Download - MBA Weekly Bulletin vol.58 issue#45
WEEKLY BULLETIN
www.marinba.org ◆ [email protected] November 11, 2014 Vol. 58, Issue #45
WORLD CLASS SHOWSPhone: (650) 593-2465Website: www.worldclassshows.comJoin Date: 10/1/2014Categories: RENTAL, EQUIPMENT & EVENTS
CALIFORNIA BANK AND TRUSTPhone: (415) 524-1212Website: www.calbanktrust.comJoin Date: 10/7/2014Categories: BANKS & FINANCIAL INSTITUTIONS
MAHONEY ARCHITECTS & INTERIORSPhone: (415) 389-1058Website: www.mahoney-architects.comJoin Date: 10/10/2014Categories: ARCHITECTS & DESIGNERS
FRONT PORCH REALTY GROUPPhone: (415) 847-6519Website: www.frontporchrealtygroup.comJoin Date: 10/14/2014Categories: REAL ESTATE, PROPERTY MANAGEMENT & DEVELOPMENT
SANDLER TRAININGPhone: (415) 606-8991Website: http://lindapalermo.sandler.com Join Date: 10/20/2014Categories: MISCELLANEOUS, Consultants
ACCUCHEX CORPORATIONPhone: 415-883-7733 X 110Website: www.accuchex.comJoin Date: 10/24/2014Categories: ACCOUNTING
CAPITAL TRUST ADVISORSPhone: (415) 399-9100Website: www.capitaltrustadvisors.comJoin Date: 10/29/2014Categories: FINANCIAL & MERCHANT SERVICES
HABITAT FOR HUMANITYPhone: (415) 625-1044Website: www.habitatgsf.orgJoin Date: 10/29/2014Categories: GENERAL BUILDING- RESIDENTIAL, COMMERCIAL, NEW & REMODEL
MARIN GENERAL HOSPITALPhone: (415) 925-7424Website: www.maringeneral.orgJoin Date: 10/29/2014Categories: MEDICAL - SAFETY
TAMCO CONSTRUCTION, INC.Phone: (415) 439-3963Website: http://facebook.com/tamcoconstructionJoin Date: 10/31/2014Categories: GENERAL BUILDING- RESIDENTIAL, COMMERCIAL, NEW & REMODEL
ASHLEY BOCK/ALAIN PINEL REALTORSPrimary Phone: (415) 335-5525Website: http://apr.comJoin Date: 10/31/2014Categories: REAL ESTATE, PROPERTY MANAGEMENT & DEVELOPMENT
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 2
02.06.15ANNUAL MBA CRAB FEED@ Margaret Todd Center, NovatoTIime & Details TBD
01.13.15JANUARY MBA QUARTERLY CONNECTION HOSTED BY YOUR MBA BOARD AND STAFF
@ MBA Office5 PM Intros | 5:30 PM Presentation | 6 PM Q&A
12.11.14MBA HOLIDAY OPEN HOUSE JOIN IN THE SPIRIT!
@ Marin Builders Association4:30 PM - 6:30 PM
BID REQUESTS
www.marinba.org ◆ [email protected]
Bid Requests subject to change,please check with Association.
SAVE THE DATES
REQUEST FOR QUALIFIED MBA/WBE/DBE/DVBE SUBCONTRACTORS & SUPPLIERS FOR:
Children’s Administration CenterSFUSD #11762, San Francisco, CA
BID DATE: November 20, 2014 @ 2:00PM
Trades/Supplies needed include:Windows, Framing, Abatement, Paint,
Shades, Fence, Hardware, DoorsBonding May be Required
Pinguelo Construction, Inc., 4171 Suisun Valley Rd., Ste G, Fairfield, CA 94534
Phone: (707) 864-3003 Fax: (707) 864-1661Contact Frank Pinguelo
An Equal Opportunity Employer
NOTICE: OF ESTABLISHMENT OF QUALIFIED CONTRACTOR’S LIST FOR INFORMAL BIDDING
Notice is hereby given that the Novato Sanitary District (District) is cur-rently establishing a contractors list for 2015 calendar year for mailing Notices for Informal Bids under the provisions of the California Uniform Public Construction Cost Accounting Act. Contractors on the list would be mailed Notices Inviting Bids on District projects estimate to cost less than $175,000 and involving work under their license class.
Interested contractors should submit a Letter of Interest to the District with the following information: Name and address of Contractor, Telephone Number, Class of Contractors’s license(s) held and Numbers.
Letters of Interest shall be sent to: Steve Krautheim, Field Services Manager
Novato Sanitary District500 Davidson Street, Novato, CA 94945
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 3
PROJECT OFTHE WEEK
Notice Inviting Sealed Bids
THE REPAIR AND REHABILITATION OF
HIGH STREET BRIDGE (33C-0026) AND
PARK STREET BRIDGE (33C-0027) OVER
OAKLAND ESTUARY, ALAMEDA COUNTY
Due Tuesday, November 25 @ 2:00 PM
Public Works Agency, 951 Turner Court, Room 300, Hayward, CA 94545
Mandatory Pre-bid Meeting:There is a mandatory pre-bid meeting required for all prime contractors, including bidders who attended the pre-bid conference for Specification No. 2148. Interested sub-contractors are invited and encourage to attend pre-bid meetings. The last pre-bid meeting is scheduled for Wednesday, November 12, 2014 at 1 PM, at 951 Turner Court, Room 301, Hayward. Bid Proposals from prime contractors that fail to attend a mandatory pre-bid meeting will be rejected.
GENERAL WORK DESCRIPTION:The project consists of rehabilitating the bridge decks on both bridges, replacing the vehicle barrier system on the Park Street Bridge and the span center lock on the High Street Bridge. This project is subject to all Local, State, Federal laws, rules and guidelines contained in the plans and specifications, including but not limited to payment of prevailing wages. Contractor must possess a Class A license.
Plans and specifications for this project and more may also be viewed online by subscribers to the MBA Online Plan Service.
IN THIS ISSUE________________________
VOL.58 ISSUE#45
Meet Our Newest Members! .............1
Save the Dates .......................................2
Bid Requests ....................................2
Project of the Week ........................3
Things You Need to Know .................6
Phil Vermeulen Update .................7
Capitol Connection .........................12
SAFETY: Flammables - Propane Dispensing ............................13
Permits ..............................................20
Project Bid Schedule .......................27
Classifieds ..........................................47
_______________________
CONTACT MBA660 Las Gallinas Avenue
San Rafael, CA 94903 ◆
Office: 415-462-1220Fax: 415-462-1225
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 4
www.marinba.org ◆ [email protected]
4:30 PM to 6:30 PM at
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 5
www.marinba.org ◆ [email protected]
2014-2015 MBA DIRECTORS & OFFICERS
PresidentTyler Doherty - Cal-West Rentals, Inc.
Vice PresidentTom Barr - Ghilotti Bros., Inc.
Chief Financial Officer John Busick - Bob Kunst Painting
SECRETARYClayton Fraser - West Bay Builders
Past Presidentjim Schalich - Schalich Bros.
Construction
Chief Executive OfficerRick Wells
Mendy Calegari - Marin Roto-RooterOliver Dibble - Dibble & Company
Aimi Dutra - The Dutra GroupDave Garbarino - Marin Sanitary Service, Inc
Jeff Grady - California Mortgage AdvisorsDiane Henderson - DMH Land Use Planning
Dan McLennon - McLennon Law CorporationJeff Mertel - Mertel Carpets
Rob Scerri - Golden State LumberDave Trahan - Patriot Mechanical
Michelle Whiteside - Whiteside ConstructionJohn Zimmerman - Shamrock Materials
STAFFPaula Krause - Office Manager
Barbara Jones - Membership Manager
CONSULTANTSCasey Mazzoni - Legislative Analyst
Phil Vermeulen - Legislative ConsultantTerrence Knoles - Publications
The weekly bulletin is owned by MBA. Archive available at www.marinba.org
660 Las Gallinas Avenue, San Rafael, CA 94903Publisher: Marin Builders Association
MBA MEMBER
415.472.3434
Also available for Expedited Mediations and Arbitrations
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 6
Things You Need to Know
BY CASEY MAZZONIMARIN BUILDERS ASSOCIATION
LEGISLATIVE [email protected]
“The vote is the most
powerful instrument ever
devised by man for breaking
down injustice and destroying
the terrible walls which
imprison men because they are
different from other men.”― Lyndon B. Johnson
www.marinba.org ◆ [email protected] ◆ [email protected]
Do you live in San Rafael and want to be a member of the City Council?
www.cityofsanrafael.org/news/2014/10/21/
applications-for-new-city-councilmember.html
Check out Dan Walters opinion piece regarding Jerry Brown
www.sacbee.com/news/politics-government/
dan-walters/article3572343.html
November 2014Elections Results!
State Assembly – Marc Levine – WON
ENDORSED BY THE MARIN BUILDERS ASSOCIATION
State Senate – Mike McGuire - WON
ENDORSED BY THE MARIN BUILDERS ASSOCIATION
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 7
With the 2015 session of the California State Legislature set to commence in early January, the California Contractors State License Board is proposing to submit to their board their proposed legislative agenda. The following was presented to the CSLB’s Legislative Committee this week and will be formally approved at their December Board meeting in Berkeley. Once approved by the full board, the CSLB staff will work with some of my colleagues and me to find legislators willing to carry these bills. The bills will then be introduced between January and late March and then begin the legislative process.
1). Enforcement of Licensing Provisions Relevant Provisions: Business and Professions Code section 7011.4
Summary:This proposal will expand the authority of Enforcement Representatives (ERs) to issue a written notice to appear (NTA) for failure to secure workers’ compensation insurance.
Staff Comments: An NTA is a court order mandating an individual’s presence at a hearing, on a specified date, to answer to wrongdoings of misdemeanor crimes. Under existing law, ERs with the Contractors State License Board (CSLB) have the authority to issue a written
NTA.
This proposal would expand the jurisdiction of the Enforcement division to include ensuring payment of compensation that may become due to his or her employees. The proposed language does not reference a specific section of the law, but is similar to that in Labor Code (LC) section 3700.5, regarding workers’ compensation (WC) insurance requirements. According to the Enforcement division, under existing law, staff cannot add an LC section 3700.5 violation for failure to carry workers’ compensation to the NTA; therefore, staff must include this violation in a supplemental report along with the NTA. The ability to include the Section 3700.5 violation on the NTA could streamline the district attorney (DA) referral process. CSLB estimates that 20 percent of the NTAs issued for unlicensed practice will include the Section 3700.5 violation (misdemeanor charges filed with the DA for unlicensed activity and no WC policy).
The Department of Industrial Relations’ Division of Labor Standards Enforcement (DSLE) issues citations for failure to carry workers’ compensation insurance, however, it does not file the LC section 3700.5 violations with the DA; DSLE takes administrative action, whereas CSLB files criminal charges with the DA. The Department of Insurance
also takes action against employers for WC violations, but only against those that have WC policies (premium fraud issues), whereas DSLE and CSLB take action for not having a WC policy. DSLE has sole authority to cite for wage violations.
ERs currently list these violations in their written reports, and DA’s determine what charges are filed. This proposal does not significantly change existing practice, as WC violations can be noted in the written reports. Unlicensed contractors are likely violating other wage and tax laws, but this proposal provides specific authority for ERs to cite for WC violations only.
2). Authority to Issue Citations – Collection of Additional Information Relevant Provisions: Business and Professions Code section 7028.6
Summary: This proposal would allow the Contractors State License Board (CSLB) to collect a Social Security number from an individual contracting without a license. This authority would pertain primarily to individuals identified during an undercover sting
CSLB PROPOSES 2015LEGISLATIVE AGENDApresented by Phil Vermeulen, MBA Legislative Advocate
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 8
www.marinba.org ◆ [email protected] ◆ [email protected]
operation. Under existing law, the Contractors State License Board (CSLB) can collect Social Security numbers (SSN) from licensees, but does not have the authority to collect Social Security numbers from individuals who contract without a license.
Staff Comments: This new authority would improve CSLB’s ability to collect fines from unlicensed individuals. CSLB participates in the Franchise Tax Board’s Intercept Collection Program to assist in the collection of fines from licensees. This program intercepts refunds (including unclaimed state property and lottery winnings) when individuals have delinquent debts to government agencies. To seek recovery of a debt through the Intercept Collection Program, CSLB must submit a SSN, and with the authority to collect that information from unlicensed individuals CSLB could more likely collect unpaid fines through fuller participation in the program. One of the requirements to participate in the Intercept Collection Program involves at least a 30-day notification to an individual with an unpaid debt to give that person time to dispute or settle the debt. This proposal could improve the collection rate for citations against unlicensed contractors and, potentially, act as a greater deterrent to engaging in unlicensed activity.
3). Public Works Contracts Relevant Provisions: Business and Professions (B&P) Code section 7059
Summary: This proposal specifies that for public works contracts, a contractor who performs work out of class is subject to disciplinary action by the Contractors State License Board (CSLB). Staff Comments: Under existing law related to public works contracts, the awarding authority is responsible for determining the license classification necessary to bid on and execute the project. The law does prohibit awarding a prime contract to a specialty contractor whose classification constitutes less than a majority of work on the project.
“Public works contract,” as used in this part, means an agreement for the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. Because existing law grants the awarding agency, not CSLB, responsibility for determining which licensed contractor is suitable to perform construction-related work on public works projects, CSLB cannot take disciplinary action against contractors working outside of their classification on public works projects.
Existing law does not require that, when determining which license classification is necessary to bid and perform work on a public works project, awarding agencies do so according to the laws and regulations related to license classifications.
CSLB’s Licensing division has provided awarding agencies classification determinations for public works projects to ensure that they advertise appropriately and CSLB continues to provide training for contract staff at other state and local agencies.
CSLB’s Enforcement division provided some examples of cases where the Attorney General’s Office (AG) advised CSLB that a citation alleging a violation of Business and Professions Code section 7117.6 (acting as a contractor in an unauthorized classification) cannot be sustained:
1. The awarding agency’s contract stated that either a General “A” or a C-16 (Fire Protection) licensee could bid on the project. A General Engineering contractor that did not have the necessary C-16 Fire Protection classification won the bid. CSLB issued a citation but later withdrew it per the AG that the awarding agency, pursuant to B&P Code section 7059, determined that an “A” contractor could perform the fire protection work.
2. A school district solicited a bid for a contract to install ADA pedestrian ramps in a K-8 school. CSLB’s classification deputy reviewed the agency’s advertisement and recommended an “A” General Engineering contractor to perform the scope of work. The awarding agency ignored the recommendation and advertised for and awarded the contract to a “B” General Building contractor. The contractor had difficulty performing the required work, resulting in a financial injury to the agency. An accusation was filed and the licensee has stipulated to a revocation of the license.
While CSLB was able to take action against this licensee under current law, it illustrates the potential harm awarding agencies face when they hire contractors operating outside of their classification. The awarding agency disregarded CSLB’s recommendation and suffered a significant financial loss because of poor workmanship by the unqualified
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 9
www.marinba.org ◆ [email protected] ◆ [email protected]
contractor. In this case, the contractor stipulated to revocation because of the large financial injury involved and other violations. 3. A contractor was awarded a bid to perform work at the John Wayne Airport. CSLB determined that the contractor was working out of class for the scope of work and issued a citation; the contractor appealed. Due to the way the project was advertised and because the awarding agency, per B&P Code section 7059 (b), can determine the required license classification, CSLB agreed to withdraw the citation provided the contractor obtained the appropriate classification.
4). Notification by Licensees of Changes in Recorded Information Relevant Provisions: Business and Professions (B&P) Code sections 136 and 7083
Summary: B&P Code section 136 is a general provision that applies to all Department of Consumer Affairs boards. It requires each licensee to notify the board of an address change within 30 days, unless the board, by regulation, specifies a shorter time. B&P Code section 7083, in the Contractors’ State License Law (CSLL), requires a licensee to notify the Registrar of an address change within 90 days.
Staff Comments: As these two sections establish different time periods for reporting, one of the provisions should be amended to eliminate any potential confusion. Staff recommends amending the section within the CSLL, rather than the provision that applies to all DCA boards, meaning that both sections of the law provide
for a 90-day window. Suggested amendment: B&P Code section 7083. Notwithstanding any other provision of law, All licensees shall notify the registrar, on a form prescribed by the registrar, in writing within 90 days of any change to information recorded under this chapter. This notification requirement shall include, but not be limited to, changes in business address, personnel, business name, qualifying individual bond exemption pursuant to Section 7071.9, or exemption to qualify multiple licenses pursuant to Section 7068.1. Failure of the licensee to notify the registrar of any change to information within 90 days shall cause the change to be effective the date the written notification is received at the board’s headquarters office.
Failure to notify the registrar of the changes within the 90 days is grounds for disciplinary action. Amendment to add Business and Professions Code section 7013.5 – Effect of DisciplinaryAction by Another State Agency.
5). (1) Officer/ Personnel Change Fee; (2) Additional Classification and Replacing the Qualifier Application Fee; (3) Application Priority Processing Fee
PROBLEM/SUMMARY: 1. Officer/Personnel Change Fee Contractor licenses are issued to sole owners, partnerships, corporations, limited liability companies (LLC), and joint ventures. Of these
business types, partnerships, corporations, and LLCs can change the officers/personnel on their license. When licensees change their personnel, they are required by law, pursuant to Business and Professions Code (B&P) section 7083, to notify CSLB.
In the past, processing applications for changes in personnel was relatively simple and involved verifying that the application was complete and that the new personnel were eligible for licensure. However, in recent years, processing these applications has become significantly more complex.
Since CSLB began fingerprinting applicants for licensure in 2005, processing applications for personnel changes includes fingerprinting and criminal background reviews. This additional licensing requirement adds significant staff time to review and analyze conviction documentation and can lead to the denial of a personnel change application because of a criminal conviction. In addition, CSLB began licensing LLCs in 2012, which are subject to bond, insurance, and personnel provisions that do not apply to other business entities. When processing a personnel change application for an LLC, the technician must ensure that these other requirements, which can change based on the number of personnel on the license, still are adequately met.
CSLB does not currently charge a fee to process applications to change personnel on a license, nor does it have the legal authority to do so. CSLB cannot continue this work without charging a fee due to the additional staff resources involved in processing applications for personnel changes. , Based on a workload analysis of the time it takes to
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 10
www.marinba.org ◆ [email protected] ◆ [email protected]
process such an application, an appropriate application fee would be no more than XX dollars ($XX). 2. Additional Classification and Replacing the Qualifier Application Fee Existing licensees can apply to add additional classifications to their license or to replace the qualifying individual on their license. The processing time for an application to add a classification is comparable to that of an application for an original license: verification of the qualifying individual’s experience in the particular classification, and he or she must pass the trade examination for that classification. In addition, any related business name deemed acceptable. An original license application carries a $300 processing fee; however, an additional classification application is currently only $75.
Similarly, the applications to replace the qualifier and to receive an original license involve comparable processing complexity, but vastly different fees. Again, the original license application fee is $300, but the application fee to replace the qualifier is just $75. Since CSLB began fingerprinting applicants for licensure in 2005, processing applications to replace the qualifier includes fingerprinting and criminal background reviews. This additional licensing requirement adds significant staff time to review and analyze conviction documentation and can lead to the denial of a personnel change application because of a criminal conviction.
In addition, CSLB began licensing LLCs in 2012, which are subject to bond, insurance, and personnel provisions that do not apply to other business entities. When processing an application to replace the qualifier for an LLC, the technician must ensure that these
other requirements, which can change based on the personnel on the license, are still adequately met. Due to the complexity and additional staff time involved in processing these applications, the $75 fee is no longer sufficient. Based on a workload analysis of the time it takes to process such applications, an appropriate application fee for both would be no more than XX dollars ($XX). 3. Application Priority Processing Fee CSLB currently accepts requests to expedite processing applications for licensure. When these requests are approved, usually to support significant job creation, the applications move to the front of the line for initial review and processing. These applicants, like all others, must fulfill relevant licensure requirements, including testing and criminal background review. Expedited applications receive priority over others and the processing technicians focus their time on processing them thoroughly and promptly. In 2014, to date, CSLB has received approximately 500 requests to expedite an application, of which XXX (XX%) have been approved. Between the staff that review and act on the original requests and the technicians that devote significant portions of their workday to processing these applications, CSLB has determined that XX PYs are needed for the sole purpose of processing expedited documentation. Currently, CSLB charges no fee to review requests for expedited service or for processing these applications. Under this proposal, requests for priority processing of applications would not be subject to review for cause but, instead, approved upon submission of a completed request and payment of an adequate fee. Given the workload involved, CSLB has determined that an appropriate cost for priority processing would be no more than XX dollars ($XX).
Under certain circumstances, such as a declared emergency or for military personnel, CSLB may need to approve expedited processing of applications based on other changes must be reviewed and provisions of law for specific purposes. Such cases would be exempt from these new provisions and related fees.
PROPOSED CHANGE (Include the Related Sections of Law): Amend B&P Code section 7137 as follows:
The board shall set fees by regulation. These fees shall not exceed the following schedule:
(a) The application fee for an original license in a single classification shall not be more than three hundred dollars ($300). The application fee for each additional classification applied for in connection with an original license shall not be more than seventy-five dollars ($75). The application fee for each additional classification pursuant to Section 7059 shall not be more than seventy-five dollars ($75) XX dollars ($XX). The application fee to replace a responsible managing officer, responsible managing manager, responsible managing member, or responsible managing employee pursuant to Section 7068.2 shall not be more than seventy-five dollars ($75) XX dollars ($XX).
The application fee to add personnel, other than a qualifying individual, to an existing license shall not be more than XX dollars ($XX).
(b) The fee for rescheduling an examination for an applicant who has applied for an original license, additional classification, a change of responsible managing officer, responsible managing manager, responsible managing
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 11
www.marinba.org ◆ [email protected] ◆ [email protected]
member, or responsible managing employee, or for an asbestos certification or hazardous substance removal certification, shall not be more than sixty dollars ($60).
(c) The fee for scheduling or rescheduling an examination for a licensee who is required to take the examination as a condition of probation shall not be more than sixty dollars ($60).
(d) The initial license fee for an active or inactive license shall not be more than one hundred eighty dollars ($180).
(e) The renewal fee for an active license shall not be more than three hundred sixty dollars ($360). The renewal fee for an inactive license shall not
be more than one hundred eighty dollars ($180).
(f) The delinquency fee is an amount equal to 50 percent of the renewal fee, if the license is renewed after its expiration.
(g) The registration fee for a home improvement salesperson shall not be more than seventy-five dollars ($75).
(h) The renewal fee for a home improvement salesperson registration shall not be more than seventy-five dollars ($75).
(i) The application fee for an asbestos certification examination shall not be more than seventy-five dollars ($75).
(j) The application fee for a hazardous substance removal or remedial action certification examination shall not be more than seventy-five dollars ($75).
(k) In addition to any other fees charged to C-10 and C-7 contractors, the board may charge a fee not to exceed twenty dollars ($20), which shall be used by the board to enforce provisions of the Labor Code related to electrician certification.
(l) The application fee for priority processing of applications for licensure shall not be more than XX dollars ($XX). Approved expedited processing of applications for licensure, as required by other provisions of law, shall not be subject to this paragraph.
Bruce Okrepkie707.360.4117
Daniel Walters707.525.4168
Sean Parsons707.525.2715
George Petersen Insurance Agency
NEW MBA Workers’ Compensation & Commercial Insurance Program
We are excited to announce that George Petersen Insurance Agency has developed a new workers’ compensation & commmercial insurance program for the Marin Builders Association. With a 76-year history of insuring local contractors, George Petersen Insurance Agency has the experience and expertise to protect your business.
By partnering with George Petersen Insurance Agency, you’ll receive preferred pricing on your workers’ compensation rates. In addition, you can benefit from working closely with one of George Petersen’s construction-industry professionals. With over 50 years of combined experience, George Petersen’s specialized construction agents have a deep understanding of the industry, allowing them to assess the unique characteristics of your business, its exposures and its evolving needs.
Support the MBA and protect your business by contacting one of our construction specialists today:
License #0603247
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 12
The Capitol Connection Q&A for Contractors By Shauna Krause, Capitol Services, Inc.
Shakespeare offered good advice about names. While a rose may smell as sweet by any other name, for contractors the same may not be true of the description in your business name. When a license Qualifier leaves, going thru the exit door starts the clock on your ability to legally bid or continue working projects in process…
Q: I got my General Contractors license back in the 90’s and have since obtained “C-20” (HVAC) and “C-36” (Plumbing) licenses. It has been many years since I’ve done any building work. I exclusively do plumbing and heating. My business name includes the term “General Contracting” but I want it to reflect my specialty trades. Do I need to add a ‘doing business as’ (dba), or what is the best way to go about this? A: You have a couple options. You can either change the business name with the Secretary of State and then the CSLB to a new company name of your choice, or as you suggested, add a dba to your business name. The second option will allow you to keep your original business name, if that’s important to you, while still using the dba name. If you choose that option keep in mind that you must either do business using the entire name, i.e. ABC General Contracting Inc. dba ABC Plumbing and Heating, or just using the dba name. Q: We are forming a new corporation that will basically be a shell company for our current
contracting company. The shell company will sign the contracts and then sub-contract the work to our current licensed corporation. My first question is whether the shell company needs a license if they will not be performing the work? Secondly, the new entity will not have employees, only Officers. Are Officers considered employees? I’m wondering if we will need to get a new Worker’s Comp policy. A: Both the company signing the contract and the company performing the work will need to be licensed. If you will only have Officers and no additional employees then you can file an exemption from Worker’s Compensation. Keep in mind that the Qualifier will also need to be an Officer and not an RME (Responsible Managing Employee) if you are filing the exemption. Q: Our Qualifier left the company back in July and we haven’t notified the CSLB. We have an application in process with a new Qualifier but he hasn’t taken the exam yet or completed the fingerprint requirement. Our current Qualifier sent us a copy of the Disassociation Notice that he plans to submit to the CSLB noting the date that he resigned from the company. Is there anything that we can do to prevent a lapse in our license?
A: I would suggest filing a 90-day extension immediately. You have 90 days to replace the Qualifying individual, but the CSLB will usually grant a one-time 90-day extension to complete
the process if you have a current application in process to replace the Qualifier. Since you have already submitted an application, you should be eligible to receive the extension. If you do not submit the extension then as soon as the CSLB is made aware of your Qualifier’s disassociation in July, your license will automatically be suspended until the new Qualifier is approved. Contact our office if you’d like assistance with any of this.
While knowledge is power, knowing where to go for the answers
is half the battle. Get expert assistance immediately when you call
866-443-0657, email [email protected], or write us at Capitol
Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814.
Research past columns at www.cutredtape.com.
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 13
Flammables—Propane Dispensing
Propane dispensing stations are found in industrial plants, campgrounds, home improvement stores, service stations, and convenience stores. Proper dispensing of propane protects the safety of operators, the general public, and the surrounding environment. Assure compliance with applicable regulations.
Physical properties of propane:
• Propane is a liquid in its compressed state inside of the cylinder and becomes a gas when pressure is released.
• Propane is colorless and odorless, but an odorant, usually a rotten egg smell, is added to assist in leak detection.
• Compressed propane is very cold and if it comes in contact with your skin or eyes, it will cause burns. Proper personal protective equipment, including gloves and safety glasses resistant to propane, needs to be worn when filling containers.
• Propane is not toxic but if released in a confined space, will displace oxygen. It is heavier than air and will settle in lower areas unless there is significant air movement. Therefore, always assure excellent ventilation.
• Propane is extremely flammable. Sources of ignition are prohibited within 25 feet of the point of transfer. Other combustible materials are prohibited within 10 feet of the point of transfer. Know the location of fire extinguishers and the emergency shut off valve and assure all employees are properly trained.
Inspect cylinders before refilling:
• All cylinders must be manufactured in accordance with industry standard specifications and marked as such. All specifications must be imprinted on the cylinder crown.
• Prior to filling, cylinders must be checked for cracks, bulges, defective valves, dents, or damage to the cylinder valve.
• Assure they are not condemned or past their service date. Cylinders must be requalified or replaced every 5-12 years depending on their condition and their previous requalification method.
• A blue-green stain on the brass portion of the cylinder indicates that it has been in contact with corrosive environments and must not be used.
• Follow all instructions of the supplier and containers being used for propane filling and do not overfill cylinder.
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 14
Flammables—Propane Dispensing
Cylinder marking will show 12-year requalification information and that the
cylinder meets DOT specifications.
Cylinder labeling:
• Cylinders used to transport propane must have the proper shipping name and hazard class marked on the side of the cylinder.
Properly utilize propane dispensing equipment:
• Review the propane dispensing instructions of all equipment being used, and assure all employees are properly trained and authorized prior to dispensing work.
• Inspect all valves, piping, transfer hoses, and fittings for proper operation.
• Assure tight fittings between the hoses and containers.
• Assure excellent ventilation and that there are no ignition sources.
• Slowly open liquid outlet valve.
• Report any leaks or problems to supervisor.
• When dispensing is complete, close all valves at the storage tank. Place dust cap or plug in the hose end valve or filling adaptor.
• Store filler hose in proper location.
• Close and lock propane storage cabinet or fence gate.
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 15
Flammables—Propane Dispensing
This form documents that the training specified above was presented to the listed participants. By signing below, each participant acknowledges receiving this training. Organization: Trainer: Trainer’s Signature: _____ Class Participants: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date: Name: Signature: Date:
Remember to load your completed trainings into the Risk Management Center.
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 16
Inflamables—Dispensación de propano
Las estaciones de dispensación de propano se encuentran en las plantas industriales, campamentos, tiendas de bricolaje, estaciones de servicio y tiendas de conveniencia. La dispensación adecuada de propano protege la seguridad de los operadores, el público en general y el medio ambiente circundante. Asegúrese del cumplimiento de la normativa aplicable.
Propiedades físicas del propano:
• El propano es un líquido en su estado comprimido dentro del cilindro y se convierte en un gas cuando se libera la presión.
• El propano es incoloro e inodoro, pero un olor, por lo general un olor a huevo podrido, se añade para ayudar en la detección de fugas.
• El propano comprimido es muy frío y si entra en contacto con la piel o los ojos, puede causar quemaduras. Se debe usar el equipo de protección personal adecuado, incluyendo guantes y gafas de protección resistentes a propano, durante el llenado de contenedores.
• El propano no es tóxico, pero si se libera en un espacio confinado, se desplazará el oxígeno. Es más pesado que el aire y se asiente en áreas más bajas si no hay movimiento de aire suficiente. Por lo tanto, siempre asegúrese de la excelente ventilación.
• El propano es sumamente inflamable. Las fuentes de ignición se prohíben dentro de 25 pies del punto de transferencia. Otros materiales combustibles se prohíben dentro de 10 pies del punto de transferencia. Sepa la ubicación de los extintores de incendios y la válvula de apagado de emergencia. Asegúrese de que todos los empleados reciban una capacitación adecuada.
Inspeccione los cilindros antes de rellenar:
• Todos los cilindros se deben fabricar de acuerdo con las especificaciones estándares de la industria y marcados como tal. Se deben marcar todas las especificaciones en la parte superior del cilindro.
• Antes del llenado, se deben revisar los cilindros en busca de grietas, protuberancias, válvulas defectuosas, abolladuras o daños en la válvula del cilindro.
• Asegúrese de que no sean declarados inutilizables o atrasados de la fecha de servicio. Se deben recalificar o reemplazar los cilindros cada 5 a 12 años, dependiendo de su condición y de su método de recalificación anterior.
• Una mancha verdeazulada en la parte de latón del cilindro indica que ha estado en contacto con ambientes corrosivos y no debe ser utilizado.
• Siga todas las instrucciones del proveedor y los recipientes que se utilizan para el llenado de propano. No sobrellene los cilindros.
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 17
Inflamables—Dispensación de propano
El marcado del cilindro mostrará la información de recalificación de 12 años y que el cilindro
cumple con las especificaciones de DOT.
Etiquetado del cilindro:
• Los cilindros que se utilizan para el transporte de propano deben tener el nombre correcto de transporte y el clase de peligro marcados en el lado del cilindro
Utilice correctamente los equipos de dispensación de propano:
• Revise las instrucciones para la dispensación de propano de todo el equipo que se utiliza. Asegúrese de que todos los empleados estén
capacitados y autorizados de manera adecuada antes de realizar las operaciones de dispensación.
• Inspeccione todas las válvulas, tuberías, mangueras de transferencia y accesorios para su funcionamiento correcto.
• Asegúrese de las conexiones ajustadas entre las mangueras y los recipientes.
• Asegúrese de una ventilación excelente y que no haya fuentes de ignición.
• Abra lentamente la válvula de salida de líquido.
• Informe las fugas o problemas al supervisor.
• Al terminar la dispensación, cierre todas las válvulas en el tanque de almacenamiento. Coloque la tapa de polvo o el enchufe en el extremo de la manguera de la válvula o en el adaptador de llenado.
• Almacene la manguera de llenado en el lugar correcto.
• Cierre con llave el gabinete de almacenamiento de propano o la puerta de la valla.
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 18
Inflamables—Dispensación de propano
Este formulario documenta que los participantes mencionados recibieron la capacitación que se detalla más arriba. Al firmar a continuación, cada participante reconoce haber recibido dicha capacitación. Organización: _____ Instructor: Firma del instructor: _____ Participantes de la clase: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: ______ Fecha: Nombre: ______ Firma: Fecha: Nombre: ______ Firma: ______ Fecha:
Recuerde registrar las capacitaciones que ha recibido en el Centro de Gestión de Riesgos.
SAFETY
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 19
www.marinba.org ◆ [email protected] ◆ [email protected]
One night a week for 18 weeks------- Wednesday, 5 p.m. – 9 p.m.
Full Credit ----- 5 units
FREE TO MARIN COUNTY HIGH SCHOOL STUDENTS
$ 65.00 material fee for all non-high school participants
See Your School To Career Center or Contact the ROP office at (415) 491-6639
Introduction to GREEN Building
Sponsored by: Marin County Regional Occupational Program Marin County Office of Education Marin Builders Association National Association of the Remodeling Industry
ROP CONSTRUCTION TECHNOLOGY Redwood High School
Build a Community Project from the Ground Up
STUDENTS WILL LEARN THE FOLLOWING: GREEN BUILDING PRACTICES JOB SITE & TOOL SAFETY FRAMING ELECTRICAL PLUMBING WINDOWS & DOORS ROOFING BLUEPRINT READING BUILDING FROM LOCAL PROFESSIONALS HANDS-ON TRAINING
High School Students can: Earn credits-up to 5 units Qualify for Summer Internship with a Construction Professional Earn the Marin County ROP Work Readiness Certificate
The Marin County Office of Education Regional Occupational Program and School to Career Partnership prohibit discrimination against or harassment on the basis of actual or perceived race, religion, color, national origin, ancestry, age, marital status, pregnancy, physical or mental disability, medical condition, genetic information, veteran status, gender, sex, or sexual orientation in any of its policies, procedures, or practices in compliance with Title VI of the Civil Rights Act, Title VII of the Civil Rights Act, Title IX of the Education Amendments of 1972, Section 504 of the Rehabilitation Act of 1973, the Americans with Disabilities Act, the California Fair Employment and Housing Act, and the Age Discrimination Act of 1975.
“Construction is very interesting. It is fun to build and learn to manage things.” Former ROP Student
“I learned what an employer looks for in hiring an employee.” Former ROP Student
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 20
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
COUNTY OF MARIN PERMITS ISSUED
County of Marin Community Development Agency
Building and Safety Division
PERMITS ISSUED FOR WEEK ENDING SATURDAY, NOVEMBER 8TH, 2014
Owner Contractor Address Parcel # Construction Value Hills Leighton J PETERSEN & SON GENERAL CO 209 Sunset Way Sausalito 199-235-01 (58) Repl Wndws D $30,000 Settlemier Grant A /Tr/An ESCALANTE ROOFING 52 Bayview Ter Mill Valley 043-051-05 (53) Tear-Off, Re $5,000 King James F Tr OWNER 85 Eliseo Dr Greenbrae 070-133-10 (92) Repl 1 Wndw $900 Hussain Iftikhar & BARKLEY BLDRS 170 Nadina Way Greenbrae 070-171-06 (58) Repl 6 Wndws $9,300 Frey Tatiana /Tr/ Etal RENEWAL BY ANDERSEN 7 Quail Way San Anselmo 177-134-30 (58) Replace 8 Wi $23,108 Shen William K F BLAKE SANFORD CONSTRUCTIO 213 Julia Ave Mill Valley 051-151-32 (23, 24) Convert $75,000 San Francisco Zen Cntr SAWYER CONSTRUCTION 1601 Shoreline Hwy Mill Valley 200-020-21 (12) Construct Ne $17,000 Matli David E /Tr/ BRANDON RIEDEL ROOFING 310 Kent Ave Kentfield 074-064-12 (53) Reroof $16,600 Ireson Robert G Tr & JAM CONSTRUCTION 161 Vista Grande Greenbrae 070-141-31 (23) Ba Rmdl $46,665 Harmon Robert L Tr & AAERO HEATING & SHEET MET 607 Goodhill Rd Kentfield 074-131-04 (51) Replace Furn $3,033 Sanda Anika L NORTHERN PACIFIC ROOFING 919 Ventura Way Mill Valley 050-044-14 (53) Tear-Off & R $14,537 Cantor Mitch /Tr/ Etal BUILDERS OF MARIN 9 Walsh Dr Mill Valley 046-330-32 (11) Lower Ret Wa $50,000 Cantor Mitch /Tr/ Etal BUILDERS OF MARIN 9 Walsh Dr Mill Valley 046-330-32 (11) Upper Ret Wa $50,000 Lindberg 2013 Trust Etal HOME DEPOT, THE 24 S Knoll Rd Mill Valley 043-032-16 (58) Repl 7 Wndws $4,139 Giacalone Peter /Tr/ & MODERN METHOD ROOFING CO, 301 Richardson Ct Mill Valley 049-161-32 (53) Reroof $8,500 Howlett Hoyt S & NORTH BAY ROOFING 281 Montego Key Novato 157-260-11 (53) Reroof $18,500 Van Evera Judy Trust RKS ROOFING CONSTRUCTION 511 The Alameda San Anselmo 177-131-06 (53) Re-Roof (Ele $5,740 Marin City Commty Svcs PHOENIX ELECTRIC COMPANY 800 Drake Ave Sausalito 052-113-08 (50, 12) Electric $264,000 Hoyt Craig LUDLAM THOMAS CONST. 37 Issaquah Dock Sausalito 901-050-01 (23,59) Convert M $48,500 Piness George Jr & Edith 2 Strawberry Landing Mill Vall 043-293-02 (11) Replace Bulk $7,000 Roth-Card Ann /Tr/ 409 E Strawberry Dr Mill Valle 043-282-01 (11) Replace Bulk $5,000 Malone Patricia L /Tr/ CASTLE CONSTRUCTION & DES 101 Black Log Rd Kentfield 075-151-49 (23,13,58) Rmdl 2 $35,000 Booth Dennis A /Tr/ MIGUEL VELASQUEZ INC DBA 68 Caribe Isle Novato 157-530-36 (23) Bathroom Rem $29,000 San Francisco Zen Cntr OCCIDENTAL POWER SOLAR & 1601 Shoreline Hwy Mill Valley 200-020-21 (61) Rf Mtd Therm $39,985 Williams Diane AMERICAN SOLAR CORPORATIO 15 Madera Way Mill Valley 045-253-21 (60) Rf Mtd P V S $23,500 Giacomini Waldo & Sons BUCKLEY CONSTRUCTION 116 Mesa Rd Point Reyes Statio 119-121-06 (23) Rmdl Kit $39,000 Rosenberg Kenneth P & DANLIN ENTERPRISES 15 Philip Ter Novato 157-091-45 (63) Add To Groun $16,000 Sosa Antonio & Linnea R BAY MARIN CONSTRUCTION 637 Appleberry Dr San Rafael 164-073-15 (23) Rmdl Kit - E $23,000 Hamblin Basil C & NOVATO GLASS, INC. 11150 State Route 1 Point Reye 119-225-05 (58) Repl 12 Wndw $30,650 Jefferson David W HOLLAND THOMAS 269 Cleveland Ave Mill Valley 051-251-30 (13) Repair Dry R $18,000 Walker Doug & Elizabeth OWNER 201 S Ridgewood Rd Kentfield 075-084-01 (23) Master Bathr $25,000 Goldsborough Robert 2007 OWNER 136 Reed Blvd Mill Valley 043-131-14 (23,58) Rmdl & Re $45,000 Brenman Aana, Law John A1 SOLAR POWER 130 Whittier Ave San Rafael 180-354-12 (60) 6.05kw Roof $27,225 Rodny Uri & SMP CONSTRUCTION & MAINTE 46 Laverne Ave Mill Valley 048-061-36 (93) Voluntary Fo $8,000 Mc Caskey Charles, Allen 136 Hillcrest Ln Kentfield 075-131-34 (53) Re-Roof $18,500 Sonett Jonathan /Tr/ & SUN FIRST CONST 271 Fawn Dr San Anselmo 177-031-06 (60)Photovotaic - $23,000 Bulger Robin M ABLE ROOFING COMPANY 119 Tiburon Blvd Mill Valley 034-142-50 (53) Reroof $17,000 Scott Brook M /Tr/ ONGARO, ERNEST & SONS, IN 25 Circle Rd San Rafael 179-201-02 (52) Install 50 G $2,601 Kaehler Allan & ADVANCED HOME ENERGY 109 Vendola Dr San Rafael 180-011-24 (92) Insulation $9,000 Foreman Ronald OWNER 8 Washington Ave San Rafael 179-173-16 (50,58) Move Subp $7,000 Nickels Douglas F & ABRIL ROOFING CO 46 Oak Mountain Ct San Rafael 164-381-11 (53) Reroof $16,000 Schmidt Nathaniel R & MAC'S ROOFING 242 Flamingo Rd Mill Valley 052-041-19 (53) Reroof $8,300 Hatch Joshua /Tr/ & Etal SOLARCITY CORPORATION 11 Altamira Ave Kentfield 071-122-10 (60) Rf Mtd P V S $13,700 Marin City Commty Svcs ROBERT A BOTHMAN INC 800 Drake Ave Sausalito 052-113-08 (92) Ada Complian $20,000 Postier Louisa W /Tr/ Et GRAVESON CONSTRUCTION 10 Laurel View Way Inverness 112-254-04 (21,13) Subtract $85,000 Tupper Stacey HENDRICKSON POOLS, INC. 25 Manor Rd Greenbrae 071-201-17 (93) Pool Demo $6,000 Jaquez-Fissori Family Tru J D BUILDING 15 Dutch Valley Ln San Anselmo 176-131-01 (23,22,13,51,58,5 $165,000 Walsh Joseph F /Tr/ & Eta OLD TOWN GLASS, INC 218 Lagunitas Rd Lagunitas 170-102-21 (58) Windows $1,774 Norton Kieran S KELLY PLUMBING AND HEATIN 515 Quietwood Dr San Rafael 164-104-09 (514) Replace Fur $3,000
Total Number Permits: 49 Total Value $1,457,757
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 21
COUNTY OF MARIN PERMITS RECEIVED
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
County of Marin Community Development Agency
Building and Safety Division
Building Permit Applications Received for Processing Week Ending: Saturday, November 8th, 2014
Address Owner Work Value 45 Oceana Dr Dillon Beach Cochrane Jessie E (12,50) Rebuild Bridge; Upgr E $8,000 180 Summit Ave San Rafael Boydstun Rebecca & Van Der Werff G (23, 24, 21, 13) Remodel, Addi $120,000 364 N Ferndale Ave Mill Valley Shelton Matthew A & (11,13) Driveway Ret Wall; Dec $80,000 284 Morning Sun Ave Mill Valley Corso David Family Trust (22,59,50) Struct Rmdl & Reloc $45,000 162 Wild Horse Valley Dr Novato House Properties 77 Iii Lp (13) Repl Car Deck And Repair $12,500 271 Loring Av (Tentative Address) Mill V Mcdonald Brooks (20--1/3,20--1/1,12,13,11) New $500,000 162 Wild Horse Valley Dr Novato House Properties 77 Iii Lp (13,93) Repl Pool Deck And Rep $37,000 16 Egret Way Mill Valley Belfort Management Inc (62) Demolition Of Interior Wa $10,000 30 Berens Dr Kentfield Price Marla R (22, 50, 59) Entire Interior R $250,000 360 Belvedere Ave Stinson Beach Grady Kent H & Tory (93) Restructure Roof Over Nor $18,000 200 Auburn St San Rafael Saltzman Jacob E (13) Add New Deck Under Existi $4,000 68 Caribe Isle Novato Booth Dennis A /Tr/ (23) Bathroom Remodel - Expres $29,000 1601 Shoreline Hwy Mill Valley San Francisco Zen Cntr (61) Rf Mtd Thermal System - E $39,985 637 Appleberry Dr San Rafael Sosa M Antonio & Linnea R (23) Rmdl Kit - Express $23,000 201 S Ridgewood Rd Kentfield Walker Doug & Elizabeth (23) Master Bathroom Remodel - $25,000 136 Reed Blvd Mill Valley Goldsborough Robert 2007 Surv Trust (23,58) Rmdl & Reconfigure Kit $45,000 130 Whittier Ave San Rafael Brenman Aana R & Law John W (60) 6.05kw Roof Mounted Phot $27,225 271 Fawn Dr San Anselmo Sonett Jonathan /Tr/ & (60)Photovotaic -Express $23,000 46 Oak Mountain Ct San Rafael Nickels Douglas F & (53) Reroof $16,000 25 Manor Rd Greenbrae Tupper Stacey (93) Pool Demo $6,000
Total Value $1,318,710
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 22
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date
Owner Contractor Site Address Type Valuation
Corte Madera
10/29 Browne Patrick J & James Martinez 530 Manzanita Ave Bathroom Remodel $11,000
Corte Madera
10/30 Kelley Stephen W Brandon Riedel Roofing 162 Mariner Green Ct Reroof $11,144
Corte Madera
10/30 Farrell Robert & Brandon Riedel Roofing 152 Mariner Green Ct Reroof $11,144
Corte Madera
10/30 Marin Hotels Llc Pars Power Inc 749 Tamalpais Dr Repair $15,000
Corte Madera
10/31 Kuchinski Martin J Ahh Construction 74 Sandpiper Cir Remodel $21,000
Corte Madera
10/31 Dall Era Maria C & James Martinez 34 Morning Star Course Kitchen Remodel $23,500
Corte Madera
10/31 Fields Kathryn Goltermann Construction Inc
30 Chickasaw Ct Remodel 2 Bathrooms
$30,000
Corte Madera
10/31 Fields Kathryn Goltermann Construction Inc
30 Chickasaw Ct Addition $150,000
Novato 11/4 Shlez Mark Bbc Constructions Aka Built Be
25 Manchester Ct Construction $20,000
Novato 11/4 Long Andrew Henris Roofing Co 9,11,13,15 Clay Ct Reroof $21,500 Novato 11/4 Gonzalez Saul &
Gonzalez EsperOwner-Builder 31 Balra Dr Minor Construction $25,000
Novato 11/4 Phillips Greg B & Phillips Ell
Endvr Corp 12 Andreas Cir Minor Construction $25,000
Novato 11/4 Novato Development Llc Tim Grogan Builders Inc. 11 Zandra Pl New Sfd $450,000 Novato 11/4 Novato Development Llc Tim Grogan Builders Inc. 9 Zandra Pl New Sfd $450,000 Novato 11/5 Kennedy James M Tr &
Kennedy SHenry Mechanical 16 Carnoustie Dr Furnace Hvac Ol $11,009
Novato 11/5 Hall Andrew T & C Roofing Inc. 14 Knolltop Ct Reroof $12,200 Novato 11/5 Wasserman Harold I &
WassermanLic.Contract.Hired By Owner
437 Wood Hollow Dr Construction $14,000
Novato 11/5 Battaglia Donald F /Tr & Batta
Arruda Construction, Inc. 1223 Highland Dr Minor Construction $15,000
Novato 11/5 Roberts Brenda J Owner-Builder 2038 Shady Ln Construction $22,170 Novato 11/5 Mace Justin P Thurm
Karin CBarkley Builders 780 Arlington Cir Window $23,000
Novato 11/6 Fernandez Alfredo G & Escobar
Owner-Builder 2044 Shady Ln Construction $10,000
Novato 11/6 Dickow James H & Dickow Agnes
Northern Pacific Power Systems
4 Avocet Ct Solar $12,000
Novato 11/6 Petrini Revoc Trust Of 2014 Et
Owner-Builder 760 Tamalpais Ave Reroof $16,000
Novato 11/6 Lee Jim N /Tr/ Walter Sutton Construction 53 Plata Ct Minor Construction $19,000 Novato 11/6 Witter Lawrence S Tr &
WitterSignature Painting & Construct
75 Fairway Dr Construction $60,000
Novato 11/6 Western Oaks Village Assoc
Cidology Inc. 1200 Redwood Blvd [Pool/Club House]
Construction $489,300
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 23
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date
Owner Contractor Site Address Type Valuation
Novato 11/7 Wells Thomas F / Eleanor B
Advanced Home Energy Inc 17 Goldfinch Ct HVAC $15,000
Novato 11/7 Fiedel Howard Etal Capital Tower & Communications
2 Madrone Ave Electrical $20,000
Novato 11/7 Crown Castle Int. C B A Site Services Inc 5480 Nave Dr Electrical $25,000 Novato 11/7 Sam Jarjoura Bay Builders Inc. 1139 Rosalia Dr Construction $68,000 San Rafael 10/29 Vyas Bhavik & Michael J. Rieser 24 Fremont Rd Alter-Sfd $10,000 San Rafael 10/29 Black James R /Tr/ & Larke Construction 5 Bracken Ct Alter-Sfd $15,000 San Rafael 10/29 Marta Mcclure Steve P Deetken 820 Mission Ave 6 Alter-Condo $20,000 San Rafael 10/29 Paratte Roland C & Edmisten Construction 211 Oleander Dr Alter-Sfd $33,000 San Rafael 10/29 Southern Marin Properties
Llc75Southern Marin Properties Llc75
75 Oakdale Ave Alter-Sfd $45,000
San Rafael 10/29 Schmitt Raymond K Tr Schalich Brothers Co 42 Maple Hill Dr Alter-Sfd $300,000 San Rafael 10/30 Cercos Patricia D Livi Charles Window & Door 46 Forest Ln Alter-Sfd $11,000 San Rafael 10/30 Strebl Mary L /Tr/ Strebl Mary L /Tr/ 344 Woodland Ave Alter-Duplex $13,500 San Rafael 10/30 Pearson Russell & Charles Window & Door 20 Marin Bay Park Ct Alter-Sfd $29,000 San Rafael 10/30 Ballard Nicholas Wcs Construction 62 C St Alter-Sfd $98,000 San Rafael 10/31 Owen Lawson W & Gary W Giesen Genera 34 Twin Oaks Ave Alter-Sfd $15,000 San Rafael 10/31 Randazzo John A & Golden Bay Contractors 175 Knollwood Dr Alter-Condo $16,000 San Rafael 10/31 Evarts Genevieve E /Tr1/ Torsen Construction 111 Rollingwood Dr Alter-Sfd $23,000 San Rafael 11/1 Eberhard Laura W & Payesko Construction Inc 526 Biscayne Dr Alter-Sfd $38,450 San Rafael 11/4 Raenge/Brown Liv Tru Renewal By Andersen 46 Bedford Cv Alter-Sfd $10,000 San Rafael 11/4 Paoli Monica R Revoc Abril Roofing 749 Bamboo Ter Alter-Sfd $11,950 San Rafael 11/4 Shea Elana M F & Abril Roofing 8 Galleon Way Alter-Sfd $17,000 San Rafael 11/4 Professional Invrs Se A.S.M.P Roofing Co 1825 Lincoln Ave Alter-Apartments $38,500 San Rafael 11/4 California Corporate Dpr Construction 788 Lincoln Ave Alter-Commercial
$1,000,000 San Rafael 11/5 La Terra Marin County Roofing 655 Irwin St A Alter-Commercial $50,000 Tiburon 11/4 Geoffrey W Bylor Renewal By Andersen 47 Southridge West Replace Windows $13,164 Tiburon 11/4 Stephen Bent Sun First, Inc. 100 Hacienda Drive Solar $45,000 Tiburon 11/6 Elizabeth Gassel Solarcity Corporation 4505 Paradise Drive Solar $10,000 Tiburon 11/6 Suzanne Kim Northern Pacific Power
Systems20 Mateo Drive Solar $16,000
Tiburon 11/6 Kathy & Miles Kilburn Robert Curry Construction 1754 Lagoon View Drive Remodel $30,000 Tiburon 11/7 Alexandra Jenkins Sunrun Installation Services 25 Rancho Drive Solar $28,000 Tiburon 11/7 Andre V & Casey R Mancl Redican Homes 693 Hawthorne Drive Demo & Construct
New $650,000
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 24
ReadyMarin.orgTraining and education to keep you and your family safe,
warm, and fed in the event of a disaster
In the event of an emergency, our first responders will be overwhelmed. It is critical for citizens to be prepared to take care of themselves, their neighbors, and their community for at least 3 days, and preferably 5-7.
ReadyMarin.org is Marin County’s website for information on emergency preparedness, whether you are just learning or an experienced emergency volunteer. Our mission is to provide guidance, training and resources to keep you and your family safe during an emergency, whether it requires you to evacuate or shelter in place. You will find information and links to resources, checklists, and training opportunities. Let’s get prepared.
Plan & Prepare
Learn what supplies you should store at home, work, and in your car to take care of yourself and your family for 5-7 days. Download our checklists and get started.
ReadyPets
Your pets depend on you to be prepared to help them in an emergency. Whether you are staying in your home or leaving, a little planning will go a long way.
ReadyKids
Tips for preparing you and your children in a disaster. Kits, games, contact information cards. We have the resources you need.
Get Ready Training
Get Ready is a county-sponsored 2-hour training, facilitated by our local Fire Departments and community volunteers, that will provide you with an overview of how to prepare your family and home.
Community Emergency Response Team (CERT)
For those of you who wish to step beyond preparing your home and reach out to help your community in an emergency, train to be a Community Emergency Response Team (CERT) member.
Resources
We have listed great resources and links to help you prepare to whatever level you wish.
This project is supported by US Department of Homeland Security (DHS) FY2011 Homeland Security Grant #97-067 awarded by the State of California Office of Homeland Security (Cal OES). The opinions, findings, and conclusions or recommendations expressed in this publication are those of the authors and do not necessarily reflect the views of DHS.
www.readymarin.org
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 25
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 26
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 27
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/6/2014 02:00 PM Update Fire Alarm System at Alameda City Hall
Alameda ONLINE Alameda, City of 510-747-7900 510-747-4805
11/6/2014 02:00 PM Hawkeye Avenue Rehabilitation
Turlock ONLINE Turlock, City of 209-668-5599
11/6/2014 01:30 PM Replacement of Tennis Courts at Mt. Eden Park
Hayward ONLINE Hayward Area Recreation & Park District
510-881-6715 510-888-5756
11/6/2014 02:00 PM Replacement of Embarcadero Bridge Over Lake Merritt Channel-Rebid
Oakland ONLINE Oakland, City of 510-238-7395
11/6/2014 03:00 PM RFQ-Phase 1A and Phase 2 Temporary Shoring and Tieback Package for Moscone Convention Center Facilities Expansion
San Francisco ONLINE San Francisco, City & County of
415-554-6229
11/6/2014 7:00 AM Solar Powered School Zone Safety Systems Revised Requirements
Martinez ONLINE Contra Costa, County of
925-313-2000 925-313-2333
11/6/2014 02:00 PM Blue Rock Springs Golf Course-Cart Barn Project
Vallejo ONLINE Vallejo, City of 707-648-4315
11/6/2014 01:30 PM Inspection, Maintenance and Repair Services for Automatic Sliding/Swinging Doors at DMV Headquarters Complex
Sacramento ONLINE Department of Motor Vehicles
916-657-8345 916-657-2367
11/6/2014 02:00 PM 55 Inch LCD Flat Monitor Signage for Oakland Airport Operations Center
Oakland ONLINE Port Of Oakland 510-627-1526
11/6/2014 02:00 PM Pre-Construction Tree Removal, Floodwall Improvements along Line D Phase 2 Between Huntwood and Bart
Hayward E341B/001C Alameda, County of 510-670-5450
11/6/2014 02:00 PM Foothill College Modernization Project 121-Library and Learning Center Renovation (Lease-Leaseback Project)
Los Altos Hills ONLINE
11/6/2014 02:00 PM Job Order Contract 52, Electrical (C-10 License), San Francisco, Peninsula and East Bay
San Francisco ONLINE San Francisco, City & County of
415-551-4603
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 28
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/6/2014 02:00 PM Regional Specialty Job Order Contract Roofing, Paving, Painting
Various Cities ONLINE California State University
562-951-4116
11/6/2014 02:00 PM Lobby and Staff Lounge Remodel
Roseville ONLINE Northern California Power Agency
916-781-3636 916-783-7693
11/6/2014 02:00 PM Fresno Optic Network Expansion, Fresno City College
Fresno ONLINE State Center Community College Dist
559-244-5943
11/6/2014 02:15 PM Minor B - Repair Existing Pavement Delineation
San Joaquin County
ONLINE Department Of Transportation
916-227-6491 916-227-6007
11/6/2014 02:00 PM CIPP Corrosion Rehabilitation Project
Los Altos ONLINE Los Altos, City of 650-947-2700
11/6/2014 02:00 PM The Rehabilitation of Sanitary Sewers at Lakeside Park Pump Station
Oakland ONLINE Oakland, City of 510-238-7395
11/6/2014 03:00 PM 7458-Police Administration and Communication Buildings (PAB/C) Chiller Replacements Project
San Jose ONLINE San Jose, City Of 408-535-8300
11/6/2014 03:00 PM 7405-Public Works General Engineering Contract for Sewer Repairs 2013-2015 (Contract III)
San Jose ONLINE San Jose, City Of 408-535-8300
11/6/2014 02:00 PM Pump Station Alarm Installation and Monitoring
Stockton ONLINE Stockton, City of 209-937-8753 209-937-8750
11/6/2014 02:00 PM Exterior Improvements at Stanislaus Consolidated Fire Station #31
Modesto ONLINE Timothy P. Huff & Associates, Inc
209-571-2232 209-571-1936
11/6/2014 02:00 PM Hyde Middle School Interim Housing Portables
Cupertino ONLINE Cupertino Union School District
408-252-3000
11/6/2014 03:00 PM 7753-On-Call CCTV Inspection FY 2014-2016
San Jose ONLINE San Jose, City Of 408-535-8300
11/6/2014 02:00 PM HVAC Replacement and Air Balancing Project for Placerville DMV Office-Rebid
Placerville ONLINE Department of Motor Vehicles
916-657-8345 916-657-2367
11/6/2014 01:30 PM Sludge Thickening System Replacement
San Rafael ONLINE Central Marin Sanitation Agency
415-459-1455
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 29
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/6/2014 02:00 PM Village Park Restroom Replacement 2014-2015
Burlingame ONLINE Burlingame, City of 650-558-7300
11/6/2014 02:00 PM McKinley Park Shade Structure Improvements
Sacramento ONLINE Sacramento, city of 916-808-8529 916-808-8266
11/6/2014 02:00 PM The Rehabilitation of Sanitary Sewers in the area bounded by Park Boulevard, Hollywood Avenue, Sunnyhills Road, and Brighton Avenue
Oakland ONLINE Oakland, City of 510-238-7395
11/6/2014 02:30 PM Geer Road Rehabilitation
Turlock ONLINE Turlock, City of 209-668-5599
11/7/2014 10:00 AM Concord Avenue Retail Project
Concord Online
11/7/2014 02:00 PM Traffic Counting Services for Signal Re-Timing in the Downtown
Modesto ONLINE Modesto, City of 209-577-5462
11/7/2014 02:00 PM Design Build Services for New Boarding Area B Reconstruction Project and Terminal 1 Center Renovation Project
San Francisco ONLINE San Francisco International Airport
650-821-5540
11/7/2014 02:00 PM 2015 Prequalification for SFUSD Projects Eligible for State Funding
San Francisco ONLINE San Francisco Unified School District
415-241-4309
11/7/2014 02:00 PM Demolition of Partially Built Single Family Residence
Stockton ONLINE San Joaquin, County of
209-468-3240 209-468-3393
11/7/2014 05:00 PM RFP-Parking Garage Management at 1650 Mission Street
San Francisco ONLINE San Francisco, City & County of
415-554-6229
11/7/2014 04:00 PM RFP-Design Engineering Consultant Services for Charcot Ave Extension over I-880
San Jose ONLINE San Jose, City Of 408-975-7398 408-292-6296
11/7/2014 02:00 PM Elkhorn Slough Water System Maintenance
Watsonville ONLINE Department of Fish & Game
916-323-1548
11/7/2014 10:00 AM State of Good Repair Bus Stop Improvements
Mill Valley/Ross, San Rafael/Novato
ONLINE
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 30
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/7/2014 05:00 PM Winston Churchill New 21st Century Classroom Bldgs Contractor Prequalification Requirements
Carmichael ONLINE San Juan Unified School District
916-971-7283 916-979-8886
11/10/2014 12:00 PM Nelson Retail Shell Building-Fairfield
Fairfield ONLINE
11/10/2014 02:00 PM Farm Bureau Road Safe Routes to School Project
Concord ONLINE Concord, City of 925-671-3448 925-680-1660
11/10/2014 02:00 PM University Park-North Garden Apartment Building #1,3,4,5&10 Asbestos Aba - CANCELLED
San Francisco Pending San Francisco State University
415-338-1698 415-338-2960
11/10/2014 02:00 PM Wing Stop-San Jose San Jose ONLINE 11/10/2014 10:00 AM Landscape, Parks
and Channelways Maintenance
Tracy ONLINE Tracy, City of 209-831-6400 209-831-4430
11/10/2014 02:00 PM Roof Replacement Project Greenhouse Offices and Storage Facility
Sacramento ONLINE Dept of Food & Agriculture CA
916-403-6521
11/10/2014 011:30 PM
2014 Pavement Maintenance Project
Cotati E343B Cotati, City of 707-665-3637
11/10/2014 02:00 PM Johnston Low Lift Pump Station
Sacramento ONLINE Sacramento, City Of 916-808-1437 916-808-1497
11/10/2014 12:00 PM RFQ Cleaning and Maintenance of Webster Street, Park Street and Marina Village
Alameda ONLINE Alameda, City of 510-747-7930 510-769-6030
11/10/2014 03:00 PM Retrofit Access Control and Instrusion Systems
Sacramento ONLINE Sacramento, County of
916-874-6544
11/10/2014 02:00 PM Fire Station 23 Interior Remodel - Phase 2
San Mateo ONLINE San Mateo, City of 650-522-7300 650-522-7301
11/11/2014 12:00 PM ARCO AM/PM - Anderson
Anderson ONLINE
11/11/2014 01:00 PM Landscaping and Engineering Services (3 Years)
Sacramento ONLINE Sacramento Municipal Utility District
888-742-7683
11/11/2014 10:00 AM Magnolia Place Senior Apartments
Greenfield ONLINE
11/11/2014 02:00 PM Non-Potable Water System Phase III
Patterson ONLINE Patterson, City of 209-895-8066
11/11/2014 03:00 PM RFP-Parking Wayfinding
Palo Alto ONLINE Palo Alto, City of 650-329-2271 650-329-2299
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 31
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/11/2014 01:00 PM Preston Park Window and Door Replacement
Marina ONLINE Fort Ord Reuse Authority
831-883-3672
11/12/2014 01:30 PM Eden Reservoir Replacement and Round Hill Reservoir Rehabilitation
Castro Valley/Alamo
002C/B668 East Bay Municipal Utility District
510-287-1040 510-287-0000
11/12/2014 02:30 PM Ocean Avenue and Persia Avenue Pavement Renovation and Sewer Replacement
San Francisco ONLINE San Francisco, City & County of
415-554-6229
11/12/2014 01:30 PM RFQ-Stockton Field Operations Center Fuel Dispenser Replacement
Stockton ONLINE East Bay Municipal Utility District
510-287-1040 510-287-0000
11/12/2014 03:00 PM Fire Station Roll Up Door Replacement
Sunnyvale ONLINE Sunnyvale, City of 408-730-7380 408-737-4950
11/12/2014 11:00 AM RFP-Engineering Design Services for Oceanside Plant
San Francisco ONLINE San Francisco, City & County of
415-551-4603
11/12/2014 01:30 PM Gate Install at Corp Yard
Ukiah ONLINE Ukiah, City Of 707-463-6234 707-463-6234
11/12/2014 02:00 PM Fire Alarm and Fire Pump Testing
Napa ONLINE Dept of State Hospitals-Napa
707-254-2435
11/12/2014 12:00 PM Wal-Mart #1608 Supercenter - Red Bluff
Red Bluff Online
11/12/2014 11:00 AM Renovation of 3824 West St., Oakland
Oakland ONLINE Oakland, City of 510-238-7395
11/12/2014 02:30 PM Pavement Renovation and Sewer Replacement Cresent and Husdon Avenues
San Francisco ONLINE San Francisco, City & County of
415-554-6229
11/12/2014 01:30 PM RFQ-Bixler Maintenance Center Fuel Dispenser Replacement Project
Brentwood ONLINE East Bay Municipal Utility District
510-287-1040 510-287-0000
11/12/2014 03:00 PM BNSF/Port of Stockton Navy Drive BNSF Underpass Project
Stockton ONLINE Port of Stockton 209-946-0246
11/12/2014 05:00 PM Pleasanton Dealership Chrysler Dodge Jeep
Pleasanton ONLINE
11/12/2014 01:30 PM RFQ-Pardee Center Fuel Dispenser Replacement
Valley Springs ONLINE East Bay Municipal Utility District
510-287-1040 510-287-0000
11/12/2014 02:00 PM On-Call Utility Potholing at Various Locations
Alameda County
E839B/067C Alameda, County of 510-670-5450
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 32
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/12/2014 05:00 PM Maximize Chiropractic West Sacramento
ONLINE
11/12/2014 04:00 PM Parcade TI General Contractor Prqualification
Merced ONLINE Merced, UC 209-228-4400
11/12/2014 02:30 PM RFB-14-15-36 Recreation Park Stadium Lighting Project, Phase 2
Visalia Online Visalia, City Of 559-713-4334
11/12/2014 03:00 PM Victoria Lift Station Upgrades
Petaluma ONLINE Petaluma, City of 707-778-4546 707-778-4508
11/12/2014 02:00 PM Santa Rita Jail Asphalt Re-Paving Service Road
Dublin ONLINE Alameda, County of 510-208-9700 510-208-9711
11/12/2014 04:00 PM Rush Creek Lodge, Reception/Retail Building and Hotel
Cloverdale ONLINE
11/12/2014 04:00 PM RFP for Phase 1-El Camino Real Safety and Lane Reduction Traffic Study
Atherton ONLINE Atherton, Town Of 650-752-0500 650-688-6528
11/12/2014 02:00 PM Joseph Gallo Park Improvements
Livingston ONLINE
11/12/2014 02:00 PM Santa Rita Jail Water Tank Paint Job
Dublin ONLINE Alameda, County of 510-208-9700 510-208-9711
11/12/2014 02:00 PM Moving and Storage Services San Francisco Unified School District
San Francisco ONLINE San Francisco Unified School District
415-241-6468
11/12/2014 2:00 AM Miscellaneous Upgrades Project
Sausalito ONLINE Sausalito-Marin City Sanitary District
415-332-0244
11/12/2014 02:00 PM New 2014 Godwin 4” and 6” Pumps Modifications
San Jose ONLINE San Jose, City of 408-535-7046
11/12/2014 03:00 PM RFP for El Camino Park Restoration Project
Palo Alto ONLINE Palo Alto, City of 650-329-2271 650-329-2299
11/12/2014 12:00 PM Boneheads Grill Fremont ONLINE 11/12/2014 01:00 PM Cable Plant and
Hardware, Conduit Pathway and Network Electronics at Four of the District’s School Campuses
Capitola ONLINE Madi Group, Inc 800-725-0571 800-725-0571
11/12/2014 03:00 PM Smithwick Theater Hardware Improvements-Foothill College
Los Altos ONLINE Foothill-De Anza Community College District
650-949-6900
11/12/2014 02:00 PM Milpitas High School Temporary Locker Portables
Milpitas ONLINE Kitchell 408-280-7889
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 33
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/13/2014 02:00 PM Regional Treatment Plant Fueling System Upgrade and Underground Storage Tank Facility Removal
Marina ONLINE Monterey Regional Water Pollution Control
831-883-6179 831-883-0516
11/13/2014 03:00 PM JOC Roads & Bridges (2014)
Salinas Online Monterey, County of 831-755-4748 831-755-4958
11/13/2014 02:00 PM Sportsman’s Warehouse Fresno
Fresno ONLINE
11/13/2014 05:00 PM RFQ for On-Call Planning Services
Antioch ONLINE Antioch, City of 925-779-7050 925-779-7062
11/13/2014 02:00 PM Job Order Contract 53, Electrical (C-10 License), San Francisco, Peninsula and East Bay
San Francisco ONLINE San Francisco, City & County of
415-551-4603
11/13/2014 02:00 PM Construct Communications Towers & Vaults
Colby Mountain ONLINE Department of General Services
916-376-1673 916-376-1741
11/13/2014 02:30 PM Waste Removal Services for the Carmichael DMV Field Office
Carmichael ONLINE Department of Motor Vehicles
916-657-8345 916-657-2367
11/13/2014 02:00 PM Building 575 RDM Office Remodel
San Francisco ONLINE San Francisco International Airport
650-821-5540
11/13/2014 01:00 PM Extension of Westlake Warehouse
Daly City ONLINE Daly City, City Of 650-991-8064 650-991-8243
11/13/2014 02:00 PM Public Safety Facility-Door Replacement
Turlock ONLINE Turlock, City of 209-668-5599
11/13/2014 02:00 PM Natividad Medical Center JOC 2014
Salinas Online Monterey, County of 831-755-4748 831-755-4958
11/13/2014 02:00 PM HVAC Infrastructure Renovation @ Cosumnes River College
Sacramento ONLINE Los Rios Community College District
916-568-3077 916-856-3456
11/13/2014 02:00 PM CRC HVAC Infrastructure Renovation
Sacramento Online Los Rios Community College District
916-568-3077 916-856-3456
11/13/2014 02:30 PM Asbestos Abatement for DMV Headquarters.
Sacramento Online Department of Motor Vehicles
916-657-8345 916-657-2367
11/13/2014 03:00 PM Hot Applied Asphalt Crack Sealant
Solano County ONLINE Solano, County Of 707-784-6320
11/13/2014 02:00 PM Replace Drinking Water Fountains Public Utilities Commission Building 418
San Francisco ONLINE Department of General Services
916-376-1731
11/13/2014 02:00 PM Terra Linda Pool House Renovation Project
San Rafael 021C/R005 San Rafael, city of 415-485-3355 415-485-3334
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 34
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/13/2014 02:00 PM RFP for Golf Club Road/Old Quarry Road Improvement Project Design Services
Pleasant Hill ONLINE Pleasant Hill, City of 925-671-5265 925-671-5260
11/13/2014 02:00 PM Theater Screen Replacement at the California State Railroad Museum
Sacramento ONLINE Department of Parks & Recreation
916-327-8870
11/13/2014 02:00 PM Operations Equipment and Storage Facilities
Antioch ONLINE Delta Diablo Sanitation District
925-756-1976
11/13/2014 02:00 PM TG08.3-Skylights San Francisco ONLINE 11/13/2014 02:00 PM Villa Annex Restroom
Upgrade Healdsburg ONLINE Healdsburg, City Of 707-431-3346
11/13/2014 03:00 PM Lot Street Light System Repairs and Installation
Mountain View ONLINE Mountain View, city of
650-903-6311 650-962-8503
11/13/2014 02:00 PM Zarah at Roseville Galleria
Roseville ONLINE
11/13/2014 02:00 PM Access Barrier Removal Only - Automatic Door Opener & Push Plates
Sacramento ONLINE Department of General Services
916-927-7010
11/13/2014 02:30 PM Public Safety Facility-Miscellaneous Site Improvements
Turlock ONLINE Turlock, City of 209-668-5599
11/13/2014 02:00 PM Fairground Parking Lot B Repaving Project
Dixon Pending Dixon May Fair Admin Office
916-263-6155
11/13/2014 11:00 AM Northern Plume Monitoring Well Installation Project
Lodi ONLINE Lodi, City of 209-333-6706 209-333-6710
11/13/2014 02:30 PM Memorial Park Water Treatment Improvement Project
San Mateo County
ONLINE San Mateo, County of
650-363-4100 650-361-8220
11/13/2014 04:00 PM Mold and Asbestos Remediation Services
Richmond Online Onl Richmond, City of 510-231-3011 510-231-3013
11/13/2014 02:00 PM Pizza Hut-Brentwood Brentwood ONLINE 11/13/2014 02:00 PM West Field Garage
Modifications San Francisco ONLINE San Francisco
International Airport 650-821-5540
11/13/2014 02:00 PM Janitorial Services for the Los Gatos DMV Field Office
Los Gatos ONLINE Department of Motor Vehicles
916-657-8345 916-657-2367
11/13/2014 02:00 PM CHP Academy Water Conservation Landscaping Services
West Sacramento
ONLINE Department of California Highway Patrol
916-843-3800
11/13/2014 05:00 PM Yarrow Village Affordable Senior Housing
Fortuna ONLINE
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 35
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/14/2014 02:00 PM Avaya Telecom Switch Maintenance
Sacramento ONLINE California State University Sacramento
916-278-7322 916-278-5796
11/14/2014 05:00 PM Oro Loma Project Mountain View ONLINE 11/14/2014 02:00 PM RFQ for
Environmental Consulting Services Pajaro Valley Unified School District
Watsonville ONLINE Pajaro Valley Unified School District
831-786-2100
11/14/2014 02:00 PM Richmond Parkway Interconnect Wire and Pullbox Replacement
Richmond ONLINE Richmond, City of 510-231-3011 510-231-3013
11/14/2014 10:15 AM Relocation and Modification of Modular Building Corporation Yard
Palo Alto ONLINE Palo Alto Unified School District
650-329-3927 650-327-3588
11/14/2014 02:00 PM RFQ for Phase 1-Staff Facilities Locker Room
Carmel ONLINE Carmel Area Water District
831-624-1248
11/14/2014 03:00 PM Commons at Folsom - Assisted Living Facility (No GC Openings)
Folsom ONLINE
11/14/2014 10:00 AM Corporation Yard Fire Alarm Replacement
Palo Alto Pending Palo Alto Unified School District
650-329-3927 650-327-3588
11/14/2014 03:00 PM RFP-Prefabricated Modular Data Center
Sacramento ONLINE Sacramento, County of
916-874-6544
11/17/2014 03:00 PM Ocean Avenue Campus Cafeteria Security Gate Replacement
San Francisco ONLINE City College of San Francisco
415-239-3495 415-239-3947
11/17/2014 04:00 PM Consolidated Plan Consulting Services
Richmond ONLINE Richmond, City of 510-231-3011 510-231-3013
11/17/2014 02:00 PM Annual Concrete Repair
Los Altos ONLINE Los Altos, City of 650-947-2780 650-941-7419
11/17/2014 02:00 PM Social Security Administration Interior Modifications
Richmond ONLINE RGM and Associates
925-671-7717 925-671-7788
11/17/2014 03:00 PM RFP-State Route 84 Widening from Pigeon Pass ro Interstate 680 Project Approval and Environmental Documents (PA&ED) Phase
Fremont ONLINE Alameda County Transportation Commission
510-208-7400 510-836-2185
11/17/2014 02:00 PM SFO-Design Build Services for Long Term Parking Garage No. 2 Project
San Francisco ONLINE San Francisco International Airport
650-821-5540
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 36
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/17/2014 04:00 PM Auburn Boulevard at Arcade Creek Bridge Replacement Project
Sacramento ONLINE Sacramento, city of 916-808-2266 916-393-3725
11/17/2014 12:00 PM Champs - Stockton Stockton ONLINE Sierra Contracting 760-745-8769 760-745-5121 11/17/2014 02:00 PM 3300 Regatta Build
Out for Museums Richmond ONLINE Berkeley, UC 510-642-6273 510-642-7271
11/17/2014 03:00 PM RFP for Architectural Services to Modest City Schools
Modesto ONLINE Modesto City Schools
209-576-4090
11/18/2014 02:00 PM I-680 Auxiliary Lanes, Segment 2, Landscape Project
San Ramon & Danville
E344B/071C Contra Costa Transportation Authority
925-256-4700 925-256-4701
11/18/2014 02:00 PM Wastewater Treatment Facility Digester # 4 Cleaning
Santa Cruz Online Onl Santa Cruz, City of 831-420-5160
11/18/2014 03:00 PM RFP for Landscape Maintenance
Richmond ONLINE Richmond Housing Authority
510-307-8017
11/18/2014 05:00 PM Union Valley Generator Rehabilitation Project
El Dorado County
ONLINE Sacramento Municipal Utility District
888-742-7683
11/18/2014 02:00 PM Warm Springs Extension Wetland Mitigation Site
Fremont ONLINE Bay Area Rapid Transit District
510-464-6383
11/18/2014 02:00 PM Wastewater Treatment Plant Dry Solids Storage Building
Merced ONLINE Merced, City Of 209-385-6211
11/18/2014 02:00 PM Monte Vista High School Increment 1 Bleacher Replacement Project - Electrical Package
Danville ONLINE San Ramon Valley Unified School District
925-552-2960 925-328-0560
11/18/2014 02:00 PM TG07.8 Expansion Joints
San Francisco ONLINE
11/18/2014 02:00 PM BART Earthquake Safety Programs Seismic Retrofit and Repairs at Various Locations
Bay Area S009/015C Bay Area Rapid Transit District
510-464-6383
11/18/2014 02:00 PM Elk Grove Mesa II Processing Room Project
Elk Grove ONLINE Elk Grove, City of 916-478-2212 916-691-3173
11/18/2014 03:00 PM Integrated Pest Management Services for Structural Facilities
Santa Clara County
ONLINE Santa Clara, County 408-299-2121 408-297-7133
11/18/2014 04:00 PM RFQ-Renewable Energy Cleaning and Maintenance
Santa Rosa ONLINE Santa Rosa, City of 707-543-3709 707-543-3703
11/18/2014 02:00 PM TG07.9 Bollards & Barriers
San Francisco ONLINE
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 37
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/18/2014 02:00 PM Storm Drain Video Inspection and Cleaning Phase I
Alameda ONLINE Alameda, City of 510-747-7930 510-769-6030
11/18/2014 02:00 PM Panera Bread-Alamo Alamo ONLINE 11/18/2014 02:00 PM Quinlan Community
Center Interior Upgrades
Cupertino ONLINE Cupertino, city of 408-777-3354 408-777-3333
11/18/2014 02:00 PM Drainage Inlet Structure Replacement at Various Locations on Foothill Road & Mines Road
Pleasanton 023C/R037 Alameda, County of 510-670-5900
11/18/2014 12:00 PM Senior Living at Lincoln
Lincoln ONLINE
11/18/2014 02:00 PM 2014 CIPP Storm Drain Rehabilitation Project
Monterey ONLINE Monterey, City of 831-646-3462 831-646-3267
11/18/2014 05:00 PM RFP for Hill Recreation Area/Margaret Todd Senior Center Master Plan and Design
Novato ONLINE Novato, City Of 415-899-8997 415-899-8251
11/18/2014 03:00 PM City Hall Trane Chiller Overhaul
Palo Alto ONLINE Palo Alto, City of 650-329-2271 650-329-2299
11/18/2014 02:00 PM Replace Glass Panels at Daly City Station Platform
Daly City ONLINE Bay Area Rapid Transit District
510-464-6383
11/18/2014 02:00 PM Interceptor Sewer Trunk Main Manhole Construction
Mountain View ONLINE Mountain View, city of
650-903-6311 650-962-8503
11/18/2014 01:00 PM Cory Hall-Elevator Modernization
Berkeley ONLINE Berkeley, UC 510-642-6273 510-642-7271
11/18/2014 05:00 PM Standard Agreement for Landscape Architectural Consultant for Three Creeks Trail
San Jose ONLINE San Jose, City Of 408-535-8300
11/18/2014 02:00 PM Plaza San Pablo Roadway Improvements Project Phases 1 and 2
San Pablo ONLINE San Pablo, City of 510-215-3000
11/18/2014 02:00 PM Haas School of Business S480 AV Renovation
Berkeley ONLINE Berkeley, UC 510-642-6273 510-642-7271
11/18/2014 02:00 PM Mobile Doosan Generator for Harbor Facilities
Oakland ONLINE Port Of Oakland 510-627-1526
11/18/2014 10:00 AM Bollman WTP Sodium Hypochlorite Tank T-46 Repair Project
Concord E345B/073C Contra Costa Water District
925-688-8000
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 38
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/18/2014 02:00 PM Intersection Improvements on Blacow Road at Grimmer Boulevard, Boone Drive, Robin Street/Omar Street and Fremont Boulevard
Fremont ONLINE Fremont, City of 510-494-4620
11/18/2014 04:00 PM Los Prados Park Synthetic Turf Soccer Fields
San Mateo E347B/063C San Mateo, City of 650-522-7300 650-522-7301
11/19/2014 10:00 AM City of Rocklin Corporation Yard Remodel
Rocklin ONLINE Rocklin, City of 916-625-5500
11/19/2014 02:00 PM Emergency Backup Generators for Fire Stations 42, 43 and 44
West Sacramento
ONLINE West Sacramento, City of
916-617-4645
11/19/2014 05:00 PM Traffic Signal and Lighting Maintenance
Menlo Park ONLINE Menlo Park, City of 650-330-6740
11/19/2014 02:00 PM Building 1550 and 1600 HVAC and Lighting Renovations
Aptos ONLINE Cabrillo Community College District
831-477-5613
11/19/2014 02:00 PM Laguna Treatment Plant Filter Valve Actuators and Valve Refurbishment
Santa Rosa ONLINE Santa Rosa, City of 707-543-3800 707-543-3801
11/19/2014 12:00 PM Boiler Replacement 555 Escobar Street
Martinez ONLINE Contra Costa, County of
000-000-0000
11/19/2014 02:30 PM Above Grade PCS and Signal Visibility Project (Micro-LBE Set-Aside Program)
San Francisco ONLINE San Francisco, City & County of
415-554-6229
11/19/2014 02:00 PM Delport Ave and McMinn Ave Sewer and Water Improvements
Santa Rosa ONLINE Santa Rosa, City of 707-543-3800 707-543-3801
11/19/2014 02:00 PM Alameda College Sitework Improvements
Alameda ONLINE Peralta Community College District
510-466-7225 510-587-7873
11/19/2014 11:00 AM City Hall Boiler Replacement
Lodi ONLINE Lodi, City of 209-333-6706 209-333-6710
11/19/2014 02:00 PM Air Compressor and Auxiliary Equipment Maintenance and Repair
Martinez ONLINE Central Contra Costa Sanitary District
925-229-7338 925-228-4624
11/19/2014 04:00 PM 376 Larkin Parking Garage Repairs
San Francisco ONLINE Hasting College of Law
415-565-4604
11/19/2014 02:00 PM A&F Salazar Hall Offices
Rohnert Park ONLINE Sonoma State University
707-664-2191 707-664-4183
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 39
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/19/2014 02:00 PM Measure U Park Irrigation Improvements-Package B
Sacramento ONLINE Sacramento, City of 916-808-8173 916-808-5747
11/20/2014 02:30 PM Livermore Pleasanton Fire Station No. 9
Livermore 022C/R042 Livermore, city of 925-960-4500
11/20/2014 04:00 PM Maple Park Phase 2 Senior Apartments
Live Oak ONLINE
11/20/2014 02:00 PM Walmart Building-Lodi (No GC Openings)
Lodi ONLINE
11/20/2014 02:00 PM Baffle Replacement Project
Vallejo ONLINE California Maritime Academy
707-654-1086
11/20/2014 02:00 PM Eigleberry Street Resurfacing Project
Gilroy ONLINE Gilroy, city of 408-846-0450
11/20/2014 02:00 PM Former Mercury Cleaners Plant Removal
Sacramento ONLINE Department of General Services
916-376-1600 916-376-6212
11/20/2014 02:00 PM MSC Conveyor System Maintenance and Repair Services
Stockton ONLINE California Department of Corrections & rehabilitation
916-255-6136
11/20/2014 02:00 PM Rehabilitation of Loyola Overcrossing at Foothill Expressway (Bridge No. 37C0117)
Los Altos 011C Santa Clara, County Of
408-573-2440
11/20/2014 02:00 PM JOC.14/15PW.CMA - Job Order Contract
Vallejo ONLINE California Maritime Academy
707-654-1086
11/20/2014 05:00 PM RFQ On-Call and Prequalified Shortlist for Construction Management Services (2015-2018)
Contra Costa County
ONLINE Contra Costa, County of
925-313-2000 925-313-2333
11/20/2014 02:00 PM Booker T. Washington Community Service Center
San Francisco ONLINE
11/20/2014 02:00 PM Regional Groundwater Storage and Recovery-WILL NOT BE ONLINE
San Francisco 178C San Francisco, City & County of
415-551-4603
11/20/2014 02:00 PM Vista Del Camino Office Repair Project
San Pablo ONLINE Housing Authority of Contra Costa Co.
925-957-8059
11/20/2014 02:30 PM Lawrence Road Traffic Safety Improvements
Danville Online Danville, Town of 925-314-3310 925-838-0360
11/20/2014 02:00 PM Schwerin Street Sewer System Improvement
San Francisco ONLINE San Francisco, City & County of
415-551-4603
11/20/2014 12:00 PM RFQ for On-Call Engineering and Construction Support Services
Napa County ONLINE Napa, County of 707-253-4351 707-299-4627
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 40
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/20/2014 11:00 AM Lodi Lake Storm Drain Outfall Improvement Project
Lodi ONLINE Lodi, City of 209-333-6706 209-333-6710
11/20/2014 02:00 PM Solar Photovoltaic Electric System and Parking Structure, East Parking Area-Romberg Tiburon Center-Rebid
Belvedere Tiburon
ONLINE San Francisco State University
415-338-1698 415-338-2960
11/20/2014 02:00 PM Replace Control Panels on Liftstations Candlestick State Recreation Area
San Francisco ONLINE Department of Parks & Recreation
707-769-5652 707-769-5675
11/20/2014 02:00 PM Four Parks Playground Renovation Project
South San Francisco
ONLINE South San Francisco, City of
650-829-6652
11/20/2014 02:00 PM Brigham Ave and Gordon Ln Sewer and Water Improvements-Vallejo St to Jeffrey St
Santa Rosa ONLINE Santa Rosa, City of 707-543-3800 707-543-3801
11/20/2014 04:00 PM Roseville Road Bridge Replacement Project
Sacramento ONLINE Sacramento, city of 916-808-2266 916-393-3725
11/20/2014 03:00 PM Removal and Replacement of Concrete within the Public Right-Of-Way
San Jose ONLINE San Jose, City Of 408-535-8300
11/20/2014 04:00 PM RFQ-Architectural and Engineering Team Design Criteria Consulting fo San Francisco Sheriff’s Dept Rehabilitation Detention Center
San Francisco ONLINE San Francisco, City & County of
415-554-6229
11/20/2014 02:00 PM FY 2014-2015 Interior Painting Vacant/Occupied and Common Areas
Sacramento ONLINE Capitol Area Development Authority
916-322-2114 916-441-1804
11/21/2014 02:00 PM Forsyth Hall Air Handing Units Upgrade Project
Santa Rosa ONLINE Santa Rosa Junior College
707-527-4422 707-527-4870
11/21/2014 05:00 PM RFP-Solar PV Energy California Department of Corrections and Rehabilitation
Various Cities ONLINE Department of General Services
916-375-4892
11/21/2014 02:00 PM Horizontal Drilling at US Coast Guard Island Base
Alameda ONLINE
11/21/2014 02:00 PM Student Center Water Softener Project-Rebid II
Rohnert Park ONLINE Sonoma State University
707-664-2191 707-664-4183
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 41
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/21/2014 11:00 AM RFP On-Call Asbestos and Lead Paint Consulting
Oakland ONLINE Port of Oakland 510-627-1439
11/21/2014 04:00 PM RFQ-Contsruction Manager/General Contractor for a New ESER 2010 Bond Fire Station 5
San Francisco ONLINE San Francisco, City & County of
415-554-6229
11/21/2014 03:00 PM Multiple Location-Baskin Engineering and E2 Absorption Chiller Installations
Santa Cruz ONLINE Santa Cruz, UC 831-459-2366 831-459-5540
11/24/2014 10:00 AM Site General Building Contractor, Mountain View Revitalization Pilot Program, Conway Homes and Sierra Vista Homes
San Joaquin County
ONLINE San Joaquin Housing Authority
209-460-5036
11/24/2014 02:00 PM Heating Ventilation Air Conditioning (HVAC) Package Units Maintenance Services
San Benito County
ONLINE San Benito, County of
831-636-4170 831-636-4176
11/24/2014 11:00 AM Security Gate Maintenance
San Benito County
ONLINE San Benito, County of
831-636-4170 831-636-4176
11/24/2014 02:00 PM Design-Build East County Hall of Justice Bid Package 2
Dublin ONLINE
11/24/2014 02:00 PM Elevator Service and Maintenance
San Benito County
ONLINE San Benito, County of
831-636-4170 831-636-4176
11/24/2014 05:00 PM Facility Painting and Coating
Antioch ONLINE Delta Diablo-Transforming Wasterwater to Resources
925-756-1900 925-756-1961
11/24/2014 10:00 AM Heating Ventilation Air Conditioning (HVAC) Maintenance Boiler/Chiller
San Benito County
ONLINE San Benito, County of
831-636-4170 831-636-4176
11/24/2014 02:00 PM RFP for Landscaping Services for the Special Waste Collection Center
Elk Grove ONLINE Elk Grove, City of 916-478-2212 916-691-3173
11/24/2014 03:00 PM 2014 Administration Building Expansion and Renovation Project (Rebid)
Citrus Heights ONLINE Citrus Heights Water District
925-725-6873 925-725-0345
11/24/2014 02:00 PM Shima Expansion Phase I / Holt Canopy Improvements Project
Stockton ONLINE San Joaquin Delta Community College District
209-954--5065
11/24/2014 11:00 AM Emergency Generator Maintenance
San Benito County
ONLINE San Benito, County of
831-636-4170 831-636-4176
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 42
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
11/25/2014 02:00 PM The Repair and Rehabilitation of High Street Bridge (33C-0026) and Park Street Bridge (33C-0027)
Alameda 009C/R013 Alameda, County of 510-670-5450
11/25/2014 02:00 PM Burlingame Intermediate School Classroom Building
Burlingame ONLINE
11/25/2014 05:00 PM RFP for Smith Field Park Master Plan
Half Moon Bay ONLINE Half Moon Bay, city of
650-726-8260
11/25/2014 02:00 PM Fencing Replacement Project
Stockton ONLINE San Joaquin Delta Community College District
209-954--5065
11/25/2014 02:15 PM Panic Hardware Installation and Door Replacements on Emergency Exits
Oakland ONLINE Department Of Transportation
916-227-6491 916-227-6007
11/25/2014 02:00 PM Civil, Landscape and Utilities Job Order Contract (Prequalified Generals Only)
Davis ONLINE Davis, UC 530-754-1111
11/25/2014 02:00 PM Seismic Upgrades-Phase II
Marina ONLINE Monterey Regional Water Pollution Control
831-883-6179 831-883-0516
11/25/2014 01:30 PM Upgrade Existing Facility Equipment for Alerton Building Energy Management System
Sacramento ONLINE Department of Motor Vehicles
916-657-8345 916-657-2367
11/25/2014 03:00 PM El Camino Park Restoration Project
Palo Alto ONLINE Palo Alto, City of 650-329-2271 650-329-2299
11/26/2014 02:00 PM Ambrose Aquatic Center Renovation Project
Pittsburg 007C/R007 Pittsburg, city of 925-252-4930 925-252-4814
11/26/2014 12:00 PM Fire Panel Replacement WCDF
Richmond ONLINE Contra Costa, County of
925-313-2000 925-313-2333
11/26/2014 02:00 PM Mission Bay North-NP43
San Francisco ONLINE
11/26/2014 02:00 PM B Tank Geotechnical Investigation and Analysis
Napa ONLINE Napa, City of 707-257-9341 707-258-7831
11/28/2014 01:00 PM Retrofit of Two Existing Hydraulic Elevators at Norman Mineta International Airport
San Jose ONLINE San Jose, City Of 408-535-8300
11/28/2014 02:00 PM Novato Housing Maintenance & Repair Electrical System
Novato ONLINE J.I. Garcia Construction, Inc.
559-276-7726 559-276-0326
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 43
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
12/1/2014 05:00 PM Richmond Transit Village Phase II Nevin Ave Improvements:Bart to 19th
Richmond ONLINE Richmond, City of 510-231-3011 510-231-3013
12/1/2014 02:00 PM SFO- Construction Manager/General Contractor for Fire House No. 3 and South Field Checkpoint Relocation Project
San Francisco ONLINE San Francisco International Airport
650-821-5540
12/1/2014 03:00 PM Islais Creek Facility Phase II-Maintenance and Operations Building
San Francisco ONLINE San Francisco, City & County of
415-701-4284 415-701-4300
12/1/2014 02:00 PM Design-Build East County Hall of Justice Bid Package 3
Dublin Pendin
12/2/2014 02:00 PM Centralized Irrigation Controller Replacement Project Phase II
Danville ONLINE Danville, Town of 925-314-3310 925-838-0360
12/2/2014 04:00 PM Provide and Install a Regenerative Particulate TRap
Merced ONLINE Merced, County of 209-385-7331 209-725-3535
12/2/2014 02:00 PM Reconstruction of Curb Drain Inlets at Various Locations in Castro Valley and San Lorenzo
Castro Valley/San Lorenzo
E346B/062C Alameda, County of 510-670-5450
12/2/2014 11:00 AM Tivoli West Well Modesto Online Modesto, City of 209-577-5405 209-544-8821 12/2/2014 02:00 PM Christen Hill Reservoir
Replacement Pacifica* 008C North Coast County
Water District 650-355-3462
12/2/2014 04:00 PM City Hall Annex Fire Suppression System
Santa Rosa ONLINE Santa Rosa, City of 707-543-3800 707-543-3801
12/3/2014 02:00 PM Sewer And Storm Drain Replacement FY 13-14
Tracy ONLINE Tracy, City of 209-831-6400 209-831-4430
12/3/2014 11:00 AM Structural Engineering Services for the Seismic Upgrade of the Southeast Plant
San Francisco ONLINE San Francisco, City & County of
415-551-4603
12/3/2014 02:00 PM Install Sump Pump Drain System at Food and Agriculture Bldg (006)
Sacramento ONLINE Department of General Services
916-376-9929 916-376-1677
12/3/2014 12:00 PM Provide and Install Access Control System
Merced ONLINE Merced, County of 209-385-7331 209-725-3535
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 44
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
12/3/2014 03:00 PM Baylands Park Equipment Replacement-Rebid
Sunnyvale ONLINE Sunnyvale, City of 408-730-7380 408-737-4950
12/4/2014 03:00 PM RFP for County of Santa Clara Property Disposal Services
San Jose ONLINE Santa Clara, County 408-299-2121 408-297-7133
12/4/2014 02:00 PM Warren Auditorium Lighting Upgrade Project
Rohnert Park ONLINE Sonoma State University
707-664-2191 707-664-4183
12/4/2014 10:30 AM Beltline Building Project - Phase 1
San Francisco ONLINE Port Of San Francisco
415-274-0411 415-274-0528
12/4/2014 02:30 PM Non-Hazardous Waste Removal and Hauling-Sacramento DMV
Sacramento ONLINE Department of Motor Vehicles
916-657-8345 916-657-2367
12/4/2014 02:00 PM Elihu Harris State Building 602-Access Barrier Removal Project
Oakland ONLINE Department of General Services
916-376-1731
12/4/2014 02:00 PM RFP for Engineering Services for Replacement of the Arbor Street Storm Drain
Alameda ONLINE Alameda, City of 510-747-7900 510-747-4805
12/4/2014 02:00 PM Valley View Elementary School Interim Housing
Richmond ONLINE West Contra Costa Unified School District
510-307-4540
12/4/2014 11:00 AM Striping and Marking Contract
Dublin ONLINE Dublin, city of 925-833-6630
12/4/2014 02:00 PM Rio Cosumnes Correctional Center (RCCC) Fire Alarm System Upgrade Phase 2A
Elk Grove ONLINE Sacramento, County of, Internal Services
916-876-6360 916-854-8988
12/5/2014 05:00 PM Contractor Prequalification for Napa County South Campus Improvement Project
Napa County ONLINE Napa, County of 707-253-4351 707-299-4627
12/5/2014 02:00 PM Jade Galore TI San Jose ONLINE SD Deacon General Contractors
916-969-0900 916-735-0800
12/5/2014 02:00 PM Vaughn Lateral 5 Pipeline
Dixon ONLINE Solano Irrigation District
707-455-4019 707-452-8557
12/8/2014 04:00 PM Winton Fence Replacements
Winton ONLINE Merced, City Of 209-385-6211
12/8/2014 02:00 PM SFO-Project Management Support Services for Long Term Parking Garage No. 2 Project
San Francisco ONLINE San Francisco International Airport
650-821-5540
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 45
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
12/9/2014 10:00 AM District Center Seismic Improvements
Concord Pending Contra Costa Water District
925-688-8000
12/9/2014 02:00 PM Replace Roll-Up Doors at Byron Storage Facility
Byron ONLINE California Department of Fish & Wildlife
916-323-1587 916-323-1622
12/9/2014 11:00 AM RFP for Pre-Fabricated Restroom Facility at Oakland International Airport Taxi Cab Lot
Oakland ONLINE Port Of Oakland 510-627-1526
12/9/2014 03:00 PM SCVMC Ancillary Building Projects
San Jose ONLINE Santa Clara, County Of
408-993-4600 408-993-4646
12/9/2014 02:00 PM Light Rail Efficiency Project:Mountain View Phase 2
Mountain View E824B/004C Santa Clara Valley Transportation Authority
408-321-7189 408-955-9729
12/9/2014 02:00 PM Alameda County Flood Control and Water Conservation Dist Engineering Professional Services
Alameda County
ONLINE Alameda, County of 510-670-5450
12/10/2014 02:30 PM RFQ As-Needed Hydrologic-Hydraulic Engineering Services 2014
San Francisco ONLINE San Francisco, City & County of
415-554-6229
12/10/2014 02:30 PM Non-Chemical Landscaping Service-Mountain View DMV
Mountain View ONLINE Department of Motor Vehicles
916-657-8345 916-657-2367
12/10/2014 01:30 PM May Nissen Swim Center Roof Replacement
Livermore ONLINE Livermore Area Recreation & Park District
925-373-5724 877-219-3765
12/11/2014 04:30 PM Pinole Skate Park Qualifications
Pinole* E348B/007C
12/11/2014 02:00 PM Pinole Valley High School Existing Campus Demolition
Pinole ONLINE West Contra Costa Unified School District
510-307-4540
12/11/2014 02:00 PM CPUC Replace Valve Controllers
San Francisco ONLINE Department of General Services
916-376-9929 916-376-1677
12/11/2014 02:00 PM TG08.9-Roll-Up Doors and Grilles
San Francisco ONLINE
12/15/2014 04:00 PM RFQ-Construction Management Support Services for the San Francisco Police Department’s Traffic Company and Forensic Division Facility
San Francisco ONLINE San Francisco, City & County of
415-554-6229
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 46
Bid Date Bid Time Project Name City BIN # Plan Issuer Plan Issuer Phone
Plan Issuer Fax
12/16/2014 02:00 PM Replacement of Two 60-Inch Diameter Tide Gates and Reconstruction of Wood Service Platform Along Thornton Avenue
Newark 009C/R012 Alameda, County of 510-670-5450
12/16/2014 02:00 PM TG13.4 Contract Grow Trees
San Francisco ONLINE
12/16/2014 02:00 PM As-Needed Engineering Support Services for Pavement Consulting
San Francisco ONLINE San Francisco International Airport
650-821-5540
12/16/2014 02:00 PM Easterly Wastewater Treatment Plant Tertiary Project - Lab Expansion
Elmira ONLINE Vacaville, City Of 707-449-5170 000-000-0000
12/17/2014 02:00 PM TG07.3-Miscellaneous Metals
San Francisco ONLINE
12/18/2014 02:00 PM TG08.7 Glass Floor Construction Services Package
San Francisco Online
12/18/2014 02:00 PM TG08.10 Glass Curtain Walls
San Francisco ONLINE
12/31/2014 05:00 PM Fremont Unified School District Qualified Bidders for the Year 2014
Fremont ONLINE Fremont Unified School District
510-657-0761
12/31/2014 05:00 PM Inclusion Letters for Contractors, Cupertino Unified School District
Cupertino N/A Cupertino Union School District
408-252-3000
12/31/2014 05:00 PM Inclusion Letters for Contractors, Ohlone Community College
Fremont N/A Ohlone Community College District
510-979-7567 510-979-7492
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
YOUR AD HERE!
For current rates and information contact Paula at
415.462.1220 or [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 47
www.marinba.org ◆ [email protected]
CLASSIFIED ADSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
SEEKING EXPERIENCED PROJECT MANAGER FOR
SAN RAFAEL BASED CONSTRUCTION CO.
Residential remodeling company seeks experienced project managers for full and/or time positions. Health care benefits
available after 60 days. Salary DOE.
QUALIFICATIONS INCLUDE:
Working knowledge of building tradesStrong organizational and managerial skillsCan read plans well and assemble materials lists2+ years in residential construction industryStrong organizational and interpersonal skillsWillingness & ability to interface with clients as well as staffStrong communication skills and clean/neat appearanceFamiliarity with Marin CountyClean driving recordFluent in both Spanish and English a plus
RESPONSIBILITIES INCLUDE (BUT NOT LIMITED TO):
Scheduling and timelinesJob costingAssemble & order materialsSchedule subcontractorsCoordination, communication, safety, planning, budgetingDocumentation & job logsInterfacing with clients/architects/engineers/etc.
Please forward resume and salary requirements to:[email protected]
SEEKING GENERAL ENGINEERING CONSTRUCTION FOREMAN FORMALONEY CONSTRUCTION, INC.
A successful candidate has the ability to work independently, manage/lead other crew members, and troubleshoot all aspects of the projects. The individual should be knowledgeable and proficient with all phases of general engineering construction and has an excellent attitude and work ethic. Compensation is
competitive and dependent on experience.
THE SITE SUPERINTENDENT/FOREMAN WILL:- Direct, supervise and teach other crew members- Perform any construction tasks needed to meet deadlines - Determine labor requirements and recruit talent to meet demands- Create supplies and materials lists and timelines- Review materials and subcontractors invoices against forecasts- Review job costs, budgets and weekly field time cards- Communicate with clients throughout the project to guarantee customer satisfactionRequirements:- Relevant industry experience.- Must utilize smart phone from the field for emailing and text messaging- Must be able to read and interpret plans- Knowledgeable in all trades- Excellent written and verbal communication skills, with an ability to speak professionally with clients, architects, subcontractors, etc.- Ability to identify and problem-solve various issues- Able to run projects with minimal supervision- Must have a truck in good working condition, insurance, valid driver’s license and own tools
What we offer:Competitive salary , 5 days / year PTO after 90 Days, Truck
Allowance, Gas Card
Equal Opportunity EmployerPlease submit cover letter and resume to
[email protected] and we will contact qualified candidates. Or fax to 415-493-6910 please includes salary requirements. Due to the high volume of
responses we will not be able to reply to all inquiries.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 48
SEEKING ESTIMATING ADMINISTRATOR
Dutra is currently looking for an Estimating Administrator. This position supports the Estimating Department. Successful applicant will be re-sponsible for distributing, organizing and maintaining bidding documents such as plans, specifications, addenda and quotes. Will also work to support the Chief Estimator and Proposal and Contracts Manager in preparing estimates, proposals, Statement of Qualifications and marketing materials. Additionally, will assist the Contract Administrator with bonds, contracts and tracking SBE participation.
ESSENTIAL DUTIES AND RESPONSIBILITIES:• Distribute, organize and maintain bidding documents including printing, copying, filing and tracking distribution.• Assist in the preparation of estimates, proposals, SOQs and marketing materials.• Assist in the preparation of contract documents, bond requests and Small Business Enterprise (SBE) requirements and goals.• Keep accurate records of SBE participation. Ensure company is compliant with SBE regulations.• Maintain detailed and organized files on future, current and past projects.• Prepare reports, maintain estimating schedule and track contract deadlines.• Identify and track bidding opportunities.
COMPETENCIES: Communication Proficiency: Demonstrates effective written and oral communication skills. Attention to Detail: Diligently attends to detail and pursues quality in accomplishing tasks. Checks work to ensure accuracy and completeness. Researching Information: Identifies, collects and organizes data for analysis and decision making. Knows where and how to access the right data for the assignment. Teamwork: Promotes cooperation and commitment within a team to achieve goals and deliverables.
QUALIFICATIONS: To perform this job successfully, an individual must be able to perform each essential duty satisfactorily. The require-ments listed below are representative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Education/Experience: Associate of Arts degree and at least three years of Administrative experience. Language Ability: ability to effectively communicate and respond to questions from manager, clients, customers and internal team. Reasoning Ability: ability to apply common sense understanding to carry out instructions furnished in written, oral, diagram, or schedule form. Computer Skills: to perform this job successfully, an individual should have knowledge of and experience with internet research, and advanced abilities in Microsoft Office software including Outlook, Word, Excel, and PowerPoint. Physical Presence: Regular and predictable physical presence in the corporate office is an essential qualification for this position due to the
importance of the team-related aspects of the essential duties, the aggres-sive timeframes under which the employee will operate, and the need for face-to-face interaction with employees in Estimating and Operations in order to properly perform job-related functions.
SUPERVISORY RESPONSIBILITIES: This position has no supervi-sory responsibilities.
WORK ENVIRONMENT: The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job. Reasonable accommoda-tions may be made to enable individuals with disabilities to perform the essential functions. Usual office work conditions. The noise level in the work environment is moderate. Minimum physical exertion.
PHYSICAL DEMANDS: The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the es-sential functions. The employee must occasionally lift and/or move up to 25 pounds. Specific vision abilities required by this job include close vision. While performing the duties of this job, the employee is regularly required to sit; use hands to finger, handle, or feel and talk or hear. The employee is occasionally required to stand and walk.
The above job description is not intended to be an all-inclusive list of duties and
standards of the position. Incumbents will follow any other instructions, and
perform any other related duties, as assigned by their supervisor.
www.marinba.org ◆ [email protected]
CLASSIFIED ADSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 49
www.marinba.org ◆ [email protected] ◆ [email protected]
CLASSIFIED ADSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
SEEKING ESTIMATOR IN COMMERCIAL ROOFING
Wedge Roofing, Inc. is currently looking for an Estimator in the Commercial Roofing Market for the San Francisco Bay Area. Experi-enced Estimator who is capable of performing hard bid and conceptual estimates in both private and public work markets. They must be
able to manage multiple estimates at one time along with some minor project management.
This person will need to have the ability to work with plans & drawings, clients, consultants, subcontractors and municipalities. This posi-tion will be expected to work in both a team atmosphere and function autonomously at various times. Local market estimating experience
is also preferred. Commercial Estimator position works from Petaluma office facility.
Desired Skills & Experience Familiarity with all major roofing systems.
Local Bay Area experience.Strong client interaction skills.
Strong plan & bid take off skills.
FOR MORE INFORMATION CALL 707-763-5475
Company Description: Since 1976, San Francisco Bay Area’s most trusted roofing contractor, Wedge Roofing provides quality and dependable roofing solutions for residential, commercial, industrial and public work clients throughout San Francisco, Marin County,
Sonoma County, Napa County and the East Bay.Lic # 416737 C-2, C39, C-43, & B General
YOUR AD HERE!
For current rates and information contact Paula at
415.462.1220 or [email protected]