Download - Mz Documents
-
8/8/2019 Mz Documents.
1/291
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Ph: +914027860557, Cell: +919491037548.Email:[email protected], [email protected], [email protected].
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
Our Vision is to become to become world largest consulting firm, by employing the latesttechnologies, advanced products, optimized design, better processes and exercising environmentalresponsibilities.Our Mission is to maintain market leadership through continuous growth and acquisition. We docontinuous R&D and innovation to reduce cost and improve the quality of the products. We docomplete backward and forward integration. We maintain international standards of quality.
Quality : We, at MZ Consultants are committed to comply all the statutory and regulatoryrequirements related to products, environment and safety and to achieve total customer satisfaction.1. By providing products of Quality at Competitive Prices on time.2. By reducing waste and prevent pollution through effective conservation of resources in all
activities by continually improving the effectiveness of Quality and Environmental ManagementSystem.
3. By providing safe working environment for employees and contributing to society by promotingsafe and eco friendly products
4. By Encouraging new ideas and efforts from all levels for continual improvement.
-
8/8/2019 Mz Documents.
2/292
MZ Consultants.Shop number 1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony,
Yapral, Secunderabad 500087, AP,India.Ph: +914027860557, Cell: +919491037548.
Email:[email protected], [email protected], [email protected]
website www.mzconsultants.com, Reg. No.ALO19/HYD/49/2010.
TO,THE CHAIRMAN AND MANAGING DIRECTOR,DEAR SIR,PLEASE FIND BELOW CONSULTING WORK OFFERED BY MZ CONSULTANTS:1. MZ HOTELZ.2. MZ HOUZING.3. MZ TRAINZ.4. MZ ENERGY.5. MZ BANKZ.
6. MZ AIRLINEZ.7. MZ CARZ.8. MZ COMMUNICATIONZ - MZ CELLZ + MZ BROAD BAND.9. MZ CRUIZE.10. MZ MOVIEZ.11. MZ FASHON.12. MZ ENTERTAINMENT.13. MZ GOLFING SCHOOL.14. MZ ZIP ZAP ZOOM.15. MZ ZUBE ZUBE ZUBE ZOOO.16. MZ ZOOO.
17. MZ MBA.18. MZ SCHOOL.19. MZ AUTOMATIC WATER MANAGEMENT SYSTEM.20. MZ ALTERNATE FUEL SYSTEMZ FOR CARZ AND GAS GENERATORZ.
21. MZ COMPUTER HARDWARE AND PERIPHERALZ SALEZ, SERVICING AND REPAIRZ.
22. MZ RECYCLING AND WASTE MANAGEMENT SYSTEMZ.
23. MZ AIR CONDITIONERZ AND REFRIGERATION SYSTEMZ SALEZ AND SERVICING.
24. MZ REVERSE OSMOSIS WATER PURIFIERZ AND WATER SOFTNERZ.
25. MZ MEDICAL TOURIZM.
LOOKING FORWARD TO HEARING FROM YOU.
REGARDZ
Mannu Kumar GossainProprietor.MZ Consultants.-----------------------------------------------------------1. DISCLAIMER:-----------------------------------------------------------2. TERMZ AND CONDITIONZ APPLY.---------------------------------------------------------
-
8/8/2019 Mz Documents.
3/293
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
FUEL FROM WATER FOR CARZ AND GAS GENERATORS.
Concept Car Fuel ITo,The Chairman and Managing Director,
Many vehicles worldwide are already running on propane gas and natural gas. These cars and gasgenerators can be made to run on hydrogen and oxygen gases as well.
There is a safe and better way to produce these simple gases that could run any gasoline engine.
Simply store the water in a holding tank and then use water pump to pump the water into theseparation fuel cell box or Electrolyzer, then thru Electrolysis water can be broken into hydrogen andoxygen gases. These gases when burnt in the combustion chamber gives power to the engine.
Water vapor is the exhaust of the combustion process. Thru a switch control, exhaust can be throwout into fresh air thru the exhaust pipe to have better temperature control in warmer climate. In coclimate the exhaust can be collected and directed back to the holding tank again for reuse.
When the fuel used is hydrogen and oxygen gases, the material of construction of the engine is thesame as original as supplied by the engine manufacturers for Petrol carz. Miniature Multipoint waterelectrolysis system or fuel generation system is needed. Timing needs to be set once the system is in
place.
ELECTROLYSIS OF WATER.
By providing energy from a battery, water (H2O) can be dissociated into the diatomic molecules ofhydrogen (H2) and oxygen (O2). This process is a good example of the the application of the four
thermodynamic potentials.
-
8/8/2019 Mz Documents.
4/294
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
The electrolysis of one mole of water produces a mole of hydrogen gas and a half-mole of oxygengas in their normal diatomic forms. A detailed analysis of the process makes use of the thermodyamicpotentials and the first law of thermodynamics. This process is presumed to be at 298K and oneatmosphere pressure, and the relevant values are taken from a table of thermodynamic properties.
Quantity H2O H2 0.5 O2 Change
Enthalpy -285.83 kJ 0 0 H = 285.83 kJ
Entropy 69.91 J/K 130.68 J/K 0.5 x 205.14 J/K TS = 48.7 kJ
The process must provide the energy for the dissociation plus the energy to expand the producedgases. Both of those are included in the change in enthalpy included in the table above. Attemperature 298K and one atmosphere pressure, the system work is
W = PV = (101.3 x 103 Pa)(1.5 moles)(22.4 x 10-3 m3/mol)(298K/273K) = 3715 J
Since the enthalpy H= U+PV, the change in internal energy U is then
U = H - PV = 285.83 kJ - 3.72 kJ = 282.1 kJ
This change in internal energy must be accompanied by the expansion of the gases produced, so thechange in enthalpy represents the necessary energy to accomplish the electrolysis. However, it is not
necessary to put in this whole amount in the form of electrical energy. Since the entropy increases inthe process of dissociation, the amount TS can be provided from the environment at temperature T.The amount which must be supplied by the battery is actually the change in the Gibbs free energy:
G = H - TS = 285.83 kJ - 48.7 kJ = 237.1 kJ
Since the electrolysis process results in an increase in entropy, the environment "helps" the processby contributing the amount TS. The utility of the Gibbs free energy is that it tells you what amount of
energy in other forms must be supplied to get the process to proceed.
Hydrogen Fuel Cell
Hydrogen and oxygen can be combined in a fuel cell to produce electrical energy. A fuel cell uses achemical reaction to provide an external voltage, as does a battery, but differs from a battery in thatthe fuel is continually supplied in the form of hydrogen and oxygen gas. It can produce electricalenergy at a higher efficiency than just burning the hydrogen to produce heat to drive a generatorbecause it is not subject to the thermal bottleneck from the second law of thermodynamics. It's onlyproduct is water, so it is pollution-free. All these features have led to periodic great excitement about
-
8/8/2019 Mz Documents.
5/295
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
its potential, but we are still in the process of developing that potential as a pollution-free, efficientenergy source (see Kartha and Grimes).
Combining a mole of hydrogen gas and a half-mole of oxygen gas from their normal diatomic formsproduces a mole of water. A detailed analysis of the process makes use of the thermodynamicpotentials. This process is presumed to be at 298K and one atmosphere pressure, and the relevantvalues are taken from a table of thermodynamic properties.
Quantity H2 0.5 O2 H2O Change
Enthalpy 0 0 -285.83 kJ H = -285.83 kJ
Entropy 130.68 J/K 0.5 x 205.14 J/K 69.91 J/K TS = -48.7 kJ
-
8/8/2019 Mz Documents.
6/296
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
Energy is provided by the combining of the atoms and from the decrease of the volume of the gases.Both of those are included in the change in enthalpy included in the table above. At temperature 298Kand one atmosphere pressure, the system work is
W = PV = (101.3 x 103 Pa)(1.5 moles)(-22.4 x 10-3 m3/mol)(298K/273K) = -3715 J
Since the enthalpy H= U+PV, the change in internal energy U is then
U = H - PV = -285.83 kJ - 3.72 kJ = -282.1 kJ
The entropy of the gases decreases by 48.7 kJ in the process of combination since the number ofwater molecules is less than the number of hydrogen and oxygen molecules combining. Since thetotal entropy will not decrease in the reaction, the excess entropy in the amount TS must beexpelled to the environment as heat at temperature T. The amount of energy per mole of hydrogenwhich can be provided as electrical energy is the change in the Gibbs free energy:
G = H - TS = -285.83 kJ + 48.7 kJ = -237.1 kJ
For this ideal case, the fuel energy is converted to electrical energy at an efficiency of 237.1/285.8x100% = 83%! This is far greater than the ideal efficiency of a generating facility which burned thehydrogen and used the heat to power a generator! Although real fuel cells do not approach that ideal
efficiency, they are still much more efficient than any electric power plant which burns a fuel.
Comparison of electrolysis and the fuel cell process
In comparing the fuel cell process to its reverse reaction, electrolysis of water, it is useful treat theenthalpy change as the overall energy change. The Gibbs free energy is that which you actually haveto supply if you want to drive a reaction, or the amount that you can actually get out if the reaction isworking for you. So in the electrolysis/fuel cell pair where the enthalpy change is 285.8 kJ, you haveto put in 237 kJ of energy to drive electrolysis and the heat from the environment will contributeTS=48.7 kJ to help you. Going the other way in the fuel cell, you can get out the 237 kJ as electricenergy, but have to dump TS = 48.7 kJ to the environment.
CALORIFIC VALUE OF HYDROGEN A COMPARISON.
The calorific value of a fuel is the quantity of heat produced by its combustion - at constant pressureand under "normal" conditions (i.e. to 0oC and under a pressure of 1,013 mbar).
The combustion process generates water vapor and certain techniques may be used to recover thequantity of heat contained in this water vapor by condensing it.
-
8/8/2019 Mz Documents.
7/297
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
The Higher Calorific Value (or Gross Calorific Value - GCV) suppose that the water of combustion isentirely condensed and that the heat contained in the water vapor is recovered.
The Lower Calorific Value (or Net Calorific Value - NCV) suppose that the products of combustioncontains the water vapor and that the heat in the water vapor is not recovered.
Fuel
Higher Calorific Value
(Gross Calorific Value - GCV)
kJ/kg Btu/lb
Diesel 44,800 19,300
Ethanol 29,700 12,800
Gasoline 47,300 20,400
Hydrogen 141,790 61,000
Methane 55,530
Petrol 48,000
Petroleum 43,000
Propane 50,350
kJ/m3 Btu/ft3
-
8/8/2019 Mz Documents.
8/298
Hydrogen 13,000
Natural gas 43,000
y 1 kJ/kg = 0.4299 Btu/ lbm = 0.23884 kcal/kg
y 1 Btu/lbm = 2.326 kJ/kg = 1.8 kcal/kg
PROPERTIES OF HYDROGEN GAS.
Hydrogen Gas
It is a chemical element that exists as a gas at room temperature. Hydrogen gas is odorless,tasteless, colorless, and highly flammable. When hydrogen gas burns in air, it forms water.
When mixed with oxygen across a wide range of proportions, hydrogen explodes upon ignitionHydrogen burns violently in air. It ignites automatically at a temperature of 560 C
Molecular Weight
Molecular weight : 2.016 g/mol
Solid phase
Melting point : -259 CLatent heat of fusion (1,013 bar, at triple point) : 58.158 kJ/kg
Liquid phase
Liquid density (1.013 bar at boiling point) : 70.973 kg/m3Liquid/gas equivalent (1.013 bar and 15 C (59 F)) : 844 vol/volBoiling point (1.013 bar) : -252.8 CLatent heat of vaporization (1.013 bar at boiling point) : 454.3 kJ/kg
Gaseous phase
Gas density (1.013 bar at boiling point) : 1.312 kg/m3Gas density (1.013 bar and 15 C (59 F)) : 0.085 kg/m3Compressibility Factor (Z) (1.013 bar and 15 C (59 F)) : 1.001
Specific gravity (air = 1) (1.013 bar and 21 C (70 F)) : 0.0696Specific volume (1.013 bar and 21 C (70 F)) : 11.986 m3/kgHeat capacity at constant pressure (Cp) (1 bar and 25 C (77 F)) : 0.029 kJ/(mol.K)Heat capacity at constant volume (Cv) (1 bar and 25 C (77 F)) : 0.021 kJ/(mol.K)Ratio of specific heats (Gamma:Cp/Cv) (1 bar and 25 C (77 F)) : 1.384259Viscosity (1.013 bar and 15 C (59 F)) : 0.0000865 PoiseThermal conductivity (1.013 bar and 0 C (32 F)) : 168.35 mW/(m.K)
-
8/8/2019 Mz Documents.
9/299
Miscellaneous
Solubility in water (1.013 bar and 0 C (32 F)) : 0.0214 vol/volConcentration in air : 0.00005 vol %
Auto ignition temperature : 560 C
Major Hazards
Major hazard : Fire and High PressureToxicity (Am. Conf. Of Gov. Ind. Hygienists ACGIH 2000 Edition) : Simple AsphyxiantFlammability limits in air (STP conditions) : 4.0-75 vol%Odour : NoneUN Number : UN1049 (gas); UN1966 (liquid refrigerated)EINECS Number : 215-605-7DOT Label (USA) : FGDOT Hazard class (USA) : Flammable Gas
LINE DIAGRAM OF FUEL FROM WATERFOR CARZ AND HYDROGEN GAS GENERATORS.
ENGINE(SPARK
IGNITION
DYNAMOS
BATTER
IES
HYDROGENANDOXYGENGAS LINE
ELECTRICRECHARGE
AIRMIXER
ELECTRICLINE
WATER
ELECTROLYZER.
WATER
LINE.
-
8/8/2019 Mz Documents.
10/2910
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
Specification Of Maruti 800 AC LPG
Maruti 800 AC LPG Engine
Engine Type In-Line Engine
Engine Description0.8L 35bhp 3 cyl. In-line, FCengine
Engine Displacement(cc) 796
No. of Cylinders 3Maximum Power 35.5 @ 5,000 (PS@rpm)
Maximum Torque 5.7 @ 2,500 (kgm@rpm)
Valves Per Cylinder 2
Fuel Supply System MPFI
Bore x Stroke 68.5 x 72.0 mm
Compression Ratio 8.8:1
Turbo Charger No
Super Charger No
Maruti 800 AC LPG Transmission
Transmission Type Automatic
Gear box 4 Speed
Drive Type FWD
Synchronizers Reverse only
Maruti 800 AC LPG Suspension System
Front Suspension Mcpherson strut & coil spring
Rear Suspension Coil spring
ShockAbsorbers Type Gas Filled
Maruti 800 AC LPG Steering
-
8/8/2019 Mz Documents.
11/2911
Steering Type Manual
Steering Column Collapsible
Steering Gear Type Rack & Pinion
Turning Radius (wheel base) 4.4 m
Maruti 800 AC LPG Brake System
Front Brake Type Disc
Rear Brake Type Drum
Maruti 800 AC LPG Fuel
Mileage-City (kmpl) 12.4
Mileage-Highway (kmpl) 16.6
Fuel Type LPG
Fuel Tank Capacity (litres) 19
Emission Norm Compliance Bharat Stage III
Maruti 800 AC LPG Tyres
Tyre Size 145/70 R 12
Tyre Type Radial
Wheel Size 12 x 4 J
Maruti 800 AC LPG Other Specifications
Seating Capacity 5
No of Doors 4
General Maruti 800 AC LPG Car Details
Country of Assembly India
Country of Manufacture India
Introduction Date 06-June-2008
Warranty Time 2 years
-
8/8/2019 Mz Documents.
12/2912
MPFI System
MPFI:
M.P.F.I. means Multi Point Fuel Injection system. In this system each cylinder has number ofinjectors to supply/spray fuel in the cylinders as compared to one injector located centrally tosupply/spray fuel in case of single point injection system.
Stage(1)
Stage(2)
Stage(3)
-
8/8/2019 Mz Documents.
13/2913
Stage(4)
Advantage of M. P. F. I.
(1) More uniform A/F mixture will be supplied to each cylinder, hence the difference in powerdeveloped in each cylinder is minimum. Vibration from the engine equipped with this system is less,due to this the life of engine components is improved.
(2) No need to crank the engine twice or thrice in case of cold starting as happens inthe carburetor system.
(3) Immediate response, in case of sudden acceleration / deceleration.
(4) Since the engine is controlled by ECM* (Engine Control Module), more accurate amount of A/Fmixture will be supplied and as a result complete combustion will take place. This leads to effectiveutilization of fuel supplied and hence low emission level.
(5) The mileage of the vehicle will be improved.
ECM ( Engine Control Module) and its function
The function of ECM is to receive signal from various sensors, manipulate the signals and sendcontrol signals to the actuators.
Sensors; Sensing different parameters (Temperature, Pressure, Engine Speed etc.) of the engineand send signal to ECM.
Actuators; Receives control signal from ECM and does function accordingly (ISCA, PCSV, Injectors,Power Transistor etc.)
Case I: If ECM fails to send control signal to all actuators then the engine won't get started.
Case II: If ECM fails to service from all sensors then also the engine won't get started.
-
8/8/2019 Mz Documents.
14/2914
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
Concept Car Fuel - IIElectricity as Primary Power.
1. Battery Pack: Provides Power to Electric motor. It takes about 8 hours to recharge andprovide power for 60 km.
2. Power Ports: Car has Power ports connected to standard electric supply to recharge theBattery.
3. Electrolysis of water: Constant electricity current from batteries is used for electrolysis ofwater in Electrolyzer to produce hydrogen and oxygen gases at a steady rate. These gasesare then used as a fuel to run an on board generator at a steady speed to continuously
recharge the batteries on board.4. On Board Generator: The speed of the Generator is such that it generates steady current that
is adequate to recharge all the batteries in 5- 8 hours time. Further the batteries provide powerto the Electric Motor.
5. Brakes: Kinetic energy from braking is used to run a dynamo to produce electricity to recharge
the battery.
Note: Sources to be found out from Google India for above Fuel System Integration are as under:
1. Piston Rings manufacturers.2. Holding tank Manufacturers.
3. Air Tight and leak proof Gases storage system and piping system to the intake valve of engine.System Manufacturers.
4. Water Electrolysis Equipment. - Physics Lab Equipment Manufacturers.5. Maintenance free rechargeable Batteries Manufacturers.6. Dynamo manufacturers.7. Hydrogen and oxygen gases operated Gas Generator Manufacturers.8. Electric Motor Manufacturers.
Consultancy Fee for the above write up is INR Five Hundred Thousand Crores Only. Cheque or DDpayable to Mannu Kumar Gossain - Proprietor MZ Consultants may please be sent to the abovementioned address or Dropped in any HDFC Bank ATM.
Thanks and regards,
Mannu Kumar Gossain.Proprietor.
www.mzconsultants.com
-
8/8/2019 Mz Documents.
15/2915
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
FIVE STAR HOTEL PROJECT
To,The Chairman and Managing Director,Dear Sir,
Please find below Diagram of a Five Star Hotel in which I have shown room interiors and rooms layout. The corner roomsizes are 29x16 feet and rest of the rooms is 29x12 feet. Please refer the diagram for the layout of the Room, Bath Room,Kitchen, Restaurant and Swimming Pool Area etc.
The Five Star Hotel will have one to ten similar wings parallel to each other with all the facilities mentioned belowdepending upon the space available to us.
Access: Yet to be Finalized.Rooms: 800-1000 Proposed RoomsCheck in / Out Time : 12.00 NoonTariff: INRSingle: 9000/-Double: 10000/-Double Executive: 16000/-Double Luxury: 20000/-Double Deluxe: 38000/-Taxes: As ApplicableLuxury Tax: 5%
Cuisine: Multi Cuisine.Air Conditioning: Centrally Air Conditioned.Other facilities: 24 hours Room Service, Business Center, Secretarial Services, Bank, Billiards room, Beauty Saloon,Barber Shop, Broad Band Internet, Doctor on Call, Laundry and Dry Clean, Health Club, Travel Desk, Car Rentals, BabySitting, Safe Deposits, Swimming Pool, Tennis Courts, Golf Putting Green, Car Parking, Meeting Room and BanquetFacility comprises of 50 to 1000 guests auditorium and a 50-2000 guests Cocktails / Reception.
If the diagram is treated as point of origin for construction of a Hotel or a Guest House or copied for modifications in theexisting Hotels / Guest Houses in the Country or Outside the Country, then Consultancy Fee will Apply.
Please consult a Senior Corporate Lawyer for legal issues.
We look forward to hearing from you.
Thanks and Regards,
Mannu Kumar Gossain
Proprietor.
MZ Consultants.
-
8/8/2019 Mz Documents.
16/2916
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
FIVE STAR HOTEL PROJECT .
3 5 2 6 2 3 2 6
BED
SHOWER
CORRIDOR4
5
7
10 OR 20 FLOORS ROOM ARRANGEMENT.
L SSTORE
CORRIDOR
ROOM 3
ROOM 1
ROOM 2 ROOM 4
ROOM 5
ROOM 7 ROOM 8
ROOM 6 ROOM 9
ROOM DIMENSIONS &
INTERIORS.
TABLE
CHAIRB
ALCON
Y
BALCONY
SAME ROOMINTERIORS.
-
8/8/2019 Mz Documents.
17/2917
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
FIVE STAR HOTEL PROJECT .
GROUND FLOOR PLAN.
L SENTER.
GENTS.
LADIES
STORE.CHAIRMANS
CABIN.RECEPTION. MGR
CABIN.
BUSINESCENTER.
BAR.
STORE /KITCHEN.
SHOPPING AREA.
L S
KITCHEN IN BASEMENT.
SITTING AREA.
-
8/8/2019 Mz Documents.
18/2918
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell:+919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
HOUSE DUPLEX PROJECT.
To,The Chairman and Managing Director,
____________________________________________________________________
Dear Sir,
Please find below / attached an architectural floor plan of a Duplex House which can be constructedon a 400/450 Sq. Yard plot as per given dimensions, preferably for a North facing Plot.
Please note that for other plot sizes viz. 200 / 250 / 300 / 350 etc. the dimensions have to be changsuitably.
The dimensions shown are in feet. All the three Bedroom sizes are same (14x16 feet) with attachbathrooms (5x10 feet) each. The length of the Drawing room cum Dining room is 30feet and the wivaries as per the drawings shown below/attached.
If the diagram is treated as point of origin for construction of a House or copied for modifications inExisting house/s, in the country or outside the country then consultancy fee will apply.
Please consult a senior lawyer for legal issues.
We look forward for hearing from you.
Thanks and regards,
Mannu Kumar Gossain
Proprietor.MZ Consultants
-
8/8/2019 Mz Documents.
19/2919
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
HOUSE DUPLEX PROJECT 1.
PORTICO
BALCONY
10
UP
25 5 14
WINDOW
FIRST FLOOR
CUPBOARD
SHOWER
ROOM 2
30
4
10
SHOWER
CUPBOARD
WINDOW
BALCONY
ROOM 3
UP TO ROOF
UPSTAIRS
WINDOW
WINDOW
-
8/8/2019 Mz Documents.
20/2920
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
HOUSE DUPLEX PROJECT 1.
CAR PARKING
10
UP
UP
25 5 14
WINDOW
GROUND FLOOR
CUP BOARD
SHOWER
ROOM 1
30
WINDOWWINDOW
FRI
DGE
SLABBLACK
SLAB
DOOR
UPSTAIRS
TO FIRSTFLOOR
WINDOW
WINDOW
WASHING
KITCHEN
-
8/8/2019 Mz Documents.
21/29
-
8/8/2019 Mz Documents.
22/2922
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell:+919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
RESIDENTIAL FLAT PROJECT.
To,
The Chairman and Managing Director,
Dear Sir,
Please find below a Drawing of a Residential Flats Project. This plan is to be taken on for constructionfor a building of 4 to 6 floor as per building byelaws. There will be four flats on each floor interiors are
shown in the drawing below.
The drawing is for plot sizes 400 to 1000 Sq yards. The dimensions will vary as per the plot size. Theland is to be provided by the customer that we will take on development. We can help you to find asuitable land brokerage fee will be charged as per market rates
Please be informed that we are flexible to make changes in the layout of the flats as per therequirements of the customer/s. The pillar position will be decided once we freeze the drawing of ourclients. However once the pillar positions have been frozen then there can be no changes made inthe location of the Pillars. However changes in the layout of the Flat can be made as per thecustomers needs, Pillar positions being the same.
If the Drawing is treated as point of origin for construction of a Residential Project or copied formodifications in existing Flats in the Country or Outside the Country, then Consultancy Fee will apply.
Please consult a Senior Corporate Lawyer for legal issues.
We look forward to hearing from you.
Thanks and Regards,
Mannu Kumar Gossain
Proprietor.
MZ Consultants.
-
8/8/2019 Mz Documents.
23/2923
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
RESIDENTIAL FLAT PROJECT DESIGN 1.
WINDOW WINDOW WINDOW
SLABSHOWER
BEDKITCHEN
CUPBOARD COMP SLAB
FLAT NO1DRAWING ROOM DINING ROOM
BEDSHOWER
LIFT STAIRS
FLAT NO 3 FLAT NO 4
B
ALCONY
BALCONY
C
UPBOARD
-
8/8/2019 Mz Documents.
24/2924
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
To,
The Chairman and Managing Director,
Dear Sir,
Please find enclosed a Project Drawing Layout of a Imported Car Showroom cum Service Station. Please see abovementioned website click Legal for terms of use of this Project Document.
Project Drawings Details :
1. Land required: Approximately 100 ft x 150 ft. However for different areas resizing can be done and we can design a
workshop for individual needs on available land area.2. Display Area: Approximately Eight Carz can be accommodated.3. Car lifts: Six carz can be lifted for repairs and servicing.4. Store Room: Inventory of Fast Moving Goods should be kept. Rate of consumption depends on yearly data availableand Forecasting. Inventory depends on customer generation and customer retention.5. Parking area: 10-20 Carz can be parked.6. Automatic Car wash: Area ( Approx. 15 ft x 25 ft) Depends on the size of Equipment available in Market.7. Tool Room: For keeping special tools.8. Billing Room: For various commercial activities of the cars that have come for repairs and servicing like gate passissue, Invoicing, Material Issues, monitoring of the workshop can be done from this room.
Pricing of MZ Consultants :
1. Consultancy Fee for Project Drawings - 5% Of The Total End User Project Cost.2. Supervision of construction. 5% Of The End User Project Cost.3. Material is to be provided by the Customer. Or MZ Consultants will assist purchases material for construction at actuarates approved by the customer - Labor Cost for procurement of material for construction is 5 % of Total End user ProjecCost.4. The Contractor will be of the choice of the customer.
Payment terms :
1. 100% Advance payment to be made in stages for each floor for the basic concrete structure.2. Costing for the interiors (wood work, polishing, painting, electrical works etc ) is separate,
100% Payment is to be made in stages for each Floor.3. Taxes and Duties to be paid by the customer as applicable.4. Air Travel Business Class Ticket to Customers Account.5. Boarding in a 5 Star Hotel to Customers Account.6. Cheque or DD payable to Mannu Kumar Gossain Proprietor - MZ Consultantsmay please be sent to the abovementioned address or Dropped in any HDFC Bank ATM, after project cost evaluation.
Thanks and Regards
Mannu Kumar GossainProprietor.
www.mzconsultants.com
-
8/8/2019 Mz Documents.
25/2925
-
8/8/2019 Mz Documents.
26/2926
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
Scope of Supply and Pricing of MZ Consultants for End Users for following projects viz-
1. Hotel / Guest House / Food Court / Restaurant Project.
2. House-Duplex Project.
3. Residential Flat Project.
Pricing of MZ Consultants :
1. Consultancy Fee for Project Drawings - 5% Of The Total End User Project Cost.2. Supervision of construction. 5% Of The End User Project Cost.3. Material is to be provided by the Customer. Or MZ Consultants will assist purchases materia
for construction at actual rates approved by the customer - Labor Cost for procurement ofmaterial for construction is 5 % of Total End user Project Cost.
4. The Contractor will be of the choice of the customer.
Payment terms :
1. 100% Advance payment to be made in stages for each floor for the basic concrete structure.2. Costing for the interiors (wood work, polishing, painting, electrical works etc ) is separate,
100% Payment is to be made in stages for each Floor.3. Taxes and Duties to be paid by the customer as applicable.4. Air Travel Business Class Ticket to Customers Account.5. Boarding in a 5 Star Hotel to Customers Account.6. Cheque or DD payable to Mannu Kumar Gossain - Proprietor - MZ Consultants may please
be sent to the above mentioned address or Dropped in any HDFC Bank ATM, after projectcost evaluation.
We now look forward to hearing from your end.
Thanks and Regards,
Mannu Kumar Gossain
Proprietor.
MZ Consultants.
-
8/8/2019 Mz Documents.
27/2927
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
Dated: April 26, 2006
To,
The Chairman and Managing Director,
__________________________________________________________________________
Dear Sir,
Please find enclosed a Diagram for implementing an Automatic Water Management System ina home and/or in a residential flats project and/or in a housing colony project and/or even putting it on
the Internet. If this Diagram and/or this letter is treated as the point of origin for implementing this
system and/or related system in a home and/or in a residential flats Colony and/or in a housing
colony, and/or in any National and/or Multi National Organization and/or Government Organization
and/or Defense Organization and/or Office and/or Factory and/or Shop or Shopping Complex and/o
Trader and/or Jeweler and/or any Organization any where in the country or outside the country then
Consultancy Fee will apply.
Advantages of using Automatic Water Management System are as follows:
1. There is no tension of switching the pump on/off it is an automatic system.
2. There is no need to monitor the water level in the overhead tank and worry about over flowing it is
automatically controlled.
3. You can avoid tension and embarrassment in ensuring water for bathing when there is a guest
water level is automatically controlled.
4. Water level in the overhead tank is always full as long as there is electricity.
5. Automatic Water Management System adds Pride, Value and Comfort to your building.
We look forward to hearing from you.
Regards,
Mannu Kumar Gossain
Proprietor.
MZ Consultants.
-
8/8/2019 Mz Documents.
28/2928
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
DIAGRAM OF AUTOMATIC WATER MANAGEMENT SYSTEM
(1) DRINKING WATER LINE IS SEPARATE FROM BATHING WATER LINE TO AVOID MIXING ANDCONTAMINATION
(2) DRINKING WATER LINE CAN ALSO BE PROVIDED WITH A SEPARATE AUTOMATIC PUMPING SYSTEM ASSHOWN ABOVE.
(3) DURING DRY RUN THE MOTOR TRIPS AUTOMATICALLY.
DRINKINGWATERLINE
DRINKINGWATER
TANK
WASHINGBATHINGWATERTANK
MAINS
PANNEL
0
WATERSUMP
MOTOR/PUMP
ELECTRICAL
S
IGNAL
FROM
WATE
R
LEV
EL
INDICA
TOR
ON/OFFSWITCH
KITCHEN TAP
KITCHAN TAP
HOUSE /FACTORY /
SHOP
ELECTRICITY
WATERFROM
SUMP
WATER LEVEL INDICATOR
WATERSOFTNER
WATER FROM WATER TANK PIPELINE
-
8/8/2019 Mz Documents.
29/29
MZ Consultants.Shop No.1, Manjeera Nivas Apts., Sri Sai Krupa Officers Colony, Yapral, Secunderabad 500087,India.
Cell: +919491037548.Email:[email protected], [email protected], [email protected]
Website: www.mzconsultants.com, Dated: 25/7/2006., Reg.No.:ALO19/HYD/49/2010.
Scope of Supply for MZ Consultants and Pricing of Automatic Water Management System:
1. Outright Sale Price
2. Consultancy Fee -
3. Panel -
4. Sensors and wiring
5. On/Off Switch.
6. Motor/Pump Horse power as per Capacity/Specifications.
7. Motor/Pump Fitment charges.
8. OverHead Tanks (Drinking Purpose & Bathing Purpose).
9. OverHead Tanks Fitment charges.
10. Pipes as per specifications and Fitment charges.
11. Water Softener price as per specifications. Fitment charges
12. Digging and preparation of Sump. Price as per capacity.
Payment terms :
1. 100% Advance for purchase of equipment and transportation to customers account.
2. Taxes and Duties to Customers Account as applicable.
3. Air Travel Business Class Ticket to Customers Account.
4. Boarding in a 5 Star Hotel to Customers Account.
Thanks and regards,
Mannu Kumar Gossain
Proprietor.
MZ Consultants.