Transcript
Page 1: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

Midwest Environmental Compliance Conference

Chicago, IL – October 30, 2015

10 Tips for Implementing an Effective Audit Program

Page 2: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

Principal, Manager of

Tellevate’s Compliance

Services

– Certified environmental and management systems auditor

– Previous experience as a Regulatory Environmental Engineer

– B.S. Manufacturing Engineering, Boston University

Areas of expertise:

• Environmental compliance program support

• Air quality compliance

• Multi-media compliance auditing

• Management systems

• Agency consultation and litigation support

10/30/2015 For the MECC – Chicago 2

Nick Steinke, P.E., CPEA, SFP

Page 3: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 3

1. Obtain Management Support for Established Project Objectives

Implementing an Effective Audit Program

• Management Support is Key

• Use Management Priorities to Establish Program Objectives

• Program Objective Considerations

• Compliance

• Continual Improvement

• Technical Assistance and Training

Page 4: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 4

2. Define the Audit Scope and Protocol

Implementing an Effective Audit Program

• Regulatory Scope

• Permits, Plans

• EMS?

• Protocol

• Content: Questions? Checklists? Lists?

• Citations/References

• Updates

Page 5: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 5

3. Include Root Cause Analysis and Other Key Metrics

Implementing an Effective Audit Program

• Root Cause Analysis

• Map to EMS -> Business Processes

• Prioritize Findings

• Emergency | Regulatory | Policy | BMP

• Environmental Media Area

• Location (Facility? Building? Room?)

• Responsible Organization/Program Area

Page 6: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 6

4. Consider Technical Assistance and Training

Implementing an Effective Audit Program

• Plant Participation and Buy-In

• Corrective and Preventive Action Timeframe

• Cost-Effective

• Promotes Open Communication

• Supports Root Cause Analysis

• Overall Program Success

Page 7: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 7

5. Leverage Technology

Implementing an Effective Audit Program

• Data Collection

• Reporting

• Analysis

• Framework for Consistency

• Protocol Integration, Updates, Customization

• Communication

• Within the Organization

• With Management

Page 8: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 8

6. Establish Formal Reporting Process and Timeframe

Implementing an Effective Audit Program

• Report Content

• Clear

• Concise

• Objective

• Clearly Distinguish Findings and Recommendations

• Timeframe, Corrective Action and Liability

Page 9: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 9

7. Establish Formal Corrective Action Process

Implementing an Effective Audit Program

• Audit Findings -> Report -> Now What?

• Timeframe

• Liability of Long/Undefined Internal Process

• Roles and Responsibilities

• Corrective and Preventive Action (Address the Root Cause)

Page 10: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 10

8. Use Qualified Auditors

Implementing an Effective Audit Program

• Credibility

• Audit Quality

• Technical Assistance

• External Auditors

• Benchmarking

• Overcome Institutional Norms, Constraints

• Stakeholder Perception

• Community and Regulator Perception

Page 11: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 11

9. Use Risk-Based Approach

Implementing an Effective Audit Program

• Resource Considerations v. Considerable Audit Protocol

• Focus Auditor Resources on Issues with Greatest Risk

• Environmental Impact and Regulatory Liability – What Else?

• EMS Alignment Keeps Process Consistent with Organization Goals

Page 12: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

10/30/2015 For the MECC – Chicago 12

10. Document Formal Audit Program

Implementing an Effective Audit Program

• Clearly Define and Communicate Program Objectives and Approach

• Establish Accountability

• Define Roles and Responsibilities

• Audit Program Manual/Procedures

Page 13: Nick Steinke, Tellevate, 10 Tips for Implementing an Effective Audit Program, Midwest Environmental Compliance Conference, Chicago, October 29-30, 2015

QUESTIONS? Nick Steinke

402.730.1660

[email protected]

9/15/2015 For the Baltimore AR Fall National Meeting 13


Top Related