MOBILE SUBSTATIONSP LU G & P L AY S O LU T I O N S © May 2016, EKOS GROUP. All rights reserved.
![Page 2: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/2.jpg)
Chapter 1Mobile SubstationsIntroduction
![Page 3: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/3.jpg)
Quick, Safe&Reliable Solutions For Your Needs
Minimal Maintenance Needs
May 2016 © 2016, EKOS GROUP. All rights reserved. 3
Low Footprint(Minimal civil work needed)
Plug & Play Design (Modular and easy installation)
Protected AgainstEnvironmental Influences
Low Commissionning Times (Minimal site work, factory tested system)
![Page 4: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/4.jpg)
Plug & Play Solutions up to 400 kV – 100 MVA
• Emergency power restoration in caseof natural disasters
• Grid capacity increase during peakload
• Backup existing system
May 2016 © 2016, EKOS GROUP. All rights reserved. 4
• Temporary solution duringconstruction of a conventional S/S
• Providing distribution network on remote areas
• Backup of an existing systemduring a planned or unplannedmaintenance
• Reduce downtime during repair orreplacements
Emergency Power Supply
Fast Grid Expansion
Maintenance on Existing S/S
![Page 5: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/5.jpg)
Chapter 2Mobile SubstationsSolutions
![Page 6: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/6.jpg)
Compact Solution
• Tailor-Made Solutions Based on Client Requirements
• All modules assembled and tested in factory
• Ready to be commissioned on site
May 2016 © 2016, EKOS GROUP. All rights reserved. 6
![Page 7: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/7.jpg)
Quick Mobilization
• Compact HGIS/GIS and Transformer Design
• Calculated number of axles according toProject Requirements
• Independent suspensions for each line
• All dimensions designed to meet theRequirements of National TransportationRegulations
May 2016 © 2016, EKOS GROUP. All rights reserved. 7
![Page 8: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/8.jpg)
Quick Installation
May 2016 © 2016, EKOS GROUP. All rights reserved. 8
• All Modules Assembled and Tested in Factory
• Transformer filled with oil and tested in factory
• Compatible with both overhead lines or cableconnection on HV Side
• Power-driven cable drum for MV Cables
• Plug&Play terminals for MV GIS
• Plug&Play terminals for power and signalsfor multiple trailer solutions
![Page 9: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/9.jpg)
3D Error-Proof Design
May 2016 © 2016, EKOS GROUP. All rights reserved. 9
Mobile Systems designed by industry-standard applications for eliminating errors.
![Page 10: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/10.jpg)
Chapter 3Mobile SubstationsApplications
![Page 11: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/11.jpg)
Mobile SubstationsHV and Transformer Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 11
Country Turkey (TEIAS)
Voltage Level 154 kV
Requirement Grid Extension
Transformer Power 50 MVA
4 sets of 2 Trailer System were used during peak load times and extension work in urban areas.
![Page 12: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/12.jpg)
Mobile SubstationsHV and Transformer Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 12
![Page 13: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/13.jpg)
Mobile SubstationsHV and Transformer Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 13
![Page 14: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/14.jpg)
Mobile SubstationsHV and Transformer and LV Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 14
Country Algeria (SPE)
Voltage Level 10-60/30 kV
Requirement Quick Delivery
Transformer Power 30 MVA
28 sets of 1 combined Trailer System were delivered in a record five months.
![Page 15: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/15.jpg)
Mobile SubstationsHV and Transformer and LV Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 15
![Page 16: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/16.jpg)
Mobile SubstationsHV and Transformer and LV Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 16
![Page 17: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/17.jpg)
Mobile SubstationsHigh Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 17
Country Algeria (CEEG)
Voltage Level 60/30 kV
Requirement Quick commissioning
10 sets of 3 Trailer System were used during peak load times
and extension work in urban areas.
![Page 18: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/18.jpg)
Mobile SubstationsHigh Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 18
![Page 19: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/19.jpg)
Mobile SubstationsHigh Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 19
![Page 20: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/20.jpg)
Mobile SubstationsTransformer Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 20
Country Algeria (CEEG)
Voltage Level 60/30 kV
Requirement Quick commissioning
Transformer Power 20 MVA
![Page 21: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/21.jpg)
Mobile SubstationsTransformer Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 21
![Page 22: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/22.jpg)
Mobile SubstationsTransformer Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 22
![Page 23: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/23.jpg)
Mobile SubstationsMedium and Low Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 23
Country Algeria (CEEG)
Voltage Level 60/30 kV
Requirement Quick commissioning
![Page 24: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/24.jpg)
Mobile SubstationsMedium and Low Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 24
![Page 25: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/25.jpg)
Mobile SubstationsMedium and Low Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 25
![Page 26: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/26.jpg)
Mobile SubstationsHigh Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 26
Country Algeria (Gama)
Voltage Level 220 kV
Requirement Fast Track Power Plant Project
6 trailer solution was designed specifically for the Power Plant connection.
![Page 27: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/27.jpg)
Mobile SubstationsHigh Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 27
![Page 28: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/28.jpg)
Mobile SubstationsLow Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 28
Country Algeria (Gama)
Voltage Level 220 kV
Requirement Fast Track Power Plant Project
6 trailer solution was designed specifically for the Power Plant connection.
![Page 29: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/29.jpg)
Mobile Substations – SkidsMedium and Low Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 29
Country Algeria (Sonelgaz)
Voltage Level 10-30 kV
Requirement Minimal maintenance required
27 sets were used during planned maintenance works in harsh conditions.
![Page 30: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/30.jpg)
Mobile Substations – SkidsMedium and Low Voltage Module
May 2016 © 2016, EKOS GROUP. All rights reserved. 30
![Page 31: MOBILE SUBSTATIONS - ekosinerji.com](https://reader030.vdocuments.site/reader030/viewer/2022012705/61a6a51ab089003f4b6fc6a0/html5/thumbnails/31.jpg)
Thanks…
May 2016 © 2016, EKOS GROUP. All rights reserved. 31