
0
1000
2000
3000
0.0 2.5 5.0 7.5 10.0 12.5 15.0
IA(A
) IB
(A)
IC(A
)V
A(
kV
) V
B(
kV
) V
C(
kV
)I1
Ma
gD
igit
als
Cycles
IA(A) IB(A) IC(A) VA(kV) VB(kV) VC(kV) I1Mag
![Page 6: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/6.jpg)
6
Hemingway 500kV BusPhase and Sequence Voltages
![Page 7: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/7.jpg)
7
Event #1 Area Load and ID-NW Flow
Fault LocationPld shed cmpldw
110mi from Hemingway 500kV 15.6 MW
• Event #1 PI data does not clearly indicate 15MW of load was tripped
• Fault is fairly remote from load
![Page 8: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/8.jpg)
8
Voltage Recovery at HMWY
![Page 9: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/9.jpg)
9
Event #2
Close – ABC Fault - Trip
Ontario – Caldwell 230 kV (C-T)
Fault Location 9.83mi from Ontario 230kV toward Caldwell 230 on
Ontario – Caldwell 230kV Line
![Page 10: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/10.jpg)
10
Close-into 3-PH Fault-Trip9.83 mi from Ontario 230kV(ONTO-CDWL 230kV Line)
![Page 11: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/11.jpg)
11
Area Load Change (Event #2)
Fault Location Pld shed cmpldw
9.8 mi from Ontario 230kV onOntario – Caldwell 230kV Line 25.0 MW
• Event #2 PI data does not clearly indicate load was tripped
• Fault is close to load
![Page 12: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/12.jpg)
12
Voltage Recovery at ONTO 230kV Buscmpldw with tripping enabled
![Page 13: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/13.jpg)
13
Voltage Recovery at ONTO 230kV Buscmpldw with tripping blocked
![Page 14: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/14.jpg)
14
Conclusions
• Event #1 is too remote from load to make an accurate determination if load loss occurred
• Event #2 does not provide clear indication that load was tripped during fault
• cmpldw motor trip pickup level and time delay are likely too sensitive
• blocking tripping of cmpldw using 15hs4 records provided best match
![Page 15: Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie](https://reader036.vdocuments.site/reader036/viewer/2022062314/56649eca5503460f94bd8009/html5/thumbnails/15.jpg)
15
Questions
Eric Bakie, P.E.SYSTEM PLANNING ENGINEERIdaho Power | System Planning (208) 388-5677 [email protected]