EXTRA LOW VOLTAGE DIVISION

MALLS HOSPITALSHOTELSINFRASTRUCTURE

PRE QUALIFICATION FILE

6312 D

This image cannot currently be displayed.

Page 2: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

2

TABLE OF CONTENTS

1. About Extra Low Voltage Division

2. Quality Plan for Extra Low Voltage Division

3. Products

a. Building Automation / Building Management System

b. CO Monitoring System

c. Metering System (BTU, Water Meters, etc.)

d. Air Curtains

4. ELVD Scope of Works

a. ELVD Organizational Chart

b. Sales and Marketing

c. Contacts

d. Tender / Estimation

e. Design

f. Project Execution

g. Installation, Testing and Commissioning

h. Warranty and Certificates

6312 D

Page 3: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

TABLE OF CONTENTS

5. BMS Integration

a. Diagram

b. BMS Integration for AX Arena Typical Architecture

c. Direct Digital Controls (DDC)

d. DDC Excel Web Controller at Chiller Yard Integrated to BMS

e. FCU, Field Devices Integrated to BMS

f. Water Meter Integration to BMS

g. Air Curtain Integration to BMS

6. Project References

7. Major Executed Projects

6312 D 3

Page 4: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

4

Verger Delporte UAE Ltd has been operating in UAE since 1977 and have developedextensive experiences in many fields (i.e., Switchgear, IT, Trading, Contracting andEXTRA LOW VOLTAGE DIVISION “ELVD” ). Verger’s Extra Low Voltage Division isone of the Partners of Honeywell, Schneider Electric and Distributor of BTU,Electrical, Water Metering System.

Extra Low Voltage Division is specialized in the Supply, Engineering, Supervision,Installation and Testing and Commissioning for Building Management System (BMS),Metering System, CO Monitoring System and other services involving SystemIntegration.

We adhere to the highest standards of corporate governance by establishingprocesses and practices that promote and ensure integrity, compliance andaccountability.

Configured and manned to suit at best to an ever-changing market demand, thisdivision relies on:

● A proficient office personnels (Manager, Engineers, Designers, etc.) whose naturalskills stemming from a solid educational background and enhanced by a sharpknowledge of site, acquired by experience.

● Professional teams of well-trained technicians, chargehands and site engineers,earnestly carrying out all types of Extra Low Voltage System site duties, performingoften praised quality jobs and services thanks to a high workmanship.

● Active coordination between clearly defined sections actually customer-oriented, isa clue to clients’ and employees’ satisfaction. The Extra Low Voltage DivisionManagers see to the productive and reliable operating of the Managers under hisfold, while in turn, the Managers looking after various discipline keep a close eye ontheir fellow members to complete the jobs assigned in a professional way fulfilling theproject requirements and at the same time exceeding the client’s expectation.

1. ABOUT EXTRA LOW VOLTAGE DIVISION

6312 D

Page 5: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

5

2. QUALITY PLAN

Scope: Supply and Engineering of BMS and other Extra Low Voltage Products

Striving to be always at the edge, in this relentless business sector, the company had tolay down sound foundations before setting its organization in an ever –improving qualitydrive.

Internal organization in business key-processes to meet Project’s Quality requirements.

1. Marketing & Business Development:

● Working with MEP contractors, Consultants and end users offering quotations andwriting specifications as well as offering budget quotations when required.

● To coordinate with the management and other department in all respectscollecting market information and future planning.

2. Upon Project Allocation:

Prior to the acknowledgment of order, under the responsibility of ELVD Manager –

● To check that Verger’s offer / proposal meet the clients’ requirements in allaspects.

● To ensure that the agreed technical submittals / scope of works remain within ourcapacity.

3. Project Process:

Once the order is accepted, the Engineering Section shall make a technical submittalin accordance with the consultant’s requirements and specifications.

On receipt of any comment or design changes, the submittal shall be changed in linewith the specifications and in line with the project costing.

6312 D

Page 6: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

6

4. Design Engineering:

Under the supervision and direction of ELVD Manager / Operations Manager, to planadequately the tasks and their related human and material/equipment resources as percontractual date of delivery.

● Design, material selection with optimal time margin to customers’ approval.● To carry out the design (i.e., schematic, riser, etc.) followed by general

arrangements BMS systems integration, etc.● The thoroughly reviewed and approved “design output” depends on initial

control of the “design input” (Specifications, technical guides from theconsultant, international and local standards, tailor-made software).

● Material procurement and execution.● Testing and Commissioning.

5. Material Control: (Refer to GP6 – Purchasing and Material Control Procedure)

● Selection – Under the responsibility of competent personnel.

To choose materials required and/or requested by/from the clients and Verger’s list ofapproved suppliers (Quality, Health, Safety and Environmental performance), the rightmaterials complying with the specifications and applicable quality standards.

● Purchasing –

To place the corresponding order, thoroughly reviewed and approved by ELVDManager.

● Incoming Goods Inspection:

Under the responsibility of Engineering Section to check materials in compliance withthe specified requirements.

● Delivery –

Delivery notes or Invoices are prepared and material is sent to the site or to the controlPanel manufacturers for incorporation into relevant Control Panels where required. Alldocumentation recorded and filled up.

6312 D

2. QUALITY PLAN

Page 7: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

76312 D

2. QUALITY PLAN

6. Execution: (Refer to HSIM 6301)

● Under the Supervision of the Operations Manager, the projects engineer willliaise with the MEP contractor and Consultant through drawings or on sitecoordination indicating the correct installation of the components where requiredand adopting the correct procedures for installation.

● After installation of all materials and checking by the projects engineers, thecommissioning will start and the complete system will be put into correctoperation.

7. Site Hand-over / Maintenance period:

Under the control of the Testing & Commissioning Manager -

● To hand over a comprehensive quality documentation with a view to provideessential instruction for site operating / preventive maintenance /troubleshooting.

● Follow up for a Maintenance contract after handling over of the project if required.

8. Project’s Documents Control: (Refer to GP1 – General Documents Control)

Under the shared responsibility of the different section head:

● To record, file, update, withdraw and supersede the project-relate documents,when necessary, as per their relevance and importance with regard to qualityrequirements.

● To make information easy to retrieve, using electronic (diskettes, hard-disks) orpaper support, where applicable.

Page 8: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

86312 D

3. PRODUCTS

Controls, Automation & BMS and Metering System (Low Voltage); Total: 24+Engineers including technicians.

This image cannot currently be displayed.

“Supply and/or Installation”

AMR ProviderSystem Integrator

Partner

Partner

Page 9: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

9

A. Building Automation / Building Management System:

● DDC Controls and Panels● Integrated Room Controls (FCU & Valve Controls)● Symmetre BMS Software● AX (Hawk) integration controllers● AX integration Platform (Hardware and Software)● Energy Management Software modules

Field Devices:

● Valves/Actuators● Frequency Inverters● LON Field Devices● Thermostats● Sensors● Humidistats● Damper Actuators (Fire & Smoke and Direct Coupled)● Pneumatic Controls

Thermostat & Room Control:

● Electronic & Electro-Mechanical Thermostats● Room Controllers for Commercial Buildings● DX and Package unit Thermostat (wired and wireless)

B. CO Monitoring System

C. Metering System (BTU, Water Meters, etc.)

D. Air Curtains

6312 D

3. PRODUCTS

Page 10: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

10

4. EXTRA LOW VOLTAGE DIVISION – SCOPE OF WORKS4A. ELVD – ORGANIZATIONAL CHART

6312 D

Page 11: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

11

4B. SALES AND MARKETING

Entrusted to Sales Manager – Projects Development, who closely coordinates with hisDivision Manager the duties require a clever knowledge of the market and its related chainof decisions: end users, local authorities, consultants, main contractors, et. al.

With a view to ensure a strong and lasting presence in the whole of the Emirates, thanksto a sound, professionals, accessible, highly responsive and trustworthy representatives,Verger Delporte UAE Ltd has established this outpost with a base in Sharjah, UAE, andcovering the whole of the Emirates.

From the initial contacts set with customers up to the internal contract review, the SalesManager – Projects Development will acts as facilitator, striving to get the best level ofunderstanding between the two parties, ultimately bound by a flawless contract withinproven Verger Delporte’s capability.

6312 D

Page 12: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

126312 D

4C. Contacts

1. Mr. Hatem DarwishManagerExtra Low Voltage DivisionP.O. Box 5629 Sharjah, UAETel. : +971 6 5432436Fax : +971 6 5434139Mobile: +971 50 9427956E-mail : [email protected]

2. Ms. Eden de GuzmanGeneral Coordinator/SecretaryExtra Low Voltage DivisionTel. : +971 6 5432436 ext. 310Fax : +971 6 5434139E-mail: [email protected]

3. Ms. VERGER DEL PORTE UAE LTDElectrical & Mechanical Contracting, Switchgear ManufacturingTrading, Information Technology & Extra Low Voltage DivisionTel. : +971 6 5432436Fax : +971 6 5434139Website: www.verger-delporte.ae

Page 13: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

136312 D

4D. Tender / Estimation

Under the coordination and responsibility of a qualified engineers, a sound and confidentbusiness approach to get the best technical solutions, devised with the overridingconcern of meeting client’s needs.

The experienced Technical Engineers have been trained to design the various systemsin accordance to the details available in the Tender specifications.

Always on a technological watch, the engineers strive to make the client’s benefit byadopting the latest state of art technology by introducing new advanced system.

Worked out in close conjunction with the other sections, if required. The offerssubsequently checked by the management to ensure its relevance and suitability.

Page 14: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

146312 D

4E. Engineering and Design

Thoughtfully entrusted to a qualified Design team with a view to preserve the best ofspecialized competencies and foster maximum creativity.

The Main Activities carried out are the following:

1. Detailed Engineering2. Graphical Programming3. In house real time Programming

A well developed Engineering Workshop with latest state of art Demo set up helps theDesign Engineers to perform the programming and sequential checking of the operationbefore being transferred to the Execution Engineers. This helps in avoiding the delays inthe projects where in single Engineer carrying out the complete Job Distribution of theWorks speeds up our output time and Quality.

From the initial job assignments, optimally planned within the general time schedule, theproject joint works are all the more facilitated that the designers carry out their duties in asingle room, comfortably air-conditioned and economically furnished.

The Shop drawings and the Riser Drawings performed under the latest widely covetedAutoCAD software.

With the latest technology at hand, the sections’ output has substantially gained inproductivity, quality and reliability, giving nothing but entire satisfaction to thecustomers.

Page 15: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

156312 D

Adequately programmed from a collaboration of all the parties (Tender Section,Engineering Section, and Logistical Support Section of the Administration Departmentand Site teams), which produces a collection of expert advises, the project is entrustedto an Experienced Execution Engineer, under the overall supervision of the OperationsManager and Testing and Commissioning Manager coordinating with the Manager-Projects for site activities reporting back to the Manager Extra Low Voltage Division.

Drawings and materials approval by the consultant stand for the starting point of therelated site works, to be executed, tested, commissioned, and handed over to the client,within the allotted time.

Suitably manned as per the updated workload, the site is initially organized according tothe specificity of the job, hierarchical levels optimized in order to get the best output froma responsible and earnest personnel.

Current site competencies and resources can be described as follows:

● Operations Manager on assignment, exercising functional responsibilities,● Incumbent Site Engineers, guiding ELV Supervisors,● Safe and well-suited transport and handling means, carefully controlled

quality tools and electrical appliances, make up actual conditions for a quality and productive job on site, source of satisfaction from the contractor to the end user.

4F. Project Execution

Page 16: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

16

4G. Installation, Testing and Commissioning

Clearly of outstanding concerns for the consultant, main contractor or end user, theFinal visual inspection, Pre-commissioning, Commissioning duties are entrusted to dulyFactory Trained Engineers, certified by our Principle Manufacturers for specific type ofSystems.

These Engineers will coordinate with the contractor to Install the system as per theproject specification requirement. Upon completion of the Installation, they perform thePre-commissioning works followed by the commissioning of the Installed system.

Operations Manager and Testing & Commissioning Manager keep a close track on thesite activities and provide his value added suggestions and help for the propercompletion of the Job.

What evidence could we provide to a customer or any third party, likely but legitimatelyconcerned of our delivery's conformance to his specified requirements and otherapplicable standards?

Proper Quality Records are just thoroughly maintained for that very purpose. They bearwritten trace of all the actions that directly or indirectly affect the quality of product andservice delivered to the customer: Inspection, Pre-commissioning reports andCommissioning reports.

Finally, the client is given an Operation and Maintenance Manual, where he will find allrelevant information necessary to a safe and efficient operating of the installed system.

Below are the following important matters being discussed during the testing andcommissioning:

● Introduction and Scope● Location of Activity● Method and Procedure● Responsibilities● Tools/Equipment● Health and Safety● Test Sheets

6312 D

Page 17: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

17

4H. WARRANTY PERIOD / MAINTENANCE

With the warranty period stipulated by the contracts (a defined period from the sitehand over), the customer can call anytime for Verger Delporte’s intervention, providedthe issue prior assessment confirms it is in our scope of work.

An experienced team, equipped with proper tooling and / or instruments, conduct thenthe required maintenance, using the already released instructions and MaintenanceManual.

A Maintenance Contract will be offered to the client when it is necessary.

6312 D

Page 18: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

18

5. BMS INTEGRATION5A. Diagram

6312 D

Page 19: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

19

5B. BMS Integration for AX ArenaTypical Architecture

6312 D

Page 20: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

20

5C. Direct Digital Controls (DDC)

6312 D

Page 21: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

21

5D. DDC Exel Web Controller at Chiller Yard Integrated to BMS

Supply , Programming and Testing Commissioning DDC Excel WEB Controller at Chiller Yard Integration to Building Management System.

DDC EXCEL WEB CONTROLLER IN MAIN CONTROL CENTER PLANT ROOM

6312 D

Page 22: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

22

Supply , Programming and Testing Commissioning FCU ( Fan Coil Unit )Controller Complete Function of all field devices Integration to BuildingManagement System.

FAN COIL UNITS WITH CORRESPONDING HONEYWELL CONTROLLLER

5E. FCU, Field Devices Integrated to BMS

6312 D

Page 23: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

23

Supply , Programming Testing and Commissioning Complete Water Metering System Integration to Building Management System.

WATER METERING SYSTEM

5F. Water Meter Integration to BMS

6312 D

Page 24: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

24

WATER METER REPORT SNAP SHOT FROM M-BUS GATEWAY

6312 D

5F. Water Meter Integration to BMS

Page 25: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

25

Supply , Programming Testing and Commissioning Complete Air Curtain System Integration to Building Management System.

AIR CURTAIN SYSTEM

5G. Air Curtain Integration To BMS

6312 D

Page 26: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

26

5G. AIR CURTAIN

6312 D

Page 27: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

276312 D

6. Project References

SR. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

1General Hospital at Al Rahba ‐ Female 

Ward Hospital ABU DHABI Standalone 

Control SEHA 

2General Hospital at 

Al Rahba ‐ ICU Ward 

Hospital ABU DHABI Standalone Control SEHA 

3General Hospital at Al Rahba ‐Male 

Ward Hospital ABU DHABI Standalone 

Control SEHA 

4General Hospital at 

Al Rahba ‐Obygyne/Pediatric 

Ward 

Hospital ABU DHABI Standalone Control SEHA 

5Sheikh Khalifa Bin Zayed Hospital ‐

Ajman Hospital AJMAN iBMS AJZ ENGR.

6 National Reference Laboratory Project  Laboratory  ABU DHABI iBMS  AL HASHMI

7 National Reference Laboratory Project  Laboratory  ABU DHABI

Fume Hood Extract Fans  AL HASHMI

8 Masdar Mist 1A ‐Controllers  Laboratory  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

Page 28: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

286312 D

6. Project References

S. NO

PROJECT NAME PROJECT TYPE PROJECT LOCATION SYSTEM CONSULTANT

9 Masdar Mist 1A ‐Controllers  Laboratory  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

10 Masdar Mist 1A –Chiller Yard  Special project  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

11 Masdar MIST 1A –Air Curtains Special project  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

12Masdar MIST 1A –Fume Hood Extract 

Fans Laboratory  ABU DHABI Fume Hood 

Extract fans RWA ‐

ARMSTRONG

13 MIST 1A  Laboratory  ABU DHABIMetering & Energy 

Monitoring 

RWA ‐ARMSTRONG

14 Masdar Mist 1B  Laboratory  ABU DHABIMetering & Energy System 

RWA ‐ARMSTRONG

15 Masdar Mist 1B Air Curtain  Special project  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

16 Masdar Mist 1C  Special project  ABU DHABIMetering & Energy 

Monitoring WSP

17 Indoor GO Karting  Special Project  DUBAI BMS BURTHILL

Page 29: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

29

6. Project References

6312 D

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

18 Ras Eng Procladfactory  Factory  RAS AL KHAIMAH DDC Control  DIRECT FROM 

CLIENT

19 UAE Al Ain University  University  AL AIN DDC 

Controls  AECOM

20 British Petrol  Oil & Gas  ABU DHABI BMS  DIRECT FROM CLIENT

21 CML Industries  Factory  ABU DHABI DDC Control DIRECT WITH CLIENT

22 Saudi Arabia  DDC Control  SAUDI ARABIA Oil and Gas  DIRECT WITH CLIENT

23 Dalma Gloria Hotel  Hotel  DUBAI iBMS  NEB

24 Al Yassat Gloria Hotel  Hotel  DUBAI iBMS NEB

25 Nation Tower  Mall, Hotel & Residential  ABU DHABI iBMS  KEO

26 Ritz Carlton Hotel  Hotel/Apartments  DUBAI BMS WSP

27B +G+4 BldgEmirates Garden

Residential DUBAI BMS Conin Inc.

Page 30: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

306312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

28 3B+G+4P+22 (Metropolis) Commercial  DUBAI BMS LACAZA/HYDR

O

29 JBR‐Sheraton  Hotel  DUBAI iBMS  ARENCO

30 Rotana Hotel ‐Fujairah  Hotel  FUJAIRAH BMS  ACG

31 Arabtec New head Office  Commercial  DUBAI BMS  DIRECT FROM 

CLIENT

32 DIP Head Quarters Building DUBAI BMS DEWAN

33 Dubai Silicon Oaisis ‐ Jade  Tower  DUBAI BMS LACAZA

34 Dubai Silicon Oaisis ‐ Coral  Tower  DUBAI BMS LACAZA

35 Dubai Silicon Oaisis ‐ Saphire Tower  DUBAI BMS LACAZA

36 Dubai Silicon Oaisis ‐ Ruby  Tower  DUBAI BMS LACAZA

37 Ajman Villa Residential AJMAN BMS DIRECT WITH CLIENT

38 MBG Laboratory at Za’beel Laboratory  DUBAI

Pressure Control System

HIDI RAE 

Page 31: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

316312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

39Fortress 

Compound –First Gulf Bank 

Residential  ABU DHABI BMS  DIRECT WITH CLIENT

40 IMPZ ‐ Tower  Residential  DUBAI BMS bdpl Architects & Consul.

41 Express Hotel by Holiday Inn  Hotel  DUBAI Lighting 

Control NEB

42 Al Furjan Sales Center ‐ Dubai  Villas  DUBAI BMS  BURTHILL

43 Al Naeem Mall at RAK  Mall  RAS AL KHAIMAH BMS  RICE & PERRY

44 RAK Substation 400 KV  Special Project  RAS AL KHAIMAH DDC Control  MOTT 

MACDONALD

45 RAK Substation 400 KV  Special Project  RAS AL KHAIMAH DDC Control  MOTT 

MACDONALD

46

Expansion of 33kV Network in Western Region 

Madinat Zayed Substation 

Special Project  ABU DHABI DDC Control  PB POWER

47 ICAD WEST Substation  Special Project  ABU DHABI DDC Control  LAHMEYER 

INT'L

Page 32: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

326312 D

6. Project References

S. NO PROJECT NAME

PROJECT TYPE PROJECT LOCATION SYSTEM CONSULTANT

48West Wharf Residential Tower 

Tower  DUBAI BMS  RMJM

49 Techload  Special Project  SHARJAH Solar Energy; DDC Control 

DIRECT WITH CLIENT

50 Mayfair Tower  Twin Tower  DUBAI BMS & BTU Meters  HYDRO ENGR.

51 Appricot Tower  Tower  DUBAI DDC Control  MEECON

52Sub Station 4 at Saadiyat Island, 

Abu Dhabi Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

53Sub Station 6 at Saadiyat Island, 

Abu Dhabi   Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

54 Al Dahma Substation  Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

55Substation 3 at Saadiyat Island, 

Abu Dhabi Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

Page 33: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

336312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

56S3bstation 5 at Saadiyat Island, 

Abu Dhabi Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

57 Zabee'l Sports Club Sports Complex DUBAI DDC Control EO

58 Neopharma Pharmaceutical ABU DHABI BMS POYRY 

59 Appricot Tower  Tower  DUBAI CO System  MEECON

60

Dubai Investment Park 

New Head Office 

Tower  DUBAI BMS  DEWAN

61 Unibras –Fabtech  Factory  DUBAI Green 

Building DIRECT WITH 

CLIENT

62 Thales Project  Airport FZ  DUBAI CCTV  DIRECT WITH CLIENT

63 Masdar MIST 1A – Water Meters  Laboratory  ABU DHABI

Metering & Energy 

Monitoring 

RWA ‐ARMSTRONG

64 Guardian Tower  Tower  ABU DHABI CO System  ERGA 

Page 34: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

346312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

65

Dubai Silicon Oaisis

Community Center 

Sales Center  DUBAI BMS  ARCH GROUP

66 Dome Tower  Tower  DUBAI BMS  QHC

67 Novotel Hotel  Hotel  ABU DHABI BMS  ACG

68 Ibis Hotel  Hotel  ABU DHABI BMS  ACG

69 Botanica Tower  Tower  DUBAI BMS NEB

70 Botanica Tower  Tower  DUBAI CO System  NEB

71 Al Bateen  Towers  DUBAIMetering & Energy System

NEB

72G+4 LabourAccom‐modation

Accommodation  DUBAI DDC Control  AL AJMI

73 Meydan  Hotel  DUBAI Hotel Mgnt. System 

DIRECT WITH CLIENT

Page 35: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

356312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

74 Presidential Palace  Palace  ABU DHABI DDC Control DIRECT WITH 

CLIENT

75 Dubai Land Project  Sales Center  DUBAI HVAC 

Control DIRECT WITH 

CLIENT

76 Sky News New Head Quarters  Special Project  ABU DHABI

BMS  & Control Panel 

NORR GROUP

77 Sorouh Tower  Towers  SHARJAH BMS  TRILLIUM

78Fujairah 

Commmercial Complex

Mall FUJAIRAH BMS ACG

79 Garhoud Hospital Hospital DUBAI BMS PIONEER 

ENGR.

80 Dubai Police Government Building DUBAI BMS NOVA

81 Construction of School ‐ RAK School RAS AL KHAIMAH BMS DIRECT WITH 

CLIENT

82 Leaf Tower Tower ABU DHABI BTU E‐TAN CONSUL.

Page 36: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

366312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

83 Dubai Mall  (Penguin chiller)  Mall DUBAI DDC Control WSP

84Dubai Mall Aquarium 

ModificationMall DUBAI DDC Control DIRECT WITH 

CLIENT

85 Oxford Tower Tower DUBAI BMS AREX

86 Yasmine Tower Tower RAS AL KHAIMAH BMS DIRECT WITH CONTRACTOR

87 Al Kasmi Hospital Hospital SHARJAH BMS DIRECT WITH 

CLIENT

88 Saraya Creek Tower Tower ABU DHABI BTU E‐TAN CONSUL.

89Construction of 

Secondary School for Girls

School SHARJAH BMS DIRECT WITH CLIENT

90 C19 Capital Tower Tower ABU DHABI BMS AECOM

91 Capital Bay Tower DUBAI BMSELEGANT 

CONSULTING ENGR.

Page 37: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

376312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

92 Burlington Tower Tower DUBAI BMS NOVA

93 Airport Dubai T2 Airport  DUBAI

BMS SOFTWARE INTERFACE FOR PAS BET. 

T2 & T3 

EDPI

94 Al Safouh Villa Villa DUBAI BMS ACG

95 Oceanic Hotel Hotel KORFAKHAN BMS DIRECT FROM CLIENT

96 Executive Bay Damac Tower DUBAI BMS

ELEGANT CONSULTING 

ENGR.

97 Investment Bank Sharjah Bank  SHARJAH BMS AL TERAZ

98 Sky News Arabia TV Network ABU DHABI AMC DIRECT WITH CLIENT

99 Dubai Studio Studio DUBAI BMS AECOM

Page 38: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

386312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

100 Everest Factory Factory  SHARJAH BMS PIONEER ENGR.

101 OceanaPenthouse Penthouse DUBAI BMS BLANCHARD

102 Ocean Scape Residential ABU DHABI BTU KHATIB & ALAMI

103 Res'l Tower @ DSO Residential DUBAI BMS ARCH GROUP

104

NeighborhoodRetail Center –DiscoveryGarden

Mall DUBAI BMS ARIF BINTOK

105 NeighborhoodRetail Center Mall DUBAI BMS ARIF BINTOK

Page 39: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

396312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

106 ResidentialTower at DSO Tower DUBAI BMS ARCH GROUP

107 Lake Tower Towre DUBAI BMS NEB

108 Milleneum GolfResort Hotel ABU DHABI BMS ACG

109Exec. Bay on Plots

BB.A05.039Commercial  DUBAI BMS ENGR.

CONSORTIUM

110 Gulf DataCenter Data Center DUBAI BMS NOVA

111 Burj Damac 5 Hotel  DUBAI BMS LACAZA

Page 40: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

406312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

112 Best FoodFactory Factory  DUBAI BMS SHAHID ENGR.

CONSUL

113Fujairah

CommercialComplex

Mall FUJAIRAH BMS ACG

114 Ruwais RefineryExtension Refinery ABU DHABI BMS ECG

115 Multi Use hallin Fujairah Hall FUJAIRAH BMS GOLDEN

PLANNERS

Page 41: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

416312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

116Emaar

BoulevardRestaurant

Restaurant DUBAI BMS B.H.NS ENGR. CON.

117 Mina Al Fajer(Fairmont) Hotel FUJAIRAH BMS DCC

118 B+G+7 Hotel Hotel DUBAI BMS ATOZ

119 Sky Garden Tower ABU DHABI BMS & BTUMeters 

PIONEERENGR.

Page 42: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

426312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

120 MadaamMosque Mosque SHARJAH BMS C.A.B. CONSUL.

121Mushref

CooperativeMall

Mall ABU DHABI BMSELEGANT

CONSULTINGENGR.

122G+3 Residential

Building @ Al Barsha

Residential DUBAI BMS GLOBALTECH

123 AABar Tower Tower ABU DHABI BTU APG

124 Ambulatory Clinic Clinic AL AIN BMS SEHA 

Page 43: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

436312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

125 G+M GeneralClinic Clinic DUBAI BMS ORBIT ENGR.

126Mixed UseBuilding in

DubaiResidential DUBAI BMS BEL‐YOAHAH

127 Sheraton Hotel Hotel DUBAI BMS TORONTEC

128 Chemical Ware house Warehouse DUBAI BMS SPEC

Page 44: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

446312 D

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

129 GSL Warehouse Warehouse DUBAI BMS WINNERCONSUL.

130 NajmatResidential Residential ABU DHABI BMS, BTU APG

131 Family Complex Residential DUBAI BMS ARCH DOME

Page 45: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

45

7. Major Executed Projects

6312 D

TAKREER RUWAIS REFINERY – NON PROCESS BLDG.

Project Type : Oil & GasLocation : Abu DhabiClient : Ed ZublinScope : BMSProduct : Honeywell

Page 46: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

46

7. Major Executed Projects

6312 D

DUBAI INVESTMENT PARK – HEAD QUARTERS, DUBAI

Project Type : Investment ParkLocation : DubaiClient : Dubai InvestmentsScope : BMS - AMCProduct : Honeywell

Page 47: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

47

7. Major Executed Projects

6312 D

DUBAI MALL, DUBAI

PROJECT  TYPE` : MallLOCATION : DubaiCLIENT : EMAARSCOPE : Building Management System/New ScopePRODUCT : HONEYWELL

Page 48: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

48

7. Major Executed Projects

6312 D

MASDAR CITY – ADB

Project Type : UniversityLocation : Abu DhabiClient : Al AndhimahScope : BMSProduct : Honeywell

Page 49: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

49

7. Major Executed Projects

6312 D

DEIRA CITY CENTER, DUBAI

PROJECT  TYPE : MallLOCATION : DubaiSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 50: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

50

7. Major Executed Projects

6312 D

PROJECT  TYPE : MALL    LOCATION : Dubai, UAEMEP CONTRACTOR : Conversion ElectromechaSCOPE : Building Management SystemPRODUCT : HONEYWELL

IBN BATUTTA MALL

Page 51: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

51

7. Major Executed Projects

6312 D

ARABIAN RANCHES RETAIL CENTER

PROJECT  TYPE` : Retail CenterLOCATION : DubaiSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 52: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

52

7. Major Executed Projects

6312 D

ARABIAN RANCHES CLUB

PROJECT  TYPE` : ClubLOCATION : DubaiSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 53: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

53

7. Major Executed Projects

6312 D

AL NAEEM MALL, RAK

PROJECT  TYPE : MallLOCATION : Ras AlkhaimahSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 54: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

54

7. Major Executed Projects

6312 D

AL FURJAN NEIGHBORHOOD RETAIL CENTER, DUBAI

PROJECT  TYPE : Retail CenterLOCATION : DubaiCLIENT : ConversionSCOPE : BMSPRODUCT : HONEYWELL

Page 55: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

55

7. Major Executed Projects

6312 D

NEIGHBORHOOD RETAIL CENTER, DUBAI

PROJECT  TYPE   : Retail CenterLOCATION : DubaiCLIENT : ConversionSCOPE : BMSPRODUCT : HONEYWELL

DSO COMMUNITY CENTER, DUBAI

PROJECT  TYPE   : Retail CenterLOCATION : DubaiCLIENT : EfecoSCOPE : BMSPRODUCT : HONEYWELL

Page 56: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

56

7. Major Executed Projects

6312 D

NEO PHARMA, ABU DHABI

NATIONAL REFERENCE LABORATORY - ADB

Project Type : PharmaceuticalLocation : Abu DhabiMEP Contractor: Al ShirawiScope : BMSProduct : Honeywell

Project Type : LaboratoryLocation : Abu DhabiMEP Contractor: Al SabbahScope : BMSProduct : Honeywell

Page 57: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

57

7. Major Executed Projects

6312 D

SHEIKH KHALIFA HOSPITAL - AJMAN

Project Type : HospitalLocation : AjmanMEP Contractor : StrabagScope : BMSProduct : Honeywell

Page 58: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

58

7. Major Executed Projects

6312 D

PROJECT  TYPE` : TowerLOCATION : Dubai, MarinaSCOPE : Building Management SystemPRODUCT : HONEYWELL

DAMAC HEIGHTS TOWER

Page 59: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

59

7. Major Executed Projects

6312 D

PROJECT  TYPE` : TowerLOCATION : DubaiSCOPE : Building Management SystemPRODUCT : HONEYWELL

DAMAC TOWERS BY PARAMOUNT

Page 60: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

60

7. Major Executed Projects

6312 D

DAMAC OCEANSCAPE, ADB

PROJECT  TYPE` : TowerLOCATION : Abu DhabiCLIENT : DAMAC PROPERTIESSCOPE : BTU METERING SYSTEMPRODUCT : DIEHL ‐ HYDROMETER

Page 61: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

61

7. Major Executed Projects

6312 D

NATION TOWERS

PROJECT  TYPE` :          TowerLOCATION :          Abu DhabiMEP CONTRACTOR :          EFECOSCOPE :          BTU METERING SYSTEM/BMSPRODUCT :          DIEHL – HYDROMETER / HONEYWELL

Page 62: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

62

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Sharjah,  CornicheCONSULTANT : TRILLIUMMEP CONTRACTOR : Thermo LLCSCOPE : BMS & BTU METERING SYSTEMPRODUCT : HONEYWELL / DIEHLNUMBER OF POINTS : 5,000

SOROUH TOWER

Page 63: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

63

7. Major Executed Projects

6312 D

PROJECT  TYPE    : TowerLOCATION : Dubai, MarinaSCOPE : BTU Metering SystemPRODUCT : Diehl Hydrometer

MARINA, DIAMOND 5 TOWER

MARINA, DIAMOND 6 TOWER

PROJECT  TYPE    : TowerLOCATION : Dubai, MarinaSCOPE : BTU Metering SystemPRODUCT : Diehl Hydrometer

Page 64: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

64

7. Major Executed Projects

6312 D

PROJECT  TYPE : HotelLOCATION : Abu DhabiCONSULTANT : ACGMEP CONTRACTOR : Verger Delporte UAE Ltd.SCOPE : Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS : 3,500 – Novotel

3,500 ‐ Ibis

NOVOTEL & IBIS HOTEL

Page 65: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

65

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Abu DhabiMEP CONTRACTOR : Verger Delporte UAE LtdSCOPE : BMSPRODUCT : HONEYWELL

CAPITAL HOUSE TOWER

Page 66: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

66

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Abu DhabiCONSULTANT : APGMEP CONTRACTOR : ETTSSCOPE : Building Management SystemPRODUCT : HONEYWELL

NAJMAT RESIDENTIAL TOWER

Page 67: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

67

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Abu DhabiCONSULTANT : Union National Bank/ Al Wifaq Abu DhabiMEP CONTRACTOR : Verger Delporte UAE LtdSCOPE : BMSPRODUCT : HONEYWELL

Najmat Residential Tower, Plots C1 & C4, Al Reem Island

Page 68: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

68

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Dubai, Business BayMEP CONTR    : SIGMA ENGINEERING LLCSCOPE : BMSPRODUCT : HONEYWELL

CAPITAL BAY TOWER

PROJECT  TYPE : TowerLOCATION : Dubai, Business BayCONSULTANT : Elegant Consulting Engr.MEP CONT : SIGMA ENGINEERING LLCSCOPE :  BMSPRODUCT : HONEYWELL

EXECUTIVE BAY TOWER

Page 69: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

69

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Dubai, JumeirahCONSULTANT : NEBMEP CONTR       : RadiantSCOPE : BMSPRODUCT : HONEYWELL

LAKE TOWER

AL MAMZAR TOWER, SHARJAH

PROJECT  TYPE   : TowerLOCATION : SharjahSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 70: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

70

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Abu DhabiCONSULTANT : Pioneer Engr.MEP CON.    : Gulf SailSCOPE : BMSPRODUCT : HONEYWELL

SKY GARDEN TOWER

PROJECT  TYPE : TowersLOCATION : Dubai, JBRCONSULTANT : NEBMEP CONT.         : Commodore Cont. LLCSCOPE : Metering & Energy SystemPRODUCT : Hydrometer

AL BATEEN TOWERS

Page 71: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

71

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Abu DhabiCONSULTANT : APGMEP CONT. : EcothermSCOPE : BTU SystemPRODUCT : HYDROMETER

AABAR TOWER

PROJECT  TYPE : TowerLOCATION : Dubai, Bus. BayCONSULTANT : NovaMEP CONT.         : SIGMA ENGR. LLCSCOPE : BMSPRODUCT : HONEYWELL

BURLINGTON TOWER

Page 72: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

72

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Dubai, Business Bay RoadCONSULTANT : Lacaza/HydroMEP CONT. : THERMO LLCSCOPE : BMSPRODUCT : Honeywell

METROPOLIS TOWER

PROJECT  TYPE : TowerLOCATION : Dubai, DSOCONSULTANT : LacasaMEP CONT. : Omega Engr.SCOPE : BMSPRODUCT : HoneywellNo. of Points : 1,200

JADE TOWER

Page 73: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

73

7. Major Executed Projects

6312 D

PROJECT  TYPE   : TowersLOCATION : Abu DhabiMEP CONT. : Commodore Cont. LLCSCOPE : BTU SystemPRODUCT : HYDROMETER

SARAYA CREEK TOWERS

PROJECT  TYPE : Residential TowerLOCATION : Dubai, IMPZ AreaCONSULTANT : bdpl Arch. & Consult.MEP CONT.         : Omega EngineeringSCOPE : BMSPRODUCT : HoneywellNo. of Points      : 3,500

OAKWOOD TOWER

Page 74: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

74

7. Major Executed Projects

6312 D

PROJECT  TYPE   : TowerLOCATION : Dubai, DSOCONSULTANT : LacasaMEP CONT. : Omega Engr.SCOPE : BMSPRODUCT : HoneywellNo. of Points : 1,200

CORAL TOWER

SAPHIRE TOWER

PROJECT  TYPE : TowerLOCATION : Dubai, DSOCONSULTANT : LacasaMEP CONT.         : Omega Engr.SCOPE : BMSPRODUCT : HoneywellNo. of Point    : 1,200

Page 75: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

75

7. Major Executed Projects

6312 D

RUBY TOWER

PROJECT  TYPE   : TowerLOCATION : Dubai, DSOCONSULTANT : LacasaMEP CONT. : Omega Engr.SCOPE : BMSPRODUCT : HoneywellNo. of Points : 1,200          

PROJECT  TYPE : TowerLOCATION : Dubai, Business Bay CONSULTANT : RMJMMEP CONT. : Omega Engr.SCOPE : BMSPRODUCT : HoneywellNo. of Points : 3,500

WEST WHARF TOWER

Page 76: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

76

7. Major Executed Projects

6312 D

PROJECT  TYPE : Twin TowersLOCATION : Dubai, Bus. Bay CONSULTANT : Hydro Engr.MEP CONT. : United MastersSCOPE : BMSPRODUCT : HoneywellNo. of Points : 3,500

MAYFAIR TOWERS

PROJECT  TYPE : TowerLOCATION : Abu DhabiCLIENT : Guardian Towers RealtyCONSULTANT : DYENAMEP CONT. : EFECOSCOPE : CO Monitoring SystemPRODUCT : Honeywell

GUARDIAN TOWER

Page 77: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

77

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Dubai, JBRCONSULTANT : NEBMEP CONT. : RadiantSCOPE : BMSPRODUCT : Honeywell

DOME TOWER

PROJECT  TYPE : TowerLOCATION : DubaiMEP CONT. : Verger Delporte UAE Ltd.SCOPE : BMSPRODUCT : HONEYWELL

ARBIFT TOWER

Page 78: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

78

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Abu DhabiCONSULTANT : E‐TAN CONSULTINGMEP CONT. : Commodore Cont. LLCSCOPE : BTU Metering  SystemPRODUCT : HYDROMETER

LEAF TOWER

PROJECT  TYPE : TowerLOCATION : DubaiCONSULTANT : AREXMEP CONT. : Sigma EngR.  LLCSCOPE : BMSPRODUCT : HONEYWELL

OXFORD TOWER

Page 79: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

79

7. Major Executed Projects

6312 D

PROJECT  TYPE : HotelLOCATION : Dubai, DeiraMEP CONTRACTOR : KhansahebSCOPE : Building Management SystemPRODUCT : Honeywell

TAJ HOTEL REFURBISHMENT - DUBAI

Page 80: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

80

7. Major Executed Projects

6312 D

AL OSAIMI RESORT & RES’L APTS.

PROJECT  TYPE` : Hotel, Resort & ApartmentsLOCATION : DubaiSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 81: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

81

7. Major Executed Projects

6312 D

PROJECT  TYPE : HotelLOCATION : Dubai, DeiraCONSULTANT : ArencoMEP CONTRACTOR : DiplomatSCOPE : Integrated Building Management SystemPRODUCT : Honeywell

SHERATON HOTEL, CREEK

Page 82: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

82

7. Major Executed Projects

6312 D

PROJECT  TYPE : HotelLOCATION : Dubai, JBRMEP CONTRACTOR : Thermo LLCSCOPE : Building Management SystemPRODUCT : HONEYWELL

JBR RAMADA PLAZA HOTEL

Page 83: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

83

7. Major Executed Projects

6312 D

PROJECT  TYPE : HotelLOCATION : FujairahMEP CONTRACTOR : MenascoSCOPE : Building Management SystemPRODUCT : HONEYWELL

MINA ALFAJER (FAIRMONT) HOTEL

Page 84: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

84

7. Major Executed Projects

6312 D

PROJECT  TYPE : HotelLOCATION : Dubai, JBRMEP CONTRACTOR : Thermo LLCSCOPE : Building Management SystemPRODUCT : HONEYWELL

JBR HILTONPLAZA HOTEL

Page 85: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

85

7. Major Executed Projects

6312 D

RITZ CARLTON, DUBAI

PROJECT  TYPE : HotelLOCATION : Dubai, JBRMEP CONT. : Thermo LLCSCOPE : BMSPRODUCT : HONEYWELL

Page 86: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

86

7. Major Executed Projects

6312 D

PROJECT  TYPE : Hotel LOCATION : Dubai, Sheikh Zayed Road CLIENT : Gloria HotelsCONSULTANT : NEBMEP CONT. : Verger Delporte UAE LtdSCOPE : IBMSPRODUCT : HoneywellPROTOCOL : BACnetNo. of Points : 10,000

DALMA GLORIA HOTEL

PROJECT  TYPE : Hotel LOCATION : Dubai, Sheikh Zayed RoadCONSULTANT : NEBMEP CONT. : Verger Delporte UAE LtdSCOPE : IBMSPRODUCT : HoneywellNo.  Of Points : 10,500

AL YASSAT GLORIA HOTEL

Page 87: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

87

7. Major Executed Projects

6312 D

PROJECT  TYPE : TowerLOCATION : Dubai, DSOCONSULTANT : MEECONMEP CONT. : Larsen and ToubroSCOPE : BMSPRODUCT : HoneywellNo. of Points : 3,500

APRICOT TOWER

ROTANA BEACH RESIDENCE & HOTELS

PROJECT  TYPE : HotelLOCATION : DubaiSCOPE : BMSPRODUCT : Honeywell

Page 88: MALLS HOSPITALSINFRASTRUCTURE HOTELS … D - LVD Pre-Qualification... · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System

886312 D

7. Major Executed Projects

PROJECT  TYPE : Mall & ResidencesLOCATION : FujairahMEP CONTRACTOR : ETASCOPE : Building Management SystemPRODUCT : HONEYWELL

FUJAIRAH COMMERCIAL COMPLEX