1. Define Planning. Explain the steps in planning.
2. Dynamic leadership is an integral part of effective
managementDiscuss.
3. Explain the different kinds of communication.
4. Explain Bench marking.
5. State and explain the important principles and the
problems of co-ordination.
6. Describe the different types of Management Policies.
7. What are the quantitative techniques used in decision
making?
8. Distinguish between organisation as a structure and as
a process.
11
-
8/13/2019 MBA (Project Mgt.)
2/45
-
8/13/2019 MBA (Project Mgt.)
3/45
-
8/13/2019 MBA (Project Mgt.)
4/45
DE40262
PART B (4 15 = 60 marks)
Answer any FOUR questions.
9. Explain the important needs and approach to the
organisational behaviour.
10. Examine the process of learning.
11. What are the determinants of group cohesiveness? And
explain how determine cohesiveness.
12. Describe the strengths and weakness in the trait
approach to leadership.
13. Explain the process of communication.
14. Elaborate the elasticity of power concept.
15. Explain the concept of OD intervention.
-
8/13/2019 MBA (Project Mgt.)
5/45
-
8/13/2019 MBA (Project Mgt.)
6/45
-
8/13/2019 MBA (Project Mgt.)
7/45
DE4028
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.
First Semester
QUANTITATIVE METHODS
(2005 onwards)
Time : Three hours Maximum : 100 marks
PART A (5 8 = 40 marks)
Answer any FIVE questions.
1. Discuss about break-even analysis and explain its uses.
2. Explain different costs of operating a system.
3. Write a note on duality and sensitivity analysis.
4. Explain the formulation of linear programming problem
with example.
5. The initial basic feasible solution for the following
transportation problem by Vogels approximation method.
Warehouse Capacity
W1 W2 W3 W4
F1 19 30 50 10 7
Factory F2 70 30 40 60 9
F3 40 8 70 20 18
Demand 5 8 7 14 34
14
-
8/13/2019 MBA (Project Mgt.)
8/45
DE40282
6. Solve the following assignment problem :
I II III IV V
1 11 17 8 16 20
2 9 7 12 6 15
3 13 16 15 12 16
4 21 24 17 28 26
5 14 10 12 11 15
7. A bag contains 30 balls numbered from 1 to 30. One ball
is drawn at random. Find the probability that the
number of the ball drawn will be a multiple of
(a) 5 or 7 and
(b) 3 or 7.
8. What do you mean by EOL and EVPI in decision theory?
Explain.
PART B (4 15 = 60 marks)
Answer any FOUR questions.
9. What do you mean by Relevant cost? Discuss the
importance of relevant cost for decision making.
10. Solve the following linear programming problem usinggraphical method :
Maximize 21 4025 xxz +=
Subject to :
.0,where
6035
5052
4844
21
21
21
21
+
+
+
xx
xx
xx
xx
-
8/13/2019 MBA (Project Mgt.)
9/45
DE40283
11. Consider the following linear programming problem and
solve it using the simplex method.
Maximize 21 46 xxz +=
Subject to :
.0,where
200
81033
3902
21
2
21
21
+
+
xx
x
xx
xx
12. Alpha Textile Mills has four factories and four
warehouses across the state. The unit cost (in hundreds)
of transporting goods from factories to warehouses is
given in the following table.
Warehouse CapacityW1 W2 W3 W4
Factory 1 19 30 50 10 7
Factory 2 70 30 40 60 9
Factory 3 40 8 70 20 18
Requirement 5 8 7 14
Solve the transportation problem by obtaining feasible
solution through VAM and optimize it with MODI
method.
13. What do you understand by Monte-Carlo simulation?
Discuss the steps involved in carrying out Monte Carlo
simulation.
14. (a) What do mean by decision tree? List out the steps in
decision tree analysis?
(b) What are the advantages of the decision tree
approach?
-
8/13/2019 MBA (Project Mgt.)
10/45
DE40284
15. A small industry finds from the past data that the cost of
making an item is Rs. 25, the selling price of the item is
Rs. 30 if is sold within a week, and it could be disposed off
at Rs. 20 per item at the end of the week if unsold.
Frequency of weekly sales is given below :
Weekly sales : < 3 4 5 6 7 > 8No. of weeks : 0 10 20 40 30 0
Find the optimum number of items per week the industry
should make.
-
8/13/2019 MBA (Project Mgt.)
11/45
DE4029
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.
First Semester
BUSINESS LAWS
(2005 onwards)
Time : Three hours Maximum : 100 marks
PART A (5 8 = 40 marks)
Answer any FIVE questions.
1. Differentiate between Valid, Voidable and Void contracts
with examples.
2. What are quasi contracts and contingent contracts? Give
suitable examples.
3. What are the steps to be taken for preferring an appeal
before state commission under the Consumer Protection
Act.
4. Is registration of partnership compulsory? Explain the
methods of dissolution of partnership.
5. What are the methods of crossing of a cheque?
6. Differentiate indemnity from guarantee.
7. Explain the characteristics features of a company.
8. What are the principles of insurance?
15
-
8/13/2019 MBA (Project Mgt.)
12/45
DE40292
PART B (4 15 = 60 marks)
Answer any FOUR questions.
9. Discuss the provisions of law relating to contracts with
minors.
10. Describe the circumstances under which an agency
contract is terminated.
11. Explain the provisions of sale of Goods Act, 1930
regarding
(a) delivery of goods
(b) rights of unpaid seller.
12. Explain the mode of appointment of directors.
13. Describe the features of different types of companies.
14. List the various clauses usually incorporated in the
marine insurance policy. Examine the importance of
marine insurance.
15. Discuss the modes of discharge of contracts.
-
8/13/2019 MBA (Project Mgt.)
13/45
DE4030
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.
Second Semester
FINANCIAL AND MANAGEMENT ACCOUNTING
(2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
1. What are subsidiary books?
2. Explain the various conventions of accounting.
3. Is depreciation a source? Explain.
4. Explain the various functional budgets.
5. Define ratios and explain the limitations of ratio analysis.
6. Differentiate between trial balance and balance sheet.
7. What is single entry system? State its objectives.
8. Define management accounting. Explain its scope.
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
9. Explain the various postulates of accounting.
10. Define capital budgeting. Explain the various techniques
available for evaluation of capital budgeting.
21
-
8/13/2019 MBA (Project Mgt.)
14/45
DE40302
11. A textile company is considering two mutually exclusive
investment proposals for its expansion program. Proposal
A requires an initial investment of Rs. 7,50,000 and
yearly operating costing Rs. 50,000 and proposal B
requires an initial investment of Rs. 5,00,000 with an
yearly operating cost. Rs. 1,00,000. The life of theequipment used in both the proposal will be 12 years with
no salvage value, depreciation in straight line basis for
tax purpose. The anticipated increase in revenue is
Rs. 1,50,0000 per year in both the investment proposals.
The tax rate is 35% and cost of capital 15%. Which
proposal should be undertaken by the company?
12. From the following balance sheets of Block Ltd. on
31st March 2006 and 2007. You are required to prepare
fund flow statement.
Liabilities 31.3.06 31.3.07 Assets 31.3.06 31.3.07
Rs. Rs. Rs. Rs.
Share capital 1,00,000 1,00,000 Goodwill 12,000 12,000
General reserve 14,000 18,000 Building 40,000 36,000
Profit & Plant 37,000 36,000
loss a/c 16,000 13,000 Investments 10,000 11,000
Sundry creditors 8,000 5,400 Stock 30,000 23,400
Bills payable 1,200 800 Bills receivable 2,000 3,200
Provisions for Debtors 18,000 19,000
taxation 16,000 18,000 Cash at bank 6,600 15,200
Provisions for
doubtful debts 400 600
1,55,600 1,55,800 1,55,600 1,55,800
The following additional information has also been given.
(a) Depreciation charged on plant was Rs. 4,000
(b) Provision for taxation of Rs. 19,000 was made
during the year 2007
(c) Interim dividend of Rs. 8,000 was paid during the
year 2007.
-
8/13/2019 MBA (Project Mgt.)
15/45
DE40303
13. From the following details prepare statement of
proprietary funds with as many details as possible :
(a) Stock velocity 6, Capital turnover ratio (on cost of
sales) 2
(b) Fixed assets turnover ratio (on cost of sales) 4(c) Gross profit ratio 20%
(d) Debtors velocity 2 months
(e) Creditors velocity 73 days.
The gross profit was 60,000 reserves and surplus
amount to Rs. 20,000. Closing stock was Rs. 5,000
in excess of opening stock.
14. Define the term errors. Explain the various kinds of
errors with suitable examples.
15. Write a note on the following :
(a) Window dressing
(b) Accounting standards
(c) Common size statement
(d) Cash from operations
(e) Zero base budgeting.
-
8/13/2019 MBA (Project Mgt.)
16/45
DE4031
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.
Second Semester
BUSINESS ENVIRONMENT
(2005 Onwards)
Time : Three hours Maximum : 100 marks
PART A (5 8 = 40 marks)
Answer any FIVE questions.
1. Explain the fundamental issues involved in business
environment.
2. Bring out the impact of politics on business.
3. What are different economic systems? Explain capitalistic
economic systems.
4. State and explain the reasons for government
intervention in business.
5. Explain the functions of EXIM bank.
6. Give an account on the role of fiscal policy in business.
7. Elucidate the government policy in SSI.
8. Explain the impact of globalisation on Indian business.
22
-
8/13/2019 MBA (Project Mgt.)
17/45
DE40312
PART B (4 15 = 60 marks)
Answer any FOUR questions.
9. Examine the impact of socio-cultural environment on
business.
10. What are the reasons for inflation in India? Give
suggestions to control it.
11. Discuss the growing importance of foreign capital and
collaboration for Indian economic development. Elaborate
the government policy towards foreign capital and
collaboration.
12. Discuss the relevance and importance of MRTP act, 1969.
13. Examine the impact of monetary policy on Indian
business.
14. Bring out the economic developments of five year plans in
India.
15. Analyse the recent issues in environmental assessment
and evaluation.
-
8/13/2019 MBA (Project Mgt.)
18/45
DE4032
DISTANCE EDUCATION
M.B.A.(PM) DEGREE EXAMINATION, MAY 2012.
Second Semester
ENTREPRENEURSHIP DEVELOPMENT
(2005 onwards)
Time : Three hours Maximum : 100 marks
PART A (5 8 = 40 marks)
Answer any FIVE questions.
1. Describe the importance of entrepreneurs.
2. What are the sources of innovation?
3. Explain the economic environmental forces.
4. State the importance of entrepreneurial development.
5. Describe the major entrepreneurial assistance.
6. List out the entrepreneurship development programmes.
7. What is intrapreneurship?
8. Describe the significance of IRDP.
23
-
8/13/2019 MBA (Project Mgt.)
19/45
DE40322
PART B (4 15 = 60 marks)
Answer any FOUR questions.
9. Enumerate and explain the various types of innovation.
10. Critically evaluate the impact of legal and political
environment on entrepreneurial devlopment.
11. Explain the types of entrepreneurial development
training.
12. What are the schemes of backward area development?
Explain.
13. Discuss the recent trends in entrepreneurshipdevelopment.
14. Discuss the contribution of entrepreneurial society to
growth of business.
15. Explain the government support for the development of
women entrepreneurs.
-
8/13/2019 MBA (Project Mgt.)
20/45
DE4033
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.
Second Semester
PROJECT FORMULATION AND APPRAISAL
(2005 onwards)
Time : Three hours Maximum : 100 marks
PART A (5 8 = 40 marks)
Answer any FIVE questions.
1. Explain the importance of agriculture project.
2. Explain the types of projects.
3. What do you mean by project identification?
4. What are the stages in project formulation?
5. Explain commercial appraisal.
6. What are the contents of project report?
7. Explain turnkey project.
8. Explain BOOT.
PART B (4 15 = 60 marks)
Answer any FOUR questions.
9. Examine the important role of social welfare sector
projects in Tamilnadu.
10. Illustrate the factors contributing for selecting the project
in the political environment.
24
-
8/13/2019 MBA (Project Mgt.)
21/45
DE40332
11. What is project life cycle? Explain its significance and
stages.
12. Explain the managerial and technical project appraisal.
13. Explain the steps in project report preparation.
14. What is feasibility report? Explain the different steps
involved in feasibility report preparation.
15. Explain the concept of government revenue. Does really
projects contribute government revenue. Substantiate.
-
8/13/2019 MBA (Project Mgt.)
22/45
DE4034
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.
Second Semester
PROJECT SUPPORT SYSTEM
(2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
1. Explain the nature of support extended by Department of
science and Technology to Projects.
2. Explain the functions of Commodity Boards.
3. Explain the following terms
(a) Know how
(b) Process designing
(c) Designing Judicious financing plan
4. Examine the need for management training and
motivation to the entrepreneurs of today.
5. List the points to be considered while estimating the
project cost. Give a specimen of approved project.
6. Explain the functions of Entrepreneurship Development
Board.
7. Explain the significance of appropriate technology and
setting quality standards.
8. What are the services rendered by EXIM Banks for
supporting projects.
25
-
8/13/2019 MBA (Project Mgt.)
23/45
DE40342
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
9. Explain the institutional support extended by KVIC.
10. Describe the role of CSIR and ITCOT in providing
technical support to entrepreneur.
11. Discuss the services extended by ADB and IBRD for
financing projects.
12. How do the NGOs assist the entrepreneurs in preparing
and implementation of projects?
13. Explain the various assistance provided by IDBI for
projects.
14. Describe the main components of project support system.
15. Write short notes on:
(a) Venture Capital
(b) Market Intelligence
(c) Productivity Councils.
-
8/13/2019 MBA (Project Mgt.)
24/45
DE4035
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.Third Semester
PROJECT PLANNING AND EXECUTION
(2005 onwards)
Time : Three hours Maximum :100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
1. How is a project system developed? Explain.
2. What are project objectives and policies? Explain.
3. What are the points to be borne in mind while setting
project organization?
4. Bring out the relationship between project scheduling
and time monitoring.
5. Why is project execution plan required?
6. State the principles of ideal factory design and layout.
7. How are project overruns controlled? Explain.
8. Explain briefly the scope of project audit.
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
9. Discuss the nature and scope of Project management.
10. What are the merits and demerits of matrix form of
project organization?
11. What is Value engineering? Explain its significance.
31
-
8/13/2019 MBA (Project Mgt.)
25/45
DE40352
12. State and explain the prerequisites of successful project
implementation.
13. Narrate the causes and effects of project overruns.
14. Explain in detail the role played by an auditor in relation
to Project Audit.
15. Write an elaborate note on Project management
performance.
-
8/13/2019 MBA (Project Mgt.)
26/45
DE4036
DISTANCE EDUCATION
M.B.A.(PM). DEGREE EXAMINATION, MAY 2012.
Third Semester
PROJECT CONTROL SYSTEM
(2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
1. Explain briefly the types of decision.
2. Write a note on mathematical programming approach.
3. Explain briefly applied utility theory approach.
4. How is a project selected? Explain.
5. What do you mean by resource leveling? Explain.
6. Explain the concept of project scheduling.
7. What are the assumptions of CVP Analysis?
8. Mention any four uses of computers.
32
-
8/13/2019 MBA (Project Mgt.)
27/45
DE40362
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
9. Critically examine the approaches to decision making.
10. What are queuing models? Explain their merits and
demerits.
11. Critically examine CAPM approach.
12. Explain the steps involved in PERT analysis.
13. Write an elaborate note on pricing decisions and profit
planning.
14. Discuss the uses of decision tree analysis. Point out its
drawbacks.
15. Define Project monitoring. Explain its significance.
-
8/13/2019 MBA (Project Mgt.)
28/45
DE4037
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.
Third Semester
PROJECT RISK MANAGEMENT
(2005 onwards)
Time : Three hours Maximum : 100 marks
PART A (5 8 = 40 marks)
Answer any FIVE questions.
1. Define the terms Risk and uncertainty and distinguish
them.
2. Explain pure and Speculation Risks.
3. Risks of a business relates to its size. Explain.
4. What is safety audit? Explain its purpose.
5. What is Risk Exposure? How it can be done.
6. What is Risk Retention? Explain its needs.
7. State the objectives of Reinsurance.
8. What is APV? State its purpose.
PART B (4 15 = 60 marks)
Answer any FOUR questions.
9. Explain the nature and scope of Risk Management
process.
10. Explain the duties and responsibilities of Risk manager
of a corporate body.
33
-
8/13/2019 MBA (Project Mgt.)
29/45
DE40372
11. Describe the different measurement method of Risk.
12. What is Risk Exposure losses? How it could be controlled?
13. Discuss the different strategies of Risk avoidance
14. Explain the different qualitative Techniques of
measuring project Risks.
15. Discuss the different methods of classifying project Risk.
-
8/13/2019 MBA (Project Mgt.)
30/45
DE4038
DISTANCE EDUCATION
M.B.A (PM) DEGREE EXAMINATION, MAY 2012.
Third Semester
PROJECT FINANCE
( 2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
1. Explain the types of assistance project financing scheme.
2. Write a note on Capital Gearing.
3. Bring out the salient features of Global Depository
Receipts.
4. Define leasing. State its various forms.
5. List out the safeguards against pollution.
6. Write a note on Debt service coverage ratio.
7. Point out the assumptions of Break Even Analysis.
8. Why is BIFR set up? Explain.
34
-
8/13/2019 MBA (Project Mgt.)
31/45
DE40382
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
9. Discuss the project financing schemes offered by IDBI.
10. Narrate the factors influencing the fixed capital and
working capital.
11. What is venture capital? State its forms and significance.
12. Write an elaborate note on Evaluation of appropriateness
of technology.
13. Explain the components of economic analysis of project
appraisal.
14. What is Industrial Sickness? Enumerate the factors leadto industrial sickness.
15. Describe the stages involved in Project monitoring.
-
8/13/2019 MBA (Project Mgt.)
32/45
DE4039
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.
Third Semester
PROJECT CONTRACTING AND CLEARANCES
(2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
1. State the principle of Project contracting.
2. What is global Tendering? State its features.
3. Explain the significance of BOOT contracting.
4. What are INCO terms? State its purpose.
5. State the principles of agency contracts.
6. Explain the need for Insurance Project.
7. Distinguish between EMD and BSD.
8. State the essentials of selecting a good contractor.
35
-
8/13/2019 MBA (Project Mgt.)
33/45
DE40392
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
9. Describe the objectives and process of Packaging Project.
10. Discuss the objectives, significance and methods of
Project negotiation.
11. Explain the process of tendering and tender evaluation.
12. Explain the various risk associated in project contracting
for the purchaser and contractor.
13. Explain the need for obtaining different kinds of
clearances while executing a project.
14. Explain the essentials of certain legal aspects of project
contracting with specific provision of related legislations.
15. Discuss in detail the various aspects of control and
managerial functions in the areas of contract finalization.
-
8/13/2019 MBA (Project Mgt.)
34/45
DE4040
DISTANCE EDUCATION
M.B.A. (P.M) DEGREE EXAMINATION, MAY 2012.
Third Semester
E-COMMERCE APPLICATION IN PROJECT
MANAGEMENT
(2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
All questions carry equal marks.
1. Explain various media available to electronic commerce.
2. Briefly discuss the applications of e-commerce in respect
of organizations.
3. Outline the digital-token based electronic payment
systems.
4. What are the different risks involved in electronic
payment systems?
5. How do you standardise the E.D.I.?
6. Write a note on Value added Networks (VANs)
7. Explain the information based marketing.
8. What are the tools used in the process of consumer search
and resource discovery?
36
-
8/13/2019 MBA (Project Mgt.)
35/45
DE40402
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
All questions carry equal marks.
9. Discuss the framework of electronic commerce.
10. Write notes on:
(a) Smart card and e-payment systems and
(b) Credit card based e-payment system.
11. Discuss the Electronic Data Interchange applications in
business.
12. Write Notes on:
(a) Security and privacy issues in E.D.I. and
(b) EDI software implementation.
13. Write an elaborate note on advertising and marketing on
the Internet.
14. Describe the various consumers oriented applications of
electronic commerce.
15. Explain consumer search and resource discovery
paradigms.
-
8/13/2019 MBA (Project Mgt.)
36/45
DE4041
DISTANCE EDUCATION
M.B.A. (P.M) DEGREE EXAMINATION, MAY 2012.
Fourth Semester
PROJECT EXPORTS
(2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
All questions carry equal marks.
1. What is project export? Bring out its importance.
2. Discuss about exporter-wise analysis.
3. What criteria would you adopt in the selection of
exporters?
4. Explain the various specific policies of ECGC.
5. What are the problems encountered in Project exports.
6. Explain the role of EXIM Bank in project exports.
7. How do you do Region-Wise analysis?
8. What is marketing Project Exports? What are its needs?
41
-
8/13/2019 MBA (Project Mgt.)
37/45
-
8/13/2019 MBA (Project Mgt.)
38/45
DE4042
DISTANCE EDUCATION
M.B.A.(PM) DEGREE EXAMINATION, MAY 2012.
Fourth Semester
PROJECT MANAGEMENT SOFTWARE
(2005 Onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
1. What is a project and what are its main attributes?
2. Explain the components of project planning.
3. Describe the process of monitoring and controlling project
work.
4. Explain the various elements of PRINCE 2.
5. Explain the significance of basic Euro method model.
6. Explain the relationship of ISO12207 approach.
7. Write the content of the request for proposal document.
8. Briefly explain (PMBOK) Project Management Bodies of
Knowledge.
42
-
8/13/2019 MBA (Project Mgt.)
39/45
DE40422
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
9. Briefly explain the project management framework by
providing examples of stakeholders, knowledge areas,tools and techniques and project success factors.
10. Briefly describe what happens in each of the five project
management process groups [Initiating, Planning,
Executing, Monitoring, Controlling and Closing].
11. Explain Project Execution and its relationships to Project
planning.
12. Describe the steps involved in Project Procurement.
13. Discuss the software acquisition process supply process
and development process.
14. Explain the role of AIPM.
15. Discuss elaborately about various functions of
Information Systems Examination Board.
-
8/13/2019 MBA (Project Mgt.)
40/45
DE4043
DISTANCE EDUCATION
M.B.A. (PM) DEGREE EXAMINATION, MAY 2012.
Fourth Semester
DISASTER MANAGEMENT
(2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
All questions carry equal marks.
1. Define Disaster Management. State its objectives.
2. Briefly describe the causes and consequences of disasters.
3. What do you mean by management of natural disaster?
Explain.
4. Explain how Epidemics can be managed.
5. Discuss the role of Government in disaster Management.
6. Discuss about fire accidents during festival seasons and
the ways to manage them.
7. Highlight the specific efforts to mitigate disasters in
India.
8. Examine the role of government in disaster management.
43
-
8/13/2019 MBA (Project Mgt.)
41/45
DE40432
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
All questions carry equal marks.
9. Explain the various types of disasters.
10. Discuss the different types of cyclone and highlight it
causes.
11. What is Event Management? Bring out the need and
significance of conducting camps in Event Management.
12. With appropriate example, explain how the technological
advancement helps to prevent the Natural Disasters.
13. Explain the significance of events management.
14. Write a detailed note on Tsunami in the year 2004 and
discuss the action taken by the Government in India.
15. Elucidate the various activities followed in psychological
rehabilition of disaster affected people.
-
8/13/2019 MBA (Project Mgt.)
42/45
DE4044
DISTANCE EDUCATION
M.B.A.(PM) DEGREE EXAMINATION, MAY 2012.
Fourth Semester
SMALL BUSINESS MANAGEMENT
(2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
All questions carry equal marks.
1. How promotion of SSI helps in developing countries likeIndia?
2. Explain the factors to be considered while finalizinglocation of SSI unit.
3. Why government initiative is required to develop SSI inbackward region?
4. Discuss the Acts that helps women and child in SSI.
5. Bring out the government assistance in importingtechnology, material and resources by SSI.
6. Write a short note on SIDCO, NPC.
7. How marketing problem of SSI differ from bigCompanies?
8. Name and enumerate two government scheme extended
through banks in promoting SSI.
44
-
8/13/2019 MBA (Project Mgt.)
43/45
DE40442
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
All questions carry equal marks.
9. List and discuss the industrial policy that helps SSI in
India.
10. How the growth of SSI is significant in developing
countries like India?
11. "Innovation, organizing and Risk taking" are unique
qualities required for the success of SSI, Discuss.
12. How do you formulate marketing strategies for SSI in a
competitive environment?
13. Write a detailed note on the content of project report on
village industry.
14. Discuss the various problems faced by SSI in a business
environment.
15. Prepare a project report for a manufacturing type of SSI
unit.
-
8/13/2019 MBA (Project Mgt.)
44/45
DE4045
DISTANCE EDUCATION
M.B.A. (P.M) DEGREE EXAMINATION, MAY 2012.
Fourth Semester
PROJECT PREPARATION
(2005 onwards)
Time : Three hours Maximum : 100 marks
SECTION A (5 8 = 40 marks)
Answer any FIVE questions.
1. Discuss the project management techniques.
2. Describe the significance of project formulation.
3. Enlist the factors which influence the projects success
and failure.
4. Elaborate the demerits of a case analysis in project.
5. Explain the pre-requests for successful project
implementation.
6. How does PERT provide for uncertainty in activity
estimates?
7. State the circumstances where CPM is a better technique
of project management than PERT.
8. Describe the essentials of a project report.
45
-
8/13/2019 MBA (Project Mgt.)
45/45
DE40452
SECTION B (4 15 = 60 marks)
Answer any FOUR questions.
9. Explain the salient features of case analysis and briefly
explain the various steps involved in it.
10. Elaborate the process of appraisal while lending for a
project.
11. Describe the procedure for the construction of a project
Network.
12. Analyse the impact of social cost benefit analysis on
project selection.
13. Illustrate with examples the essential difference between
PERT and CPM techniques. Under what conditionswould you use PERT instead of CPM in project
management?
14. Explain the contents of a project report.
15. How would you classify the projects? Which criteria
seems to be move rationale and acceptable for
classification of projects. Elaborate.