Transcript
Page 1: MAIN HIGH SPEED/HIGH CAPACITY RAILWAYS · 2019-12-10 · MAIN HIGH SPEED/HIGH CAPACITY RAILWAYS 10 10 8 8 11 1 4 11 2 7 1 7 6 3 14 15 16 12 4 2 5 5 9 9 13 13 XX End of works XX Work

8.

11.

5.

14.

13.

6.

4.

2.1.

3.

7.

12.

9.

10.

ITALY“Fiorenza” Multipurpose Train Depot Milan(1987-2000)

SWITZERLANDGotthard Base TunnelBodio and Faido Lots(2001-2014)

FRANCETGV Nord Aronde

(Lot 19-16)(1989-1992)

FRANCETGV Lille and

A5 viaduct(1989-1992)

TURKEY“Orient Express”,High-Speed Railway Halkali-Kapikule(2019-in progress)

ITALYFlorence-Rome"Direttissima"High Speed Railway (1970-1983)

ITALYTurin-MilanHigh SpeedRailway System(2002-2009)

TURKEYKosekoy-Gebze,Section of the Ankara-IstanbulHigh Speed Train Project(2011-2016)

ITALYNaples-Bari High Capacity Railway Line Apice-Hirpinia section(2019-in progress)

FRANCETGV Line Rhone-Alpes

"Rhone" Viaduct"(1989-1992)

ITALY"The Brenner Base Tunnel", "IsarcoUnderpass" and "Tulfes-Pfons" sections(2014-in progress)

ITALYTerzo Valico dei Giovi,

Milan - GenoaHigh Speed, High-Capacity

Railway Line Section(2012-in progress)

ITALYBologna-FlorenceHigh Speed Railway System(1996-2009)

ITALYMilan-Naples High Speed Railway System “Bologna Junction” (2000-2009)

1998

2007

1999 2000 2001 2002 2003 2004 2005 2006 2008 2009 2010 2011

1981

1990

19821983198419851986198719881989

1971

1980

1972

1973

19741975

19761977

1978

1979

1970

1968

1969

1991

19921993 19

94

2012 2013 2014

2016 2017 2018 2019

2015

1997

1995 1996

COMPLETED AND ONGOING PROJECTSMAIN HIGH SPEED/HIGH CAPACITY RAILWAYS

10

10

88 11

1

4 11

2

7

1

7

6

3141516

12

245

5 9

9

13

13

End of worksXX

Work startXX

OngoingXX

ITALYPalermo-Catania RailwayBicocca-Catenanuovasection(2019-in progress)

15.

ITALYVerona-PaduaHigh Speed Railway(2019-in progress)

16.

Top Related