Urban transit study Comprehensive Public Transport Plan Developed by Sharif University of Technology Mashhad Transportation: 1994 to 1996 Development research of Railway Transport : 2002 to 2004
Specification Line 1 Line 2 Line 3 Line 4 TotalTotal length(km) 24 15 28.5 17.5 84.9
Number of Stations 24 13 24 15 76Railway system type LRT Metro Metro Metro N.A
Number of fleet required 160 140 140 140 580
Current number of fleet 60 - - - 60
Passenger capacity(in 16 hours) 170,000 512,000 512,000 304,000 1,498,000Designated headway 2.7 3 3 3 N.A
Mashhad Urban Railway networks
Line 1Line 2Line 3Line 4 0
5
10
15
20
25
30
24
14.9
28.5
17.5
One Metro line will be inaugurated approximately every 5 years over a 15 year period
Line 1Line 3
Line 2Line 4
Mashhad Urban Railway networks
Total: 4 Lines 85 Km 76 Stations
Line 1: 24 Km length / 24 station
Line 2: 15 Km length / 13 station
Line 3: 28.5 Km length / 24 station
Line 4: 17.5 Km length / 15 station
Line 5: (Monorail Ring belt) 46 km - study
phase
MURCO and MUROC
MUROCMURCO
MUROC Background
MUROC is an affiliate company of Mashhad Municipality established in 2005 The company currently operates 1 urban railway lines of 24 Km With inauguration of line 1, Mashhad became the second city of Iran which entered railway
transportation system In February 2th, The 4.5 Km extension of line 1 with 2 station(including HashemiNezhad
international airport) Was inaugurated and Mashhad Became the first Iranian city which connect it’s railway lines to it’s Airport.
Mashhad won UITP regional Award for customer service in May 2013 only after two and a half years of revenue service.
Customer Service Award
Annual Ridership Figures
100,000 Daily RidershipMore than 131 million passengers in total
20152014
20132012
20110
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,00037,047,714
32,641,77530,828,37925,882,611
4,837,731
Annual Ridership Figures
Fare Collection System
Contactless ManCard
RFID TechnologyChargeable
Integrated Ticketing System
for all transportation modes
Contactless(LRT station only) Multi trip
2,6,10 trips
Number of Employees 343Approach Maximum Outsourcing
Line length 24 KmLimited revenue operation since 21Th March 2011
Number of active vehicles 60Present timing 06:00 am to 22:00 pm
Current Headway in peak hours 4.5 minDesigned Headway(160 vehicles) 2.7 min
Complete journey time 44 minNumber of stations 22 stations
Daily ridership 100,000 passenger/day
Line 1 operation
Summary
We Operate Traffic
Stations
We Maintain Facilities
Rolling Stock
On time, even before
We TrainTechnical staff
Drivers
Thank You For Your Attention