    Q.No Criteria Marks Total Marks

    1. Explain the elements or components of operations strategy.

    A List the six elements of operations strategy Describe the six elements of operations strategy

    1 9(1.5 marks for each element)

    10

    2 Answer the following questions: a. What is location decision sequence?

    b. Which general factors influence the plant location decision?

    A a. Give the brief explanation of location

    decision sequence

    b. List the eight general factors influence

    the plant location decision

    Briefly explain each factor that

    influences the plant location decision

    1 1 8

    10

    3 Write short notes on:

    Pareto analysis

    Acceptance sampling

  • Jurans quality trilogy

    Taguchis quality loss function

    A Pareto analysis

    Acceptance sampling

    Jurans quality trilogy

    Taguchis quality loss function

    To answer short notes on the topics given above:

    i. Outline the main points of the topic

    ii. Analyse the topic

    iii. Conclude with your opinion

    10 (2.5 marks for each) Break up of 2.5 marks for each topic/short note 1 1 0.5

    10

    4 Answer the following questions:

    a. Define project management.

    b. What are the major characteristics of a project mindset?

    c. What are the advantages of Gantt chart?

    A a. Explain the term project

    management

    b. List and describe the major

    characteristics of a project mindset

    c. List the advantages of Gantt chart

    2

    5

    3

    10

    5 Answer the following questions:

    a. What are the steps involved in developing an aggregate plan?

    b. Explain the various types of pure strategies used in aggregate planning.

    A a. List the steps involved in developing

    an aggregate plan

    b. List and describe the various types of

    pure strategies used in aggregate

    planning

    4(1 mark for each step) 6 (2 marks for each strategy)

    10

  • 6 Answer the following questions:

    a. Explain the classification of scheduling strategies.

    b. List the distinctive differences between the scheduling followed for

    manufacturing and services

    A a. List and explain the classification of

    scheduling strategies.

    b. Write the differences between the

    scheduling followed for manufacturing

    and services

    6(1.5 marks for

    each

    classification)

    4