Download - Objective 2015
-
7/24/2019 Objective 2015
1/3
Support the proposal department in preparing the technical proposals for upcoming projects
including construction schedule, method statements, water handling schemes, camp
facilities, mobilization schedule, RFQ's and design brief of various projects such as Koto H,
Karora H, !abori H, "asu H, #rimmu $arrage,anjnad $arrage, %awi H, &aitltan,
aulong "am, Kurram #angi "am and !aggran (( H etc)
Support the (nfrastructure $usiness *rea in meeting technical re+uirements such as
hdraulic, structural, architectural, electrical and mechanical design for various running
projects such as Khan-i $arrage rojet, !innah $arrage roject, Ranolia H, Rasul H and
Satpara "am)
Support the "escon campus committee in preparing proposals for the improvement of
"escon Head Quarters)
-
7/24/2019 Objective 2015
2/3
".%/*K/"01S 2(3
45 65/!un/78
85 65/!un/78
10
".%/*K/
"01S 2(3
-
7/24/2019 Objective 2015
3/3